[BELES-1 SUGAR FACTORY STATUS]

S. no

Description

Current status

Next work

Required material

Responsible
company

Cane preparation
1.
2.
3.

4.
5.

Weigh bridge CR Feeding table


Feeding table
control room
Cane kicker for
feeding table
Weigh bridge

6.

Foundation on progress
Machineries arrived
Housing on progress
Material arrived
Concrete civil foundation work
on progress
Installation manual arrived
Housing civil work on progress
Not started

- Civil work on excavation


Cane unloader &
Trolley

7.

- Not started
Cane equalizer

8.

- Not started
Cardinal Drum

9.

Cane carrier

10. Cane carrier


control room
11. Inline shredder
1 | Page

Anchor bolt installation on


progress

- Housing on progress
- On lean concrete

Anchor bolt installation


- Erection manual
Erection weigh bridge
- Modification design
Completing civil work
- Installation manual
Cabling
Anchor bolt installation
- Full machinery and
Structure support erection
support structure
Assembly of feeding table
Installation of controlling - Control unit
- Installation manual
unit
- Assemble on feeding table - Cane kicker machine
- Assembly manual
after feeding table
erection
- Civil foundation
construction
- Anchor bolt installation
- Cane unloader installation
Machine erection
- Assemble on cane carrier
after cane carrier table
erection
- Assemble on cane carrier
after cane carrier table
erection
- Anchor bolt installation
- Support structure and
assembling of cane
carrier
- Installation of controlling
unit
- Constructing foundation

Hibret
Tools
Hibret
Tools
Hibret
Tools
Hibret
tools
Hibret
tools

- Anchor bolt with anchor


bolt plan
- Cane unloader machine
- Erection manual

Hibret
tools

- Cane equalizer
- Assembly manual

Hibret
tools

- Cardinal drum machine


- Assembly manual

Hibret
tools

- Support structure and


cane carrier
machineries
- Assembly manual
- Control unit
- Installation manual
- Anchor bolt

Hibret
tools

Hibret
tools
Hibret

[BELES-1 SUGAR FACTORY STATUS]

12. Inline shredder


control room
13.
Inclined flat belt
conveyer
14.
Magnetic iron
separator

- Drive motor and shredder


shaft arrived

- Install anchor bolt

- Housing on progress

- Installation of controlling
unit
- Construction of civil
foundation
- Anchor bolt installation
- Machine erection

- Design completed
- Civil work on progress

- Civil work design completed


- Civil work on excavation

- Civil foundation
construction
- Anchor bolt installation
- Machine erection
- Anchor bolt installation
- Erection work

- Anchor bolt plan


- Installation guide
- Other accessories
Control unit
Installation manual
Anchor bolt and anchor
bolt plan
Inclined flat belt
conveyer machine
Erection manual
Anchor bolt and anchor
bolt plan
Magnetic iron separator
machineries
Erection manual
Anchor bolt with anchor
bolt plan
Full machineries
Erection manual

tools
-

Hibret
tools
Hibret
tools

Hibret
tools

Basic
metals
(Akaki)

15. Rake type in


feeding
distributor
conveyer
(Magasse
conveyer)
16. Diffuser

- Civil work on progress

- Foundation work completed

- Anchor bolt installation


- Diffuser erection

BMA
(German)

17. Diffuser control


room

- Civil work on progress

BMA
(German)

18. Dewatering mill

- Housing foundation on
anchorage
- Machine foundation civil work on progress

AKAKI
Basic
Metals

2 | Page

- Anchor bolt with anchor


bolt plan
- Diffuser machine
Installation of control unit - Control unit installation
manual
- Control unit
Completing housing and - Machinery anchor bolt
- Dewatering mill
machinery civil work
Erecting housing structure
machine
Anchor bolt installation for - Anchor bolt plan and
machines
installation manual
Erecting and assembly of - Erection manual

