Вы находитесь на странице: 1из 1

Temperature

Date of report

Min.

COAL CONS

3-Nov

MAX.

On Date

R.H.
Rain fall

Month to Date
Cement silos

24

414

PET COKE

425

QTY

Cumm. R. Fall
S.No.

Power Geration

Equipments

On Date

R/ Hrs
Month to Date

Production
On Date
Month to Date

LIME STONE RECIPTS


RECIPTS
NO.OF TRIPP

Power Unit

Quarry

Mechenical

Crusher

FACTOR

VRM - 1

24

195

Sakhoda

VRM - 2

KOTHPTLI

16

E - Mill

P.LG.

312

13.5

COAL MILL NO1

P.CR.CH.

347.88

15

COAL MILL NO2

P.CH.

244.6

24

Kiln
CEMENT MILLS
On Date actual On Date

341.43

S.No.

P.HG.
R/ Hrs
CONC+

Production
c+

PPC

CUMM.
TOTAL

Total

53 Grade

Power Unit

1
2
3

54

54

54

54

520

2650

5
6

15

2130

TOTAL

628
CEMENT DESPATCH
PPC

CONCRETE+
2539.9

2758
POWER IN CEMENT DESPATCH

ACL

TOTAL

92.9

PPC

CONCRETE+

ACL

TOTAL

Rail

2632.8

Roal

CONSUMPTION (MT)
OWN
CRUSHER

P.High Grade
1940

P.Chem. Grade P.Low Grade

150

Raw Mill

435

MARBLE SLURRY R.OCURE

CR.CH.

LATERITE

SLUDGE

420

2945

2945

177

3122

Raw Meal

Coal - A/B Grade Coal - D Grade WASH Coal

IMPORTED

PET COKE

Ind.Waste

Bio Mass

P.COKE ASH

Clinker

Gypsum

ACC-1919

ACC - 2051

ACC - 1635

LSTONE

TOTAL

Kiln
Cement
PPC
CONCRETE+

Dry Fly Ash

Own CPP Fly Ash

1278

170

682

2130

448

50

130

628

53 GR.
43 GR.
RAW MATERIAL RECIPTS
COAL

IMPORTED

A&B Grade

D&E Grade

F Grade

WASH Coal

PET COKE

Bio Mass

TRIP

Ind.Waste

P.COKE ASH

CB

QTY

11.44

% MOIST.
DRY QTY.
GYP.

IMP. GYPSUM

TRIP
QTY
% MOIST.

DRY FLYASH

CPP BED ASH

WET FLYASH

Red Occure Additive

19

367.76

76.1

140.8

121

DRY QTY.
REMARKS
Rawmeal %

OWN FLY ASH

76

2758

Вам также может понравиться