Planning Schedule for Construction of Car Park Shade at Gulf Helicopter

Complex
Sl.No ACTIVITY

Date:

11-Oct

Plan

Actual

% Complete

Actual (beyond plan)

% Complete (beyond plan)

PLAN
PLAN
ACTUAL ACTUAL PERCENT
START DURATION START DURATIONCOMPLETE PERIODS
9/28

1 Excavation for kerb stone except gate28-Sep


2 PCC for kerb-stone except mid & gate 4-Oct
3 Kerb-stone laying except mid & gate 5-Oct
4 Footing Excavation & Column Erectio 10-Oct
5 Footing Concreting
15-Oct
6 Kerb stone excavation along mid-line 16-Oct
7 PCC for kerb-stone along mid- line & 16-Oct
8 Kerb stone laying along left-out lines 17-Oct
9 Grading of soil to maintain 0.5% slop 17-Oct
10 Asphalt work of 70mm for 1200m2
19-Oct
11 Beam and Gutter erection and weldin 21-Oct
12 Roofing work of car shade
22-Oct
13 kerb Painting
21-Oct
14 Flush-kerb laying along the entrance 25-Oct
15 Hot applied paint and Road marking 25-Oct
16 Project completion and Hand-over
26-Oct

28-Sep

4-Oct

6-Oct

10-Oct

100%
100%
100%
42%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

9/29 9/30 10/1 10/2

10/3

10/4 10/5 10/6 10/7 10/8 10/9 10/10

### 10/12 10/13 10/14 10/15 10/16 10/17 10/18 10/19 10/20 10/21 10/22 10/23 10/24 10/25 10/26