METRADO DE ESTRUCTURAS

VIVIENDA FAMILIAR

OBRA :
PROPIETARIO:

Hecho por:

20/09/2016

Revisado:

FECHA:

N de Partida

Plano:

VILMA INOCENCIA USTUA FERNANDEZ

Descripcin

01

ESTRUCTURA

01.00.00
01.02.1

TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL

01.02.2

TRAZO DURANTE LA EJECUCION DE LA OBRA

02.00.00

ECAVACION

02.02.1

EXCAVACION PARA CIMIENTOS - ZAPATAS


Zapatas
Z-1

N de
Elem.

N de
Cant.

Largo

Medidas
Ancho Altura

Parcial

100.00

Z-2
Z-3

2.50

2.00

2.20

11.00

1
1

8
1

2.00
2.50

1.80
1.50

2.20
2.20

63.36
8.25

1
1

6.53
5.82

0.50
0.50

1.40
1.40

4.57

1
1

5.82
1.54

0.50
0.50

1.40
1.40

1
1

1.54
1.54

0.50
0.50

1.40
1.40

3.30

0.50

0.50

2.00

0.40

0.50

2.50

2.00

1.30

8
1

2.00
2.50

1.80
1.50

1.30
1.30

6.53

0.15

1.00

1
1

5.82
5.82

0.15
0.15

1.00
1.00

1
1

1.54
1.54

0.15
0.15

1.00
1.00

1.54

0.15

1.00

Total Und.

100.00

M2

99.79

M3

52.23

M3

61.82

M3

61.82

M3

5.50

M3

37.55

M2

10.04

M3

101.93

M2

Viga cimentacion
Eje A-A
Eje B-B
Eje C-C
Eje 1-1
Eje 2-2
Eje 3-3

1
1
1
1
1

4.07
4.07
1.08
1.08
1.08

Diviciones interiores
1
1
02.02.02

RELLENO COMPACTADO CON MATERIAL PROPIO EN CAPAS DE 0.20m


Zapatas
Z-1
1
Z-2
Z-3

1
1

0.83
0.40

6.50
37.44
4.88

Viga cimentacion y sobrecimiento


Eje A-A
Eje B-B
Eje C-C
Eje 1-1
Eje 2-2

02.02.03

1
1
1
1

1
Eje 3-3
1
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES Y OTROS

0.98
0.87
0.87
0.23
0.23
0.23

Excavacion
47.55
02.02.04

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO


61.82

02.02.05

AFIRMADO e=20 cm EN INTERIOR


PRIMER PISO

03.00.00

CONCRETO SIMPLE

03.01.00

SOLADOS
SOLADO E= 2" MEZCLA 1:12 CEMENTO-HORMIGON
Zapatas
Z-1
Z-2
Z-3

03.03.00

Area=

100.00

225.30

BOLSAS

2.50

2.00

8
1

2.00
2.50

1.80
1.50

CEMENTO=
1
1
1

CONCRETO EN SