Вы находитесь на странице: 1из 13

J P MUKHERJI & ASSOCIATES PVT LTD

TSFP

BID DATA SHEET (BDS)

Section - III
Page - 1 / 13

BID DOCUMENT FOR


DIESEL POWER GENERATION PLANT
SECTION III

BID DATA SHEET (BDS)


The following bid-specific data for the plant and equipment to be procured shall amend
and/or supplement the provisions in the Instructions to Bidders (ITB). Whenever there is a
conflict, the provisions herein shall prevail over those in the ITB.

INTRODUCTION
ITB 1.1

Name of Project TENDAHO SUGAR FACTORY PROJECT

ITB 1.1

Name of Contract DIESEL POWER GENERATION PLANT

ITB 2.1

Name of Employer:
Tendaho Sugar Factory Project,, P O box 2574, Salfaz building (in
front of Atlas hotel), Cape Verde road, Addis Ababa, Ethiopia

ITB 2.4

The bidder should have a minimum current net worth of US $ 10


million, certified by Chartered accountant.

ITB 3.2

Origin: India covering atleast 85 % of the supply and the balance from
any other country.
THE BIDDING DOCUMENTS

ITB 6.1

For Clarification of bid purposes only, the Employers address is:


Address:

City:
Country:

Tendaho sugar factory project


P O Box 2574
Salfaz building (in front of atlas hotel)
Cape verde road
Addis Ababa
Ethiopia

TEL:

ITB 6.4

+ 251 11 618 2370


+ 251 11 618 3591
Fax:
+ 251 11 618 3583
Email:
tsfp@ethionet.et
gebreasrat@yahoo.com
Contact person:
Ato Gebre Asrat
Factory Manager
Venue, date and time of pre-bid meeting
Venue:

Tendaho Sugar Factory Project

J P MUKHERJI & ASSOCIATES PVT LTD


TSFP

BID DATA SHEET (BDS)

Section - III
Page - 2 / 13

BID DOCUMENT FOR


DIESEL POWER GENERATION PLANT

P O Box 2574
Salfaz Building (In Front Of Atlas Hotel)
Cape Verde Road
Addis Ababa
Ethiopia
Date:

6 weeks after Bid issuing date. It


should take place concurrently with the site
visit, if any

Time:

09:00 h

PREPARATION OF BIDS
ITB 8.1

Language of bid is: English

ITB 9.3 (c) & (e)

Qualification requirements for bidders, including members of


joint ventures, subcontractors or vendors
Even though the bidders are pre-qualified / invited, it is requested that
the bidder submits the following updated information that it has a
documented experience of minimum ten (10) years in supplying and
installing such facilities and implementing facilities namely Diesel
Generator sets of capacity not less than 625 kVA. The Bidder as an
individual bidder or as a member of Joint Venture must have
executed a minimum of 2 such projects in the past 10 years. The
Bidder must submit along with its bid the following particulars.
1. Individual Bidders or Individual Members of Joint Ventures
1.1

Constitution or legal status of Bidder: [Bidder to attach copy]


Place of registration: [Bidder to insert]
Principal place of business: [Bidder to insert]
Power of attorney of signatory of Bid: [Bidder to attach]

1.2

Total annual volume of construction work performed in the last


five years, in US Dollars : [insert]
2005
2004
2003
2002
2001

1.3

Work performed as prime Contractor on works of a similar

J P MUKHERJI & ASSOCIATES PVT LTD


TSFP

BID DATA SHEET (BDS)

Section - III
Page - 3 / 13

BID DOCUMENT FOR


DIESEL POWER GENERATION PLANT

nature and volume over the last five (5) years giving the
following details for each contract. Also list details of work
under way or committed, including expected completion date.
a)
b)
c)
d)
e)
1.4
1.5

Project name and country


Name of client, address and contact person
Size and key specifications of juice extraction plant
supplied on turnkey basis;
Type of work performed and year of completion
Date and value of contract (in US Dollars)

Details of manufacturing/production facilities for manufacturing


of Diesel Generator sets.
Major items of Contractors Equipment [ erection and related
Services] proposed for installation and commissioning of the
Facilities. List all information requested in the following
Format
a)
b)
c)
d)

Item of equipment
Description, make, and age (years)
Condition (new, good, poor) and number available
Owned, leased (from whom?), or to be purchased (from
whom?)

