Advantages:
Scaling reduction from the bottom to the wellhead;
Fluid viscosity reduction;
Flow rate increase by on average of 20%;
Mean time between failures increased by a factor of more than 2 time;
Protection over the whole run life of electrical submersible pump unit;
Easy shipping and storage.
PILOT-1 Installation Diagram
PILOT-1 effect
OILFIELD EQUIPMENT
Case studies
Increase of Mean time between failures after Pilot-1 installation
in several oilfields
558 528
600
507
500
300
262
200
100
385
335
400
48
218
93
178
141
216
119
206 177
74 70 71
253
72
Before Pilot-1
installation
Specifications
No.
1
1.1
1.2
1.3
1.4
1.5
1.6
2
2.1
2.2
Parameter
Value
OILFIELD EQUIPMENT
2.3
2.4
2.5
2.6
2.7
2.8
Parameter
Accuracy of temperature
measurement, %
Accuracy of pressure
measurement, %
Resolution of pressure
measurement, atm
Resolution of temperature
measurement, deg
Data link
Data link between surface and
downhole units
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
3
3.1
3.2
3.3
3.4
Value
control station using MODBUS protocol. Measured parameters can
be transmitted by GSM modem (optionally).
2.0
0.5
Up to 0.1
Up to 1.0
Digital
Data transmission is done through the zero point of the stator
winding of Motor - motor stator winding - power cable - high-voltage
winding of the transformer.
From 1000 V to 4000 V
Powered by additional stator winding of Motor (AC power sine wave
with a frequency of 30 .. 100 Hz). Supply voltage of downhole unit is
16 .. 70 V.
Supply voltage of surface unit is 220 V 15%.
Maximum AC current is not more than 2 A.
OILFIELD EQUIPMENT
5.2
Parameter
Value
Operational safety
Design