[BELES-1 SUGAR FACTORY STATUS]


mill machines
- Completion of civil work
- Control unit installation

19. Dewatering mill


control room

- Housing construction on
progress

20. Dewatering mill


condenser

- Foundation work on progress

- Completion of civil work


- Anchorage
- Machine erection

21. Bagasse
transporter

- Yet not started

Civil work design


Civil work construction
Anchor bolt installation
Machine erection

- Control unit
- Installation manual

Akaki
(Basic
Metals)
Akaki
(Basic
Metals)

- Anchor bolt and anchor


bolt plan
- Anchor bolt installation
manual
- Condensate machine
- Erection manual
- Anchor bolt, anchor bolt
installation plan and
installation manual
- Bagasse transporter
machine

MARU
metals

- Anchor bolt, anchor bolt


installation plan and
installation manual
- Boiler and its auxiliaries

Teams
internatio
nal
(china)

Teams
internatio
nal
(china)

Teams
internatio
nal
(china)

Steam and Power Generation


1.

Boiler and its


auxiliaries

Civil work on progress

2.

Turbine,
Generator, stator
and rotor

Civil work under


excavation

3.

Switch
auxiliaries,
transformer and
control unit and
3 | Page

Design completed
Construction yet not
started

Civil work
completion
Anchor bolt
installation
Machine erection
and assembly

Civil work
completion
Anchor bolt
installation
Machine erection
and assembly
Housing
construction
Machine installation
-

Anchor bolt, anchor bolt


installation plan and
installation manual
Turbine, Generator,
stator and rotar
machines
Switch auxiliaries,
transformer, control
unit and other utilities
Installation manual

[BELES-1 SUGAR FACTORY STATUS]


other utilities

Process House
1.

2.

M-SP-501-11
SCREENED JUICE
TANK CAPACITY
75m3

M-SP-502-11
LIME MIXING
REACTION TANK

civil work on progress

Civil work not started

M-SP-503-11
LIME JUICE
RECEIVING &
(RETENTION)
TANK CAP. 75 m

Not started

4 | Page

3.

civil work
anchorage
machine erection

completion of
housing and
machinery design
completion of
housing and
machine foundation
civil work
anchorage
machine erection
completion of
housing and
machinery civil
foundation design
completion of
housing and
machine foundation
civil work
anchorage
erection of support
structure
machine erection

Anchor bolt with


anchor bolt plan
for plat form
Installation
manual
Housing and
machine
foundation design
Anchor bolt,
plate, anchor bolt
plan and anchor
bolt installation
manual
Lime mixing
reaction tank
Housing and
machine
foundation design
Anchor bolt,
plate, anchor bolt
plan and anchor
bolt installation
manual
Lime mixing
receiving tank
and its support
with erection
manual

MH, R & D
MIE

MH, R & D
MIE

[BELES-1 SUGAR FACTORY STATUS]


4.

5.

6.

M-SP-504-11
FLASHING
VESSEL
M-SP-505-11 SRI
CLEARIFIER
9.5M
M-SP-506-11
FLOCULENT
PREPARETION

Machine foundation
completed
Machinery arrived
civil work done

Machinery erection

Anchor bolt
installation
Support structure
erection
Machine erection

7.

M-SP-507-11
FLOCULENT
STORAGE TANK
3m

civil work done

Anchor bolt
installation
Support structure
erection
Machine erection

8.

M-SP-508-11
CLEAR JUICE
RECIVING TANK
75m

civil work done

Anchor bolt
installation
Machine erection

9.

M-SP-509-11MUD
RE-CICULATION

civil work done

5 | Page

Anchor bolt
installation
Support structure

Installation
manual
equipment
Erection manual
Other accessories

MIE

Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Support structure
Machine with
erection manual

MIE

Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Support structure
Erection manual

MIE

Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Erection manual

MIE

Anchor bolt,
plate, anchor bolt

MIE

[BELES-1 SUGAR FACTORY STATUS]


TANK 20m
-

erection
Machine erection
-

10. M-SP-510-11
MUD FEED MIXER
16m

11. M-SP-511-11
VACUUM
FILTERATE
RECEIVERR

Not started

civil work done

complete civil work


design
Construct civil work
anchorage
Machine erection
Anchor bolt
installation
Machine erection

12. M-SP-512-11
CASCADE
CONDENSER DIA
1000x4000

13. M-SP-51311CYCLONE
BAGACILLO
SEPERATOR

14. M-SP-514-11
BAGGCILO
SCREENING with
hopper

6 | Page

Not started

Not started

Not started

complete civil work


design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage

plan, anchor bolt


installation
manual
Support structure
Machine with
erection manual
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Machine
Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Erection manual

MH and
R&D
MEI

MIE

Civil work design


Anchor bolt,
plate, anchor bolt
installation guide
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

[BELES-1 SUGAR FACTORY STATUS]

15. M-SP-515-11(A)
MUD BIN &
STRUCTURE FOR
MUD BIN

16. M-SP-516-11 hot


water tank for
vacuum filter
15m3

17. M-SP-517-11 lime


elevator

18. M-SP-518-11 OF
LIME SLAKER.[1]

Civil work on progress

19. M-SP-519-11MILK
OF LIME
STORAGE TANKS
(2)

20. M-SP-520-11
JUICE HEATER
375M2

7 | Page

Not started

Not started

Not started

Not started

Civil work done

Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
Anchorage
Support structure
erection
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
Anchorage
Support structure
erection
Machine erection
Anchor bolt
installation
Machine erection

Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide

Civil work design


Anchor bolt,
plate, anchor bolt
installation guide
Support structure
Erection manual

Civil work design


Anchor bolt,
plate, anchor bolt
installation guide
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Support structure
Machine with
erection manual
Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

MIE

[BELES-1 SUGAR FACTORY STATUS]

21. M-SP-52111CONDENSET
CIGAR TANK FOR
JUICE HEATER

Not started

Anchor bolt
installation
Machine erection

22. M-SP-522-11
CONDENSATE
CIGAR TANK FOR
EVAPORTORS
DN2000

Not started

Anchor bolt
installation
Machine erection

23. M-SP-523-11
DIRECT CONTACT
HEATER # DC-01

Anchor bolt
installation
Machine erection

24. M-SP-524-11
SYRUP BOTTLE

Civil work on progress

8 | Page

Anchor bolt
installation
Machine erection

manual
Machine with
erection manual
Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Machine with
erection manual

MIE

Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Machine with
erection manual

MIE

Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Machine with
erection manual

MIE

Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation

MIE

[BELES-1 SUGAR FACTORY STATUS]

25. M-SP-525-11 talo


section tanks

26. M-SP-526-11
AREATION
BOTTEL FOR
SYRUP

27. M-SP-52711telo_clarifier
for SYRUP

28. M-SP-528-11
CAUSTIC SODA
STORAGE TANK
25m3

29. M-SP-529-11
JUICE HEATER
FOR LIQUOR
100m2

Civil work on progress

Not started

Not started

Not started

civil work done

complete civil work


design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
Anchor bolt
installation
Machine erection

30. M-SP-530-11
REACTION TANK
9 | Page

Civil work done

Anchor bolt
installation

manual
Erection manual
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide

Civil work design


Anchor bolt,
plate, anchor bolt
installation guide
Machine
Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Machine with
erection manual

Anchor bolt,
plate, anchor bolt

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

MIE

MIE

[BELES-1 SUGAR FACTORY STATUS]


FOR SYRUP

Machine erection

31. M-SP-53111telo_clarifier
for LIQOUR

32. M-SP-532-11
BAGGACEILO
BLOWER

33. M-SP-533-11
REACTION TANK
FOR LIQUOR

Not started

Not started

34. M-SP-534-11
AREATION
BOTTEL FOR
LIQUOR

35. M-SP-535-11
SCUM
DESWEETENING
CLARIFIER

36. M-SP-536-11
PANSUPPLY

10 | P a g e

Not started

Not started

Not started

civil work done

complete civil work


design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
Anchorage
Support structure
erection
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design

plan, anchor bolt


installation
manual
Erection manual
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide

Civil work design


Anchor bolt,
plate, anchor bolt
installation guide

Civil work design


Anchor bolt,
plate, anchor bolt
installation guide
Support structure
Machine with
erection manual
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Machine
Anchor bolt,
plate, anchor bolt

MH and
R&D
MEI
MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

MEI

[BELES-1 SUGAR FACTORY STATUS]


STRAGE TANK
37. M-SP-537-11 DE
CLOURZING
PREPARATION
TANK

38. M-SP-538-11
DEEP BED FILTER

39. M-SP-539-11
CENTRIFUGAL
HOT WASH
WATER TANK
50m3
40. M-SP-540-11
FLUIDIZED BED
SUGAR DRYER

41. M-SP-54111TALO FLOAT


PREPARATION &
HOLDINGTANKPREPARATION
TANK
42. M-SP-542-11
LIME SUCARATE
PREPARATION
11 | P a g e

Not started

Not started

civil work done

Construct civil work


anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
anchorage
Machine erection

installation guide
-

Not started

civil work done

civil work done

complete civil work


design
Construct civil work
anchorage
Machine erection

anchorage
Support structure
erection
Machine erection

Anchor bolt
installation
Support structure

Civil work design


Anchor bolt,
plate, anchor bolt
installation guide

Civil work design


Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual

MH and
R&D
MEI

MH and
R&D
MEI

MEI

Civil work design


Anchor bolt,
plate, anchor bolt
installation guide
Machine with
erection manual
Anchor bolt,
plate, anchor bolt
installation guide
Support structure
Erection manual

MH and
R&D
MEI

MEI

Anchor bolt,
plate, anchor bolt
plan, anchor bolt

MIE

[BELES-1 SUGAR FACTORY STATUS]


AND
HOLDINGTANKPREPARATION
TANK

erection

43. M-SP-543-11
SUGAR BIN
CAPACITY 45T

44. M-SP-544-11
condensate
receiving tank

45. M-SP-54511SUGAR
GRADER
(HOPPER TYPE)
GENERAL
ARRANGEMENT
46. M-SP-546-11PAN
WASH TANK
50m3

47. M-SP-547-11
phosphasic acid

Machine erection

Not started

Not started

Not started

complete civil work


design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
Anchor bolt
installation
Support structure
erection
Machine erection

Not started

civil work done

12 | P a g e

installation
manual
Support structure
Machine with
erection manual
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual

Civil work design


Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Support structure

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

MIE

[BELES-1 SUGAR FACTORY STATUS]

48. M-SP-54811sugar belt


conveyor for go
down

49. M-SP-54911sugar belt


conveyor 12m

50. M-SP-550-11
sugar hopper

51. M-SP-551-11
SWEET WATER
TANK

52. M-SP-552-11
MASSICUTE REHEATER

13 | P a g e

Not started

Not started

Not started

Not started

Civil work done

complete civil work


design
Construct civil work
Anchorage
Support structure
erection
Machine erection
complete civil work
design
Construct civil work
Anchorage
Support structure
erection
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
Anchorage
Support structure
erection
Machine erection
Anchor bolt
installation
Machine erection

Machine with
erection manual

Civil work design


Anchor bolt,
plate, anchor bolt
installation guide
Support structure
Machines with
erection manual
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Support structure
Machines with
erection manual
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Support structure
Machines with
erection manual
Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

MIE

[BELES-1 SUGAR FACTORY STATUS]

53. M-SP-553-11
CONDENSER

Civil work done

Anchor bolt
installation
Machine erection

54. M-SP-554-11
CONTINIOUS
VACUUM PAN
102 M3

Civil work done

Anchor bolt
installation
Machine erection

55. M-SP-555-11
CONTINUOUS
CENTRIFUGAL

Civil work done

Anchor bolt
installation
Machine erection

56. M-SP-556-11
REFINED SUGAR
CENTRIFUGALS1
1
14 | P a g e

Civil work under


construction

Civil work
completion
Anchor bolt
installation
Machine erection

manual
Machine with
erection manual
Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Machine with
erection manual

MIE

Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Machine with
erection manual

MIE

Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Machine with
erection manual

MIE

Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation

MIE

[BELES-1 SUGAR FACTORY STATUS]

57. M-SP-557-11
SEED
CRYSTALLIZER
(35 CUIB METER)

58. M-SP-558-11
MASSECUITE
RECEIVING
CRYSTALLIZER

59. M-SP-559-11
PANSUPPLY
STRAGE TANK
(SS)

60. M-SP-560-11
MOLASSES
RECEIVING TANK

Not started

Not started

Not started

civil work under


construction

61. M-SP-561-11
VERTICAL
CRYSTALLIZER
175 m3
15 | P a g e

started but under


rework

complete civil work


design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
Anchorage
Support structure
erection
Machine erection
Civil work
completion
Anchor bolt
installation
Support structure
erection
Machine erection

Civil work
completion
Anchor bolt
installation
Machine erection

manual
Machine with
erection manual
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Support structure
Machines with
erection manual
Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Erection manual

Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

MIE

MIE

[BELES-1 SUGAR FACTORY STATUS]

62. M-SP-562-11 A
SUGAR
REMELTER TANK
30m3

63. M-SP-563-11
Mingler II Rotor

Not started

Not started

64. M-SP-564-11
CAW BAW
MASSECUITE
PUGMILLNGTH 4
M

65. M-SP-565-11
C.F.W PUGMILL
LENGTH

Not started

66. M-SP-566-11
RAW
MASSECUITE
RECEIVING
CRYSTALLIZER

67. M-SP-567-11

16 | P a g e

Not started

Not started

Not started

complete civil work


design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection

complete civil work


design
Construct civil work
anchorage
Machine erection

complete civil work

manual
Machine with
erection manual
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Civil work design

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

MH and

[BELES-1 SUGAR FACTORY STATUS]


Refine Bach Pan
68. M-SP-568-11
HEAT
EXCHAINGER
FOR SYRAP
160m2

Civil work done

design
Construct civil work
anchorage
Machine erection
Anchor bolt
installation
Machine erection

69. M-SP-569-11
MASSECUITE
RECEIVING
CRYSTALLIZER

70. M-SP-570-11 1nd


EFFECT
EVAPORATOR
FOR QUINTUPLELAYOUT

71. M-SP-571-11 4th


EFFECT
EVAPORATOR
FOR QUINTUPLE

72. M-SP-572-11
sugar elevator

Not started

Not started

Not started

Not started

17 | P a g e

complete civil work


design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work

Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Machine with
erection manual
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Civil work design
Anchor bolt,
plate, anchor bolt

R&D
MEI

MIE

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

[BELES-1 SUGAR FACTORY STATUS]

73. M-SP-573-11
ROTARY SCREEN
FOR CLEAR
JUICE

-civil work done

anchorage
Machine erection

Anchor bolt
installation
Machine erection

74. M-SP-574-11
SEED
CRYSTALLIZER
(35m3)

75. M-SP-575-11
BATCH PAN (75
TON) WITH
MECHANICAL
CIRCULATOR

76. M-SP-576-11
CONTINUOUS
VACUUM PAN 68
m

Not started

Civil work on progress

Civil work onprogress

complete civil work


design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
Anchor bolt
installation
Machine erection

77. M-SP-577-11
FILTERATE
18 | P a g e

Civil work on progress

complete civil work


design

installation guide
Erection manual
Machine
Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Machine with
erection manual

MIE

Civil work design


Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Machine with
erection manual

MH and
R&D
MEI

Civil work design


Anchor bolt,

MH and
R&D
MEI

MIE

MH and
R&D

[BELES-1 SUGAR FACTORY STATUS]


COLLECTION
TANK CAP. 15m3.
78. M-SP-578-11 B.
PUGMILL FOR
LENGTH 11m

Construct civil work


anchorage
Machine erection

complete civil work


design
Construct civil work
anchorage
Machine erection

79. M-SP-57911COLD WATER


OVER HEAD
TANK 100m

80. M-SP-580-11
ENTRAINMENT
SEPERATOR

81. M-SP-581-11
RADIATOR FOR
SUGAR DRYER

Not started

Not started

Not started

-civil work done


-

complete civil work


design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
Anchor bolt
installation
Machine erection

82. M-SP-582-11 HOT


WATER OVER
HEAD TANK 80m
19 | P a g e

Not started

complete civil work


design
Construct civil work
anchorage

plate, anchor bolt


installation guide
Erection manual
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Machine with
erection manual

MEI

MH and
R&D
MEI

Civil work design


Anchor bolt,
plate, anchor bolt
installation guide

MH and
R&D
MEI

MH and
R&D
MEI

MIE

MH and
R&D
MEI

[BELES-1 SUGAR FACTORY STATUS]

83. M-SP-583-11
COLD AIR FAN
FOR SUGAR
DRYER

civil work done

Machine erection

Anchor bolt
installation
Machine erection

84. M-SP-584-11A,&B
HAEVY, C LIGHT
DILUTION

85. M-SP-585-11
CALORIFIER FOR
C-MASSECUITE
RE HEATING

86. M-SP-586-11
REFINE
MASSCUITE
PUGMILL(1)PUGMILL FOR
SEVEN
CENTRIFUGALS
LENGTH 12 M
87. M-SP-587-11
RUN-OFF

20 | P a g e

Not started

Not started

civil work done

complete civil work


design
Construct civil work
Anchorage
Support structure
erection
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
Anchor bolt
installation
Machine erection

Not started

complete civil work


design

Erection manual
Machine
Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Machine with
erection manual

MIE

Civil work design


Anchor bolt,
plate, anchor bolt
installation guide
Support structure
Erection manual
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Machine with
erection manual

MH and
R&D
MEI

Civil work design


Anchor bolt,

MH and
R&D
MEI

MIE

MH and
R&D

[BELES-1 SUGAR FACTORY STATUS]


RECEIVING TANK
CAPACITY 7.5 m

88. M-SP-588-11 A
MASSECUITE
PUGMILL
LENGTH 13

89. M-SP-589-11
FINAL MOLASSES
STORAGE TANK
12000 MUC

Not started

civil work under


construction

Construct civil work


Anchorage
Support structure
erection
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
Civil work
completion
Anchor bolt
installation
Machine erection

90. M-SP-590-11
sugar belt
conveyor 12m

91. M-SP-591-11
VACUUM FILTER

Not started

Not started

92. M-SP-592-11
DUST CATCHING
21 | P a g e

Not started

complete civil work


design
Construct civil work
Anchorage
Support structure
erection
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design

plate, anchor bolt


installation guide
Support structure
Erection manual
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Anchor bolt,
plate, anchor bolt
plan, anchor bolt
installation
manual
Machine with
erection manual

MEI

MH and
R&D
MEI

MIE

Civil work design


Anchor bolt,
plate, anchor bolt
installation guide
Support structure
Erection manual
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Civil work design
Anchor bolt,

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D

[BELES-1 SUGAR FACTORY STATUS]


SYSTEM OF
SUGAR DRYER
93. M-SP-593-11 CSUGARREMELTER

Construct civil work


anchorage
Machine erection

complete civil work


design
Construct civil work
anchorage
Machine erection

94. M-SP-594-11
MOL VIBRATORY
SCREEN 1000 X
4000

95. M-SP-595-11telo
section tanks

96. M-SP-59611Refine Seed


Magma Mixer

Not started

Not started

Not started

Not started

NB

There may be missed item


Most of the control unit supplied from MIE is arrived
Piping work do not included

22 | P a g e

complete civil work


design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection
complete civil work
design
Construct civil work
anchorage
Machine erection

plate, anchor bolt


installation guide
Erection manual
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Civil work design
Anchor bolt,
plate, anchor bolt
installation guide
Erection manual
Machine

MEI

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI

MH and
R&D
MEI