1.6

Qualifications and experience of key personnel proposed for


Administration and execution of the Contract. Insert details in
the following format and attach biographical data for key
personnel.
a)
Position
b)
Name
c)
Qualifications
d)
Type of experience in similar functions
e)
Years of experience (general)
f)
Years of experience in proposed position

1.7

Proposed subcontracts and firms involved.


a)
b)
c)
d)
e)

Section / component of Facilities


Value of Subcontract
Subcontractor name, address and contact person.
Type of experience in similar work (incl. Details and
value of work done in last five years as per 1.3 above)
Years of experience (general)

1.8

Audited accounts for the last three years; bank references; etc.
[Furnish details below and attach copies.]

1.9

Evidence of access to financial resources to meet the

J P MUKHERJI & ASSOCIATES PVT LTD


TSFP

BID DATA SHEET (BDS)

Section - III
Page - 4 / 13

BID DOCUMENT FOR


DIESEL POWER GENERATION PLANT

qualification requirements: cash in hand, lines of credit, etc.


[Furnish details below and attach copies of supporting
documents.]
1.10 Name, address, and telephone, telex, and facsimile numbers of
banks that may provide references if contacted by the Employer.
[Furnish details below.]
1.11 Information on current litigation in which the Bidder is involved.
[Furnish details in the following format if applicable]
a)
b)
c)

Name and address of other parties


Cause of dispute
Amount involved in US Dollars

1.12 Statement of compliance with requirements of Clauses 2. of the


Instructions to Bidders.
1.13 Proposed Program (work method and schedule). Descriptions,
and charts, as necessary, to comply with the requirements of the
Bidding Documents. [attach]
2.0

Joint Ventures

2.1

The information listed in 1.1 - 1.12 above shall be provided for


each partner of the joint venture.

2.2

The information in 1.13 above shall be provided for the joint


venture.

2.3

Attach the power of attorney of the signatory(ies) of the Bid


authorizing signature of the Bid on behalf of the joint venture.

2.4

Attach the Agreement among all partners of the joint venture


(and which is legally binding on all partners), which shows that
(a)

all partners shall be jointly and severally liable for the


execution of the Contract in accordance with the Contract
terms;

(b)

one of the partners will be nominated as being in charge,


authorized to incur liabilities, and receive instructions for
and on behalf of any and all partners of the joint venture;
and

(c)

the execution of the entire Contract, including payment,


shall be done exclusively with the partner in charge.

3.0

Additional Requirements

3.1

Bidders should provide any additional information required

J P MUKHERJI & ASSOCIATES PVT LTD


TSFP

BID DATA SHEET (BDS)

Section - III
Page - 5 / 13

BID DOCUMENT FOR


DIESEL POWER GENERATION PLANT

in the Bidding Data or the Bid Documents.

ITB 9.3 (d) (ii)

The period is: Two years


Spares required for operation; number of years following completion:
20 years

ITB 9.3 (g)

No alternative bids will be accepted


BID PRICE AND CURRENCY

ITB 11.3

Separate numbered Schedules shall be used for each of the following


elements. The total amount from each Schedule (1 to 6) shall be
summarized in a Grand Summary (Schedule 7) giving the total bid
price(s) to be entered in the Bid Form.
Schedule No. 1

Plant and Equipment (including Mandatory


Spare Parts) Supplied from Abroad

Schedule No. 2

Plant and Equipment (including Mandatory


Spare Parts) Supplied from within the
Employers Country

Schedule No.3

Insurance for Ocean and Local Transportation

Schedule No. 4

Ocean Transportation

Schedule No. 5

Local Transportation

Schedule No. 6

Installation and other Incidental Services


[excluding civil works, civil foundations, but
including foundation grouting}

Schedule No. 7

Grand Summary (Schedule Nos. 1 to 6)

Schedule No. 8

Recommended Spare Parts

Bidders shall note that the plant and equipment included in Schedule
Nos. 1 and 2 above exclude materials used for civil, building and
other construction works. All materials required for installation and
other purposes shall be included and priced under Schedule No. 6,
Installation Services.
ITB 11.4 (a)

i)

Plant and equipment to be supplied from abroad shall be quoted


on basis of DDU Tendaho Sugar Project site. Employer
assumes import custom clearances and payment of custom
duties and taxes.

