Unit
Quantity
L.Sum
m3
1120
Filling works:
Supplying materials and filling with approved screened subbase materials (Granular Materail)maximum size is 2in for
the building and where required within the area inside or
outside of the Building such as aprons, walkways, garden,
4
etc with compaction %95 (according to the
specification) ,Filling should be with in layers,each layer
should not be more than 25 cmin thick, according to the
instructions of the site engineer with all necessary works for
the final two layers.
m3
2000
B Concrete Work
Item Description
Unit
Quantity
Plain Concrete (Lean Concrete):Provide Materails and cast plain Concrete with thickness to
the required elevations ,the price include laying two layers of
thick nylon. (The nylon should also cover the sides of
excavation of the footings and extend on land for 50cm to
both sides of excavation).
m2
500
m3
260
m3
500
m2
900
m3
150
m2
600
Steel Stair
D Building Works
Unit
Quantity
m3
150
m3
450
m2
300
Marble tiles arround windwos and Doors;Provide marbles with all required materails to installs
marbles arround doors and windows with 25 cm width and 3
cm in thick according to the drwaings and instruction of the
supervisor engineer,
m.l
300
Cement plastering:
Supply and install THREE COATS smooth finish cement and
sand plaster, including all necessary angle beads, grooves,
2
metal at hand all accessories, price should include water
curing, and cleaning works, complete as shown on drawings
& as per specifications.
m2
1000
m2
700
Item Description
Exterior Paint:Provide materails and labors for painting exterior side of the
mosque in three layers with best turkish paint according to
the drwaings and instruction of the supervisor engineer.
Unit
Quantity
m2
2000
m2
500
m2
300
m2
550
m2
300
m.l
75
m2
100
Item Description
Roof Tile:Provide materails and labors for installing the Roof Tile over
4 the slab with best turkish quality with all neccesary material,
according to the drwaings and instruction of the supervisor
engineer.
Unit
Quantity
Gypsum plastering:
Supply materials and plastering with gypsum (using best
type of gypsum approved by site engineer) in two layers
11 minimum thickness 15 mm using aluminum straight edges
for guides each 80cm and at the corner of walls for walls ,
corridors , entrance hall and the area indicated in the
drawings
m2
1000
Interior Paint:Provide materails and labors for painting Interior side of the
12
rooms in three layers with best turkish paint according to the
drwaings and instruction of the supervisor engineer.
m2
1500
False Celings:Supply and install Normal & Water Tight plastic Boards
suspended false ceiling with approved equally(60-60)cm in
size, including concealed galvanized suspension system,
13
supporting, access panels, tapes with batty layer and make
openings for different services, complete as specified.
Normal Gypsum Boards suspended ceiling, generally ( colors
to Engineer's approval).
m2
2100
m2
200
no.
20
Item Description
Plastic Celings:
Supply and install Normal & Water Tight plastic Boards
suspended plastic ceiling with approved equally(25-600)cm
14 in size, including concealed galvanized suspension system,
supporting, access panels, tapes with batty layer and make
openings for different services, (colors to Engineer's
approval).
Wood Doors:Provide 45mm thick hollow core wooden doors comprising
of hard wood frames, hard wood leaf frames and lipping,
27x40mm vertical soft wood planks with foam injection in
15
cavity, MDF leaf panels with Oak wood veneer, including
grooves, fixing, fittings, clear lacquer paint for wooden parts
all to drawings,
---Doors With (2,2*1)m size
Unit
Quantity
Iron Doors:Supply all material and install Iron Doors turkish Style.
interior the door must be (50)mm thickness hard wood ,with
16
iron frame according to the drwaings and instruction of the
supervisor engineer.
Doors With (2,5*2.2)m size
no.
m2
50
m2
400
m2
750
Item Description
Unit
Quantity
no.
