CS/M.Tech (PE)/SEM-1/PEM-106/2009-10

2009
PROJECT ENGINEERING AND MANAGEMENT

Time Allotted : 3 Hours

Full Marks : 70

The figures in the margin indicate full marks.

pap

Candidates are required to give their answers in their own words


as far as practicable.
Answer any five questions.

a)

Write down different stages of an industrial project.

b)

What

are

wb
er.

1.

the

common

goals

disciplines involved in a project ?


c)

a)

all

engineering
3

2+6

Briefly discuss about the following methods of demand

i)

Delphi method

ii)

End-use method.

in
a c.
ut .

forecasting :

b)

of

What are the different types of contract ? Briefly explain


a BOO type contract.

2.

5 14 = 70

22

Prove that the price elasticity at a point on a linear

demand graph is given by the ratio of the lower segment


to the upper segment.
200043

[ Turn over

CS/M.Tech (PE)/SEM-1/PEM-106/2009-10
c)

What do you mean by an indifference curve ? Find out

/q
p:/
htt

the elasticity of satisfaction for

3.

a)

i)

two perfect substitutes, and

ii)

two perfect complements.

Why are the social cost and benefits of a project


different from their monetary values ?

b)

2+4

According to the UNIDO approach of the economic


appraisal of a project, define the following terms :

pap

c)

i)

Tradable and non-tradable goods, and

ii)

Merit goods and demerit goods.

Three items X, Y and Z are imported at costs of $ 6000,

wb
er.

$ 3000 and $ 1000, respectively. Let one dollar buy


either 5 units of X or 10 units of Y or 2 units of Z. Let
the domestic prices of X, Y and Z be Rs. 10, Rs. 3 and
Rs. 35 respectively. Find the value of one dollar in
Indian Rupee terms.
4.

a)

Briefly explain the different schemes of technology


acquisition.

What is the role of the statutory bodies in the different


stages of a project ?

5.

in
a c.
ut .

b)

c)

Discuss about any four methods of site selection.

a)

What do you mean by the payback period of a project ?

Discuss about the advantage and the limitation of the


payback period method of financial appraisal of a
project.
200043

1+3

CS/M.Tech (PE)/SEM-1/PEM-106/2009-10
b)

Define product mix. Derive the expression for the gross

/q
p:/
htt

break-even quantity for a system having n number of


products with

different variable costs and

prices.

c)

selling
2+3

Calculate the Net Present Value ( NPV ) for a project


with following information :

pap

State whether the project is acceptable or not.


6.

a)

Prepare the balance sheet of a company with the

wb
er.

following information :
i)

Current ratio = 2 : 1

ii)

Quick ratio = 3 : 4

iii)

Working capital = Rs. 12,500

Assume all other data as necessary.

in
a c.
ut .

b)

If the cost of a machine is Rs. 5,100 and the salvage


value after 5 years is Rs. 1,000, find the amount of

depreciation in each year using the sum-of-the-years


digits method.
c)

List down any three differences between debentures and


shares.

200043

[ Turn over

CS/M.Tech (PE)/SEM-1/PEM-106/2009-10
7.

The network for a project consisting of eight activities is

/q
p:/
htt

shown below, together with the time ( in days ) required to


complete each stage.

pap

a)

State the four possible paths through the network and


the total time required to complete the project in each
case.

Deduce the critical path, its duration and importance.

c)

Explain briefly the information conveyed by the total


float.

8.

wb
er.

b)

Write short notes on any four of the following :


Detained project report

b)

Role of consultants in a project

c)

Environmental impact assessment study

d)

Slutsky equation and its significance

e)

Internal rate of return.

200043

1
2

in
a c.
ut .

a)

43