J P MUKHERJI & ASSOCIATES PVT LTD


TSFP

BID DATA SHEET (BDS)

Section - III
Page - 6 / 13

BID DOCUMENT FOR


DIESEL POWER GENERATION PLANT

ITB 11.4 (b)

ii)

In addition, bidders shall indicate EX works price, FOB port of


dispatch price also.

iii)

Named place of destination for above Incoterm delivery is


Tendaho Sugar Project site, which is adjacent to the AddisDjibouti tarmac highway with a convenient distance from port of
Djibuti.

i)

Prices shall be quoted DDU Tendaho Sugar Project

ii)

In addition, bidders shall indicate EXW price also.

iii)

Named place of destination for DDU is Tendaho Sugar Project


Site.

ITB 11.6

The price shall be fixed.

ITB 12.1 (b)

This should be quoted in Local Currency Only.

ITB 12.1 (c)

The choice of currencies in ITB Sub-Clause 12.1 (c) shall be as


under.
-

Insurance will be in Local Currency only as the goods / cargo


has to be Insured by Ethiopian Insurance Corporation Only.

Ocean fright will be in local Currency or in Foreign Currency


depending upon whether the cargo is being shipped through
an Ethiopian Shipping line or any other shipping line.
Shipment through Ethiopian Shipping line is a must if the
shipping line plies to the Port of Shipment.

Local Transportation will be in Local Currency only.

Installation Services could be either in Foreign Currency or in


Local Currency depending upon the type of currency in which
the Expenditure is likely to occur.

BID PREPARATION AND SUBMISSION


ITB 13.1

Bid shall include a Bid Security (issued by bank or surety) included in


Section VII Bidding Forms;
Amount of bid security US $ 20,000 or equivalent in freely
convertible foreign Currency.

ITB 13.2

Bid Security shall be in the form of Bank Guarantee from a reputable


banking institution.

ITB 14.1

Bid validity period 120 days from the date of bid opening.

J P MUKHERJI & ASSOCIATES PVT LTD


TSFP

BID DATA SHEET (BDS)

Section - III
Page - 7 / 13

BID DOCUMENT FOR


DIESEL POWER GENERATION PLANT

ITB 15.1 & 19.2

The number of copies of the Bid to be completed and returned shall


be ONE original plus FOUR copies plus ONE electronic copy on a
Data Compact Disk (CD) in Microsoft Word format for text and
Microsoft Excel format for quantitative information. (Only Technical
and commercial bid excluding price bid shall be included on CD)
In case of any discrepancies between the submissions, the original
bid shall be considered to be correct.

ITB 16.1

Bidders shall not have the option of submitting their bids only
electronically but with hard copies as indicated under BDS 15.1.

ITB 17.1

For bid submission purposes, the Employers address is:


Address:

Tendaho Sugar Factory Project


P O Box 2574
Salfaz Building (In Front Of Atlas Hotel)
Cape Verde Road

City:
Country:

Addis Ababa
Ethiopia

TEL:

+ 251 11 618 2370


+ 251 11 618 3591

Fax:

+ 251 11 618 3583

Email:

tsfp@ethionet.et
gebreasrat@yahoo.com

Contact person:

Ato Gebre Asrat


Factory Manager

The deadline for the submission of bids is:


Date: 8th March, 2007
Time: 1200 hour
ITB 20.1

Location, time and date of bid opening


Same address as given above under Clause ITB 17.1
Bid opening date & time
Date: 8th March, 2007
Time: 1300 hour

J P MUKHERJI & ASSOCIATES PVT LTD


TSFP

BID DATA SHEET (BDS)

Section - III
Page - 8 / 13

BID DOCUMENT FOR


DIESEL POWER GENERATION PLANT

BID EVALUATION
ITB 22.5

Bid Responsiveness
Responsiveness are those important points which conform to the
major conditions set out in the Bid, without which, the Bid is
considered as non-responsive and will not be considered for further
evaluation. Following six points are considered under this category.
Table-1 below is to be filled for marking Yes I No against each
points for each Bidder.
Table- 1
Sl. No.
1
2
3
4
5
6

Description

Bidder # 1

Bid form
Bid security and its validity
Bid validity
Scope of work including amendments
Technical data
Price schedule

Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No

All Bids should pass the Responsiveness before advancing to


Technical & Financial evaluation.
ITB 23.2

ITB 24.1

Currency chosen for the purpose of converting to a common


currency: Ethiopian Birr
Source of exchange rate:

Commercial bank of Ethiopia,


Addis Ababa.