12
m2
1700
Isolation Protection:
Prepare all materials to installing 4mm thick torch applied
SBS modified bituminous polymer waterproof membrane,
22 including bitumen primer. After must be fixed the protection
over the membrane, all necessary preparation and fixing
works, complete as per specifications and to Engineer's
instructions
m2
600
Item Description
28
Item Description
Unit
Quantity
94
ming Pool
Price ($)
Amount ($)
3,000
3,000
2,000
2,000
4,480
8,000
ming Pool
Price ($)
Amount ($)
3,500
150
39,000
150
75,000
7,200
200
30,000
500
300,000
ming Pool
Price ($)
Amount ($)
70
10,500
150
67,500
20
6,000
30
9,000
8,000
1,400
ming Pool
Price ($)
Amount ($)
30
60,000
25
12,500
75
22,500
50
27,500
150
45,000
60
4,500
70
7,000
ming Pool
Price ($)
Amount ($)
6,000
3,000
20
42,000
15
3,000
200
4,000
ming Pool
Price ($)
Amount ($)
500
4,000
110
5,500
150
60,000
50
37,500
ming Pool
Price ($)
Amount ($)
25
300
10,200
3,000
1,350
37,800
ming Pool
Price ($)
Amount ($)
2,250
211,500
1,181,380
Quantit
y
Site Preparation,
provide machinery
and equipment for cutting the natural ground, removing debries,
and cleaning site according to design level, all the works should
be conducted according to drawings and instructions of
supervisor engineer.
L.Sum
Demarcation
of all community
area using proper survey system(recommended to be total station
equipment), the work includes all the required manpower,
tools ,equipment & materials to conduct the works, all the works
should be conducted according to IGTS & instructions of
supervisor engineer.
L.Sum
Excavation:excavation for foundation for all type of soil, rock, etc, starting at
existing ground levels, including removal of surplus excavated
materials from site to an approved dumping area,
m3
50
Filling works:
Supplying materials and filling with approved screened sub-base
materials (Granular Materail)maximum size is 2in for the
building and where required within the area inside or outside of
the Building such as aprons, walkways, garden, etc with
compaction %95 (according to the specification) ,Filling should
be with in layers,each layer should not be more than 25 cmin
thick, according to the instructions of the site engineer with all
necessary works for the final two layers.
m3
400
No.
Item Description
B Concrete Work
Item Description
Unit
Quantit
y
Plain Concrete (Lean Concrete):Provide Materails and cast plain Concrete with thickness to the
required elevations ,the price include laying two layers of thick
nylon. (The nylon should also cover the sides of excavation of
the footings and extend on land for 50cm to both sides of
excavation).
m2
120
m3
50
m3
75
m2
1300
m3
150
C Building Works
Item Description
Unit
Quantit
y
m3
20
m3
50
Marble tiles arround windwos and Doors;Provide marbles with all required materails to installs marbles
arround doors and windows with 25 cm width and 3 cm in thick
according to the drwaings and instruction of the supervisor
engineer,
m.l
50
Cement plastering:
Supply and install THREE COATS smooth finish cement and
sand plaster, including all necessary angle beads, grooves, metal
at hand all accessories, price should include water curing, and
cleaning works, complete as shown on drawings & as per
specifications.
m2
600
Exterior Paint:Provide materails and labors for painting exterior side of the
mosque in three layers with best turkish paint according to the
drwaings and instruction of the supervisor engineer.
m2
750
m2
200
D Finishing Works
Item Description
Unit
Quantit
y
m2
100
VOLLYBALL FLOORING:
sport court
systems ( supply & install ) for this system, it consist of
mapecoat 1,600 w , mapecoat tns white or gray basecoat ,
mapecoat tns color top coat with sand granules weather and
abrasion resistance,
m2
450
m2
100
m2
50
Gypsum plastering:
Supply materials and plastering with gypsum (using best type of
gypsum approved by site engineer) in two layers minimum
10 thickness 15 mm using aluminum straight edges for guides each
80cm and at the corner of walls for walls , corridors , entrance
hall and the area indicated in the drawings
m2
500
Interior Paint:Provide materails and labors for painting Interior side of the
11 rooms in three layers with best turkish paint according to the
drwaings and instruction of the supervisor engineer.
m2
750
Quantit
y
m2
400
m2
100
no.
10
Iron Doors:Supply all material and install Iron Doors turkish Style. interior
the door must be (50)mm thickness hard wood ,with iron frame
15 according to the drwaings and instruction of the supervisor
engineer.
Doors With (2,5*2.2)m size
no.
m2
25
No.
Item Description
False Celings:Supply and install Normal & Water Tight plastic Boards
suspended false ceiling with approved equally(60-60)cm in size,
including concealed galvanized suspension system, supporting,
12 access panels, tapes with batty layer and make openings for
different services, complete as specified. Normal Gypsum
Boards suspended ceiling, generally ( colors to Engineer's
approval).
Plastic Celing
13
Quantit
y
m2
600
no.
L.Sum
No.
