BAHANA KARYA MANDIRI


DATA SHEET
SCRUBBER
Tag No. :

Type: VERTICAL

Service : SCRUBBER
Size

:36"

No. of unit: 2 (Two)

OD X 10'-0"

TL/TL

Application Specification

Location: SP.V & SP.XI

: ASME Sect. VIII Div.1 2007 Edition, ASME Sec IX, ASME Sec. V, OK-GS-500, 510, OK-GS-300
DESIGN DATA

Operating Temp.

120

Design Temp.

150

Design Press.

150

Design Capacity

D
Press.

120

psig Nozzle

NPS

Qty

Servi

N1

8"

psig

N2

8"

Gas Ou

N3

2"

Condensate

Drain Ou

10 MMSCFD

Inlet

Shell

3.175

N4
mm N5

2"

Corrosion Allowance

3"

PSV

Corrosion Allowance

Head

3.175

mm N6

2"

TI/TW

Spar

Registration

Yes

N7A/B

2"

Code Stamp

No

N8

2"

PI

Post Weld Heat Treatment

No

N9A/B

2"

LG

2"

Vent

18"

man H

Max. Allowable Working Press.

272.50

Ambient Temp. (Operating)

psig N10

70~120

-20

Min. Design Metal Temp.

F MH
F

MATERIALS
Shell

SA 516-70

Head

SA 516-70

Skirt

SA - 283 C

Demister Mesh

304 SS

Bolts

SA 194 2H/ SA 193-B7 (external)304SS(internal)

Flanges

A 105

Nozzle Necks

A 106 B

Attachment

External

Attachment

Internal

Gaskets

SA 516-70
SA 516-70
CS Spiral Wound Gasket (out/in rings) 1/8" thk

DIMENSIONAL/ SHIPPING DATA


Vessel Size

36"

Shell Thickness

PAINTING
TL/TL

External Surface Preparation

9.57

Head Thickness (min. thk. AF)


Joint Efficiency

OD X 10'-0"

10.3

mm

Internal Surface Preparation

mm

Structural Surface Preparation

Shell

1.0

1.0

Vessel Coating (Ext./In.)

Head

1.0

1.0

Vessel External Finish

Capacity

10 MMSCFD

Weight

Empty

Weight

Tray

Weight

Operating

Weight

Hydrotest

8,095

Structural Prime Coat/Int. Coat

3314

lb

3314

lb

Vessel Internal Prime

3,314

lb

Vessel Internal Finish

lb

Structural Finish

Q/A Shipping Dimension

Ext. Insulation

Shell

FOB Point

Ext. Insulation

Heads

Nozzle Covers/ Connection Plugs

Yes

Ext. Cladding

Shipping Cradles

N/A

Insulation

Bottom Head

Ocean Transport Protection

N/A

Insulation

Saddle

Fire proofing

Saddle

ACCESSORIES BY FABRICATOR

QUALITY CONTROL

Manway/ Davit

Yes

Hydrotest Pressure

Ladder and Clips

No

Hydrotest Medium

Pipe Supports

No

Hydrotest Duration (hrs)

Insulation Supports

No

Radiographic Inspection

Insulation Supports Bottom Head

No

Ultrasonic Inspection

Fire proofing Supports

No

Magnetic Particle Inspection

Ladder

No

Dye Penetrant Inspection

Flatform

No

Material Mill Test Reports

Lifting Lugs

Yes

Post Weld Heat Treatment & Records

Earth Lugs

Yes

Hydrotest Report

Pipe Coil

N/A

Radiographic Inspection Reports

Skirt/ Legs/ Saddles

Skirt

(UG 99b)

Ultrasonic Inspection Reports

Syphon Drain

Yes

Magnetic Particle Inspection Reports

Vortex Breaker

Yes

Dye Penetrant Inspection Reports

Mist Eliminator

Yes

Fabrication Quality Control Manual

Tray/ Packing Supports

N/A

Shop Inspection by Owner


Welding Procedure Review/ Approval

PT. BAHANA KARYA MANDIRI


DATA SHEET
SCRUBBER
Tag No. : -

Type: VERTICAL

Service : SCRUBBER
Size

:36"

OD X 10'-0"

No. of unit: 2 (Two)


T.L/T.L

Location: SP.V & SP.XI

NOTES :

NA KARYA MANDIRI

DATA SHEET
SCRUBBER
Doc. No.: Rev. No.: Page:

1 of

E Sec IX, ASME Sec. V, OK-GS-500, 510, OK-GS-300


Drain
Service

Rating

Facing

Inlet

150#

WNRF

Gas Outlet

150#

WNRF

Condensate Outlet

150#

WNRF

Drain Outlet

150#

WNRF

PSV

150#

WNRF

TI/TW

150#

WNRF

Spare

150#

WNRF

PI

150#

WNRF

LG

150#

WNRF

Vent

150#

WNRF

man Hole

150#

WNRF

Remark

PAINTING & INSULATION


Yes
No
Structural Surface Preparation

Yes
Inorganic Zinc / Modif. Silicon

Structural Prime Coat/Int. Coat

Zinc Chromate Epoxy/


No
No
Highbuild Catalyzed Epoxy
No
No
No

Bottom Head

No
No
Yes

QUALITY CONTROL/ INSPECTION/ TESTING


(UG 99b)

354.25

psig.
Water

as per Code
as per Code
as per Code
as per Code
as per Code
Required
Post Weld Heat Treatment & Records

Yes
Required

Radiographic Inspection Reports


Ultrasonic Inspection Reports
Magnetic Particle Inspection Reports

Required
Required if UT carried out
Required if MPI carried out

Dye Penetrant Inspection Reports

Required, inhouse

Fabrication Quality Control Manual

Required
Required

Welding Procedure Review/ Approval

Required

ANA KARYA MANDIRI

DATA SHEET
SCRUBBER
Doc. No.: Rev. No.: Page:

2 of

Вам также может понравиться