Date of exchange rate:

28 calendar days prior to original


deadline for the receipt of bids as
specified in BDS 17.1

The Employer will adopt marking system for technical evaluation. A


total of 100 marks have been kept for technical and Financial /
Commercial Evaluation. Merit points shall be allotted for Technical
and Financial evaluation as given below:
i)
ii)

Technical Evaluation (ST)


Financial Evaluation (SF)

Total (ST + SF)

80
20
----100

J P MUKHERJI & ASSOCIATES PVT LTD


TSFP

BID DATA SHEET (BDS)

Section - III
Page - 9 / 13

BID DOCUMENT FOR


DIESEL POWER GENERATION PLANT

Technical Evaluation
The technical evaluation shall be carried out in the following four
major categories:
1) Technical specification which covers Technical specification,
Technical Schedule, Drawings and flow diagrams, Scope of work,
Terminal points of supply, Performance Parameters, Erection and
Commissioning, etc.
2) Project Time Schedule
3) Training
4) Bidders Company Structure & Profile which includes Company
reputation, Financial position, Shop facility and set up, Key
personnel CV, Experience in similar jobs, Document presentation,
Resource Level, Quality plan, Confidence in method statement,
understanding the requirement, etc.
Following merit point system shall be followed for Technical
Evaluation. Upon completion of evaluation, the marks will be
corrected to level of 80 from 200.

Sl.No

Description

1.
1.1
1.2
1.3
1.4
1.5

Technical Specification
Technical Schedule
Drawings / Flow Diagrams
Terminal points of supply
Performance parameters
Erection & Commissioning

2.
3.
4.
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10

Project Time Schedule


Training
Bidders Qualification
Organizational Strength
Resource / Finance position
Shop facility / setup
Reputation
Experience in similar jobs
Understanding requirement
Document Presentation
Back up services
Experience in Ethiopia
Response to calls

Max.
Marks

Sub Total

20
25
25
10
15
25
100
10
10
5
10
5
10
15
5
5
10
10
5

J P MUKHERJI & ASSOCIATES PVT LTD


TSFP

BID DATA SHEET (BDS)

Section - III
Page - 10 / 13

BID DOCUMENT FOR


DIESEL POWER GENERATION PLANT

Sub Total
Total Score (1+2+3+4)
Technical evaluated score corrected to 80

80
200
80

Bidders who have scored marks of 80 % and above is the technical


evaluation are only qualified for the commercial evaluation.
ITB 25.1

The comparison shall be DDU named place of destination price for


all.

ITB 25.2

Marking system will be adapted for Financial / Commercial


Evaluation. Following points shall be considered for financial
evaluation.
1.0

Evaluated Price

A)

Corrected Bid Price

Prices received from various bidders shall be brought to common


accepted figures for comparison.
i)

The prices shall be converted to a single common currency for


evaluation purpose.

ii)

For those figures, which were not filled by the bidders, the
corresponding maximum value of other bidder shall be filled for
evaluation purpose.

iii)

For sea freight, insurance and clearance, corresponding


percentage values shall be applied, if not filled by the Bidder.

Based on above, the bid price shall be calculated to a corrected Bid


Price for all bidders, for evaluation purpose.
B)

Cost due to deviation in Terms of Payment

Deviation in Terms of Payment will be compensated at an interest


rate of 10 % per annum.
C)

Cost due to deviation in Time Schedule

Deviation in Time Schedule will be compensated with 2 % of quoted


price for every month, if the time schedule is extended beyond the
stipulated months of trial completion. If the time schedule exceeds 2
months above the stipulated months, the Bid will be considered as
Non-Responsive.

J P MUKHERJI & ASSOCIATES PVT LTD


TSFP

BID DATA SHEET (BDS)

Section - III
Page - 11 / 13

BID DOCUMENT FOR


DIESEL POWER GENERATION PLANT

D)

Cost due to deviation in Performance

Deviation in performance will be compensated by an adjustment of


0.5 % of bid price for each unit drop in the performance below the
norm of 100.
The evaluated price shall be calculated as follows:
a)
b)
c)
d)

Corrected Bid price


Cost due to deviation in payment schedule
Cost due to deviation in time schedule
Cost due to drop in efficiency figures

=
=
=
=

xxxxx
xxxxx
xxxxx
xxxxx
-------xxxxx
--------

Total Evaluated price


2.0

Financial Evaluated Score

Based on the above considerations, the financial evaluation shall be


carried out for all bidders. The evaluated score shall be calculated as
per the following formula based on maximum score of 35 for financial
evaluation.
Evaluated Score
Where,

P
Pmin
Pmax

=
-

20 x [1 (P Pmin)/Pmax]

Evaluated price of Bidder


Evaluated Minimum price
Evaluated Maximum price

The evaluated price and the evaluated scores of individual bidder


shall be tabulated as per the following table.
Particulars

Max. Marks

Bidder #

Evaluated Price
Financial Evaluated score
3.0

20.00

xx . xx

Total Evaluated Score

Particulars

Max. Marks

Bidder #

Technical Evaluated Score


Financial Evaluated Score

80
20

xx . xx
xx . xx

Financial Evaluated score

100

xx . xx

J P MUKHERJI & ASSOCIATES PVT LTD


TSFP

BID DATA SHEET (BDS)

Section - III
Page - 12 / 13

BID DOCUMENT FOR


DIESEL POWER GENERATION PLANT

4.0

Winning Bidders

The first 2 or 3 Bidders scored highest in Total Evaluated Score shall


be considered as Winning Bidders and called for negotiation subject
to the said bidder subsequently determined as a qualified bidder
as detailed in ITB 28.
5.0

Award of Contract

The 1st successful and qualified bidder shall be invited for AWARD
OF CONTRACT.
ITB 25.3 (b)

Time schedule:
Time to complete the facilities from the effective date specified in
Article 3 of the Contract Agreement for determining time for
completion of pre-commissioning activities shall be as under.
(a)

For first Diesel Generator Set of 625 kVA Minimum 48


weeks and maximum 49 weeks. For the purposes of bid
evaluation Time to complete the facilities will be considered
as 48 weeks.

(b)

For second Diesel Generator Set of 1250 kVA Minimum 52


weeks and maximum 53 weeks. For the purposes of bid
evaluation Time to complete the facilities will be considered
as 52 weeks.

(c)

For Third Diesel Generator Set of 1250 kVA Minimum 56


weeks and maximum 57 weeks. For the purposes of bid
evaluation Time to complete the facilities will be considered
as 56 weeks.

The adjustment rate in the event of completion beyond the minimum


period shall be 0.2 % for each week of delay from that minimum
period.
In case of earlier delivery, a credit of 0.2% per week will be given
counting from minimum period.
ITB 25.3 (c)

Operating and maintenance costs factors for calculation of the life


cycle
i)

number of years for life cycle [Bidder to indicate in his bid]

ii)

operating costs [Bidder to indicate inputs for a period of life cycle]

iii)

maintenance costs, including the cost of spare parts for the initial
period of operation, [to be specified by the Bidder for the life
cycle]

J P MUKHERJI & ASSOCIATES PVT LTD


TSFP

BID DATA SHEET (BDS)

Section - III
Page - 13 / 13

BID DOCUMENT FOR


DIESEL POWER GENERATION PLANT

iv)

ITB 25.3 (d)(i)


Functional
Guarantees

rate, in percent, to be used to discount to present value, all


annual future costs calculated under (ii) and (iii) above for the
period specified in (i)

Following are the desired performance for each of the Diesel


Generating Sets.
Output of first Diesel Generating Set 625kVA
Output of second Diesel Generating Set 1250kVA
Output of third Diesel Generating Set 1250kVA

ITB 25.3 (d) (ii)


Adjustment factor
used in bid
evaluation

The following adjustment factors will be used for each of the sets.
a) Addition of US Dollars 10,000 for each one percent [1%]
reduction in throughput or prorated for less than one percent
[ 1% ] of capacity indicated above
Addition of US$ 10,000 / for each one percent [1%] excess fuel
consumption when compared to the bid with lowest fuel
consumption.

ITB 25.3 (f)

Nil
CONTRACT AWARD

ITB 33

Amount of performance security - Ten percent (10%) of the contract


price.

Вам также может понравиться