Item Description
ROOFING:
Supply material
and install Sandwich panel for roof of the swimming pool. The
work includes all necessaries to fix the panels into purlins (Ushape steel section) connected with steel trusses.prices include
Supply materials and labors for putt on (IZOGAM 8mm
thickness) above slab on two layers of liquid asphalt, the izogam
should be rise 15 cm above the slab.
m2
20
1200
Amount ($)
2,000
2,000
1,500
1,500
200
2,000
Amount ($)
840
150
7,500
200
15,000
10,400
180
27,000
Amount ($)
90
1,800
150
7,500
50
2,500
10
6,000
1,500
25
5,000
Amount ($)
75
7,500
50
22,500
150
15,000
70
3,500
3,000
1,500
Amount ($)
20
8,000
15
1,500
200
2,000
500
2,500
110
2,750
Price ($)
Amount ($)
50
30,000
25
200
1,000
1,000
1,350
27,000
20
24,000
242,690
Item Description
Unit
Quantity
L.Sum
m3
15
Earth Work
Site Preparation,
provide machinery and equipment
for cutting the natural ground, removing
debries, and cleaning site according to
design level, all the works should be
conducted according to drawings and
instructions of supervisor engineer.
Item Description
Unit
Quantity
Filling works:
Supplying materials and filling with
approved screened sub-base materials
(Granular Materail)maximum size is 2in for
the building and where required within the
area inside or outside of the Building such
as aprons, walkways, garden, etc with
compaction %95 (according to the
specification) ,Filling should be with in
layers,each layer should not be more than
25 cmin thick, according to the
instructions of the site engineer with all
necessary works for the final two layers.
m3
30
B
1
Concrete Work
Plain Concrete (Lean Concrete):Provide Materails and cast plain Concrete
with thickness to the required elevations
,the price include laying two layers of thick
nylon. (The nylon should also cover the
sides of excavation of the footings and
extend on land for 50cm to both sides of
excavation).
m2
120
Item Description
Unit
Quantity
m3
43
m2
265
Item Description
Unit
Quantity
m3
150
C
1
Steel works:
Columns, Retain wall and Shear walls:
Provide all materials and cast reinforced
concrete for Columns, Retain wall & Shera
walls with strength (40 mpa at 28 day for
concrete cubies),the price include provide
labors ,instruments ,installing form works
,fixing steel bars and using
vibrator.according to the drawings and
instruction of the supervisor engineer
m3
20
Item Description
Unit
Quantity
PROTECTION FENCE:
Provide all materials and install steel pipe
Columns to be connected by welded wire
mesh for protetion,the price include
provide labors and instruments .according
to the drawings and instruction of the
supervisor engineer
m2
1,020
STEEL WELDED-LADDER:
Provide all materials and install steel
welded ladder is to maintain the
projecters,the price include provide labors
and instruments .according to the drawings
and instruction of the supervisor engineer
m2
Netting:
Provide all materials and cover the top of
playground by high quality net 15x15cm
.according to the drawings and instruction
of the supervisor engineer
m2
1,700
Item Description
Unit
Quantity
Artificial grass
It should lay turf on a 35mm layer of
compacted sharp sand. To maintain levels it
may be necessary to remove an equivalent
amount of the top soil. It is un-wise to
leave vegetable material under new grass
as this will rot down unevenly. The ground
or sand should be compacted. For smaller
areas can do this with the back of a shovel
or builders plank, or for larger areas use a
vibrating plate compactor which can be
hired at most equipment hire
centre.according to the drawings and
instruction of the supervisor engineer
m2
1,700
kgm
13
Amount ($)
1,000
1,000
60
Amount ($)
150
840
Amount ($)
250
10,750
20
5,300
Amount ($)
320
48,000
180
3,600
Amount ($)
14
14,280
100
800
1,700
Amount ($)
20
34,000
50
650
69,700
Quantity
no.
Casting concrete:
Supply material and casting reinforced concrete, ratio of concrete
1:2:4 ,15 cm thickness reinforced with one layer of BRC (6)mm
diameter and (15*15) cm openings. for the entrance, garages &
2
walkways including grading leveling filling in layers of sub-base
well compacted smoothing the surface of concrete with Channel or 4
Manholes for outlet water, expansion joint(using straight steel
shuttering) according to the instruction of site engineer.
m2
3250
I stone:
providing materilas and labors for install Istone(10cm thick)
3
Turkish type using 6cm Sand , according to the drwings and
instruction of the supervisor engineers.
m2
750
Truss Shade:
Supply materials and labors of construction truss shade for covering
the Garage Parking & walkway by sandwich panel, width of
walkway 2 m, the iron pipe 2" ,15 cm from the walkways face, each
3 m C/C, square steel 4x8 cm for frame of sandwich panel, 2 mm
thickness. (Tarahiya ) length 2 m, 4*4 cm, 2 mm thickness, 0.5 cm
C/C, % 4 slope, type of steel structure Turkish made , fixing the
4 main truss structure by the screws 16 mm with walls. Sandwich
panel with 5 cm thickness, Turkish type, rectangular section,
Corner /Angle column (13x13x7x3) cm, Beams (5x6x6x17), fixing
sandwich panel with steel structure by using screws 8 mm, 30 cm
C/C and using foam, silicon on the section of connecting sandwich
panel, painting the frame of steel structure by anti rust & oil paint
two layers, with all requirements of work and according to drawing
and instructions of site engineer
m2
600
No.
Item Description
A External Works
Quantity
m.l
500
m.l
1,000
No.
Filling the Garden:provide labors and wquipments for filling the garden with clean soil
1
25 cm in thick and using speacil sand for grasses with 15 cm ticks
according to the drwaings and instruction of the supervisor engineer.
m2
750
m2
600
unit
200
4 Prociding trees
unit
100
5 Dadonia trees
m.l
300
No.
Item Description
Kerbstone:
Supply material and lay approved precast curbstone and struck piont
5 with cement sand mortar 1:1 for the shoulders according to the
drawing and direction of the Site Engineer.Paint of curbstones are
included.
Guard Rails:
Supply and install iron gurda rails with all necessary required
6 materails, the price include paint the rails with anti-corrosion
according to the drwaings and instruction of the supervisor engineer.
Entrance & Check Point Station:
Supply and install all necessary materials for constructing the
7 entrance room with check points including the security systems and
guard stands according to the drwaings and instruction of the
supervisor engineer.
C Sewarage Systems
Quantity
m.l
80
no.
No.
Item Description
Item Description
Excavate the area for pipe (1 m) wide , (1.5 m) depth and for r
manholes (2.1 m * 2.1 m * 1.7 m high).
Transportation of waste material to a suitable site to be determined
and approved by supervisor Eng. and Camp Manger.
Supply and fill a (10 cm) layer of clean sand for bedding.
THE PIPE TO BE SUPPLIED AND INSTALLED IN THE
EXCAVATED TRENCH WILL CONSIST OF DOUBLE WALL
HDPE CORRUGATED PIPE FOR SEWAGE SYSTEMS WITH
OUTTER DIAMETER (OD) OF 600 MM AND STIFFNESS
3
RATING 8 AND WITH A SLOPE OF 1.5 % .
Supply and fill a 20 cm layer of structural backfill (clean silty sand)
compacted to 90% Standard Proctor, surrounding the layed PIPE.
Then backfill with soils that are FREE OF MATERIALS THAT
COULD POTENTIALLY DAMAGE THE PIPES INTEGRITY.
ALL LARGE OR SHARP STONES MUST BE REMOVED FROM
THE BOTTOM OF THE TRENCH BEFORE PIPE IS INBEDDED.
Backfill SHOULD BE COMPACTED TO A LAYER OF (25 CM)
ABOVE THE SAND CROWN HEIGHT.
Unit
Quantity
m.l
120
no.
Item Description
Unit
Quantity
no.
Item Description
Unit
Quantity
no.
ort Center
Price ($)
Amount ($)
2,000
2,000
15
48,750
12
9,000
35
21,000
ort Center
Price ($)
Amount ($)
20
10,000
25
25,000
10000
10,000
3,000
1,800
600
600
10
3,000
ort Center
Price ($)
Amount ($)
50
4,000
500
3,000
ort Center
Price ($)
Amount ($)
200
24,000
2,000
8,000
ort Center
Price ($)
Amount ($)
600
1,200
ort Center
Price ($)
Amount ($)
3,000
6,000
180,950
SUB-TOTALS
SWIMMING POOL
INTERIOR FOOTBALL HALL
EXTERIOR FOOTBALL PLAYGROUND
EXTERIOR WORKS AND LANDSCAPES
TOTAL AMOUNT FOR CIVIL WORKS
AMOUNTS $
1,181,380
242,690
69,700
180,950
1,674,720