Form\Meeting
Explanation
Prep Sheet:
Pre-Leaders Mtg
All other listed forms All other forms are to be used as indicated in the training manual.
Post Leaders Mtg
This meeting is for the Continuous Improvement Manager and the Leaders
to determine what items will be tracked for cost reasons and input into
Form\Meeting
Explanation
5 days prior
Prep Sheet:
3 days prior
1 day prior
Pre-Leaders Mtg
During Event
All other listed forms All other forms are to be used as indicated in the training manual.
This meeting is for the Continuous Improvement Manager and the Leaders
to determine what items will be tracked for cost reasons and input into
the ZBT database.
Form\Meeting
Explanation
5 days prior
Prep Sheet:
3 days prior
1 day prior
Pre-Leaders Mtg
During Event
All other listed forms All other forms are to be used as indicated in the training manual.
This meeting is for the Continuous Improvement Manager and the Leaders
to determine what items will be tracked for cost reasons and input into
the ZBT database.
Form\Meeting
Explanation
5 days prior
Prep Sheet:
3 days prior
1 day prior
Pre-Leaders Mtg
During Event
All other listed forms All other forms are to be used as indicated in the training manual.
This meeting is for the Continuous Improvement Manager and the Leaders
to determine what items will be tracked for cost reasons and input into
the ZBT database.
Form\Meeting
Explanation
5 days prior
Prep Sheet:
3 days prior
1 day prior
Pre-Leaders Mtg
During Event
All other listed forms All other forms are to be used as indicated in the training manual.
This meeting is for the Continuous Improvement Manager and the Leaders
to determine what items will be tracked for cost reasons and input into
the ZBT database.
KAIZEN PREP-SHEET
Scope:
Line/area requested
Date(s)/shift
Requested by
Kaizen Coordinator
Goals:
Current situation & broad goals and objectives:
Team Membership:
(FF Mgr)
(ME)
(QE)
(TL's)
(Maint)
(Mat'l Handler)
Support:
(Op's Mgr)
Data: Data needed & people responsible for obtaining that information prior to the event
Line layout w/mat'l flow
Efficiency reports
Scrap reports/pareto
Production Schedule
Safety incidents
Operator Instructions
Pre-meetings:
Goal meeting to review Prep Sheet and prepare Target Sheet
Conduct a line review
Pre-Leaders Meeting
Pre-meeting with production teams(15min) 1st
2nd
3rd
Target Sheet
Date:
Area:
Takt Time:
Kaizen Event
Current
Space (sqft)
Inventory(Raw\F.G.)
Walk distance (ft)
Parts Traffic dist (ft)
Cycle Time (sec)
Through-put
Team Size
1st
2nd
3rd
Productivity
Changeover (min)
5s(Poor/good/work class)
Standard Work
Pull One(Std WIP)
Scrap
Remarks:
Target
1st Day
Follow-up Audit
%
Change
#1
#2
30 Days
Date:______.
Date:______
Date:______
%
Change
Day 3 "Standardize"
7:00 Standard Work Training
8:00 Tweak line changes
9:30 Implement Work Standardization & Update ODS
11:00
12:00
12:30
TBD
Presentation Preparation
Lunch
Dry Run Presentation
Plant Presentation
Leaders Meeting
Purpose:
1 Report on Kaizen activities at the plant.
2 Get further instructions on Target Sheet.
People:
1 Leader and Sub-Leader must be present from each Kaizen event
2 Facilitator\Sensai present
3 All attending are required to stay for the entire meeting
Format:
1 Each team will be given 10 minutes to present current status
2 Presentation are to be done by overhead projector
Contents:
Day 1:
Presentation Format
Purpose:
1 To develop a consistency in reporting improvements
People:
1 All participants will be present in the presentation
2 Team Leader to introduce team
Format:
1 Each team will be given 10 minutes to present
2 Presentation are to be done by overhead projector
3 Video to be played during presentation(if available)
Contents: Presentation contents and order
1 Team Leader introduces and explains the reason for the event.
'-Review the Target Sheet and Explain goals of the Event
6 Show the Cycle Time Bar chart BEFORE and AFTER the event.
7 Show Target sheet to indicate the percent improvements made
during the event.
8 Show Newspaper to display the three items left open for the area
to address within 30 days.
Kaizen Newspaper:________________________
# Wastes Found
# Wastes Eliminated
No.
Problem\Waste
Wastes:
Overproduction
Waiting Time
Transportation
Overprocessing
Inventory
Motion
Correction
Corrective Action
Who
By When
Process Name:
Date:
Model Name:
Scope of Operation
From:
Quality Check
To:
Safety Precaution
Standard WIP
Takt Time
Net Time
Process for
Observation:
Date:
Operator:
Compentent Task
No. From:
To:
10
Task time
Points of observed
Standard Work
Combination Sheet
Process for
Observation
Date:
Shift Goal:
Manual
FF:
Takt Time:
Automatic
Walk
Time
No. Operation Name
Totals
Dist
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
46
48
50
52
54
56
58
60
Kaizen Changes
Problem\Waste
Before
Before Kaizen
Kaizen
Measures Taken
Results
After Kaizen