Bonded Tendons
Moment-Curvature Analysis
Assumptions
Tendons are bonded to concrete: changes
in strain in the steel & concrete after
bonding are assumed to be the same
Initial strain due to effective prestress in the
tendons (No moment from applied loads):
1.
2.
b
c
x
dP
AP
ce
se
ce
se
s
(a) Strain Distribution
at Zero Moment
Assumptions (Contd)
3.
4.
5.
6.
7.
c = f ck
c2
c 2 = 2% for
c2
f ck < 50MPa
c2
f ck 50MPa
x 2 1
3
c 2
8 c2 3 x
x = x
12 c 2 4 x
fse
T = AP f se
se
Analysis Procedure
Two Stages
Example 1
Normal weight concrete fck = 48MPa, 915 x 458 mm
AP = 1777 mm2, fp0,1k = 1580 MPa, Initial prestressing stress = 1296 MPa,
Ep = 190 GPa, Prestressing losses 15%
Find M, for the following steps:
(a) Initial stage zero applied moment
(b) Zero strain in concrete at level of steel
(c) Cracking moment
(d) Cracked section with top fiber strain 0.001, 0.002 and 0.0035
458
800
AP
(a)
Ic =
0.458 0.9153
= 0.0292m 4
12
0.915
= 0.343m
2
bot =
= 15.2 MPa
0.42
0.0292
top =
Ec = 22(48)
10
top =
0 =
x=
0.3
= 35.2GPa
5 .9
= 0.000168
35200
bot
top )
h
bot =
15.2
= 0.000432
35200
1
m
0.000168 0.915
= 0 .256
0.000168 ( 0 .000432 )
ce =
ce =
12.5
= 0.000355
35200
se =
0.85 1296
= 0.00564
195000
(b)
M1 =
bot1 =
top1 =
top1 =
1 =
x1 =
(c)
+
= 0.62MPa
0.42
0.0292
0.0292
= 10.5MPa
0.42
0.0292
0.0292
10.5
= 0.000298
35200
bot 1
top1 )
h
bot1 =
0.62
= 0.0000176
35200
1
m
0.000298 0.915
= 0.864
0.000298 (0.0000176 )
Cracking moment
Approximate method
h
915
f ctm, fl = max 1.6
f ctm ; f ctm = max 1.6
4;4 = 4MPa
1000
1000
M =
( f ctm , fl cb1 ) I c
yb
f p =
M (d p yt ) n
Ic
n=
E P 195
=
= 5.54
Ec 35.2
f s 2 = f s1 + f p = 1168.8 + 14 = 1182.8MPa
P = 0.001777 1182800 = 2101.8kN
bot 2 =
top 2 =
top 2 =
2 =
x2 =
+
= 3.8MPa
0.42
0.0292
0.0292
= 13.8MPa
0.42
0.0292
0.0292
13.8
= 0.000392
35200
bot 1
top1 )
h
bot 2 =
3 .8
= 0.000108
35200
1
m
0.000392 0.915
= 0.717
0.000392 (0.000108 )
(c)
Cracked Section
Resultant internal compression force for a rectangular section:
Cc = b f ck
c
x 1 c
c2
3 c2
8 c2 3 c
x = x
12 c 2 4 c
M c = Cc x + d P x
f P = P EP
f P = f P 0,1k
P
+ ( f Pk f P 0,1k )
uk
T = AP f P
(c)
f P 0.1k
EP
f P 0.1k
EP
P = ( se + ce ) + (d P x )
c
x
c
x
Cracked Section
Assume strain in concrete at the top c = 0.001
0.001
0.001
0.287 1
= 2629kN
0.002
3 0.002
0.001
= 0.00779
0.287
0.001
1
= 0.00348
0.287
m
(c)
Cracked Section
Assume strain in concrete at the top c = 0.002
0.002
0.002
0.2 1
= 2933kN
0.002
3
0.002
0.002
= 0.012
0.2
Close enough
8 0.002 3 0.002
x = 0.2
= 0.125m
12 0.002 4 0.002
0.002
1
= 0.01
0.2
m
Cracked Section
Assume strain in concrete at the top c = 0.0035
0.0035
0.0035
0.192 1
= 3078kN
0.002
3 0.002
0.0035
= 0.0171
0.192
(0.0171 0.00832) = 1738.1MPa
f P = 1580 + (1830 1580)
(0.0222 0.00832)
T = 0.001777 1738100 = 3088kN
Close enough
10
8 0.002 3 0.0035
x = 0.192
= 0.173m
12 0.002 4 0.0035
0.0035
1
= 0.0182
0.192
m
2800
Moment (kN-m)
2100
1400
700
0
-0.003
0.003
0.006
0.009
0.012
0.015
0.018
0.021
Curvature (1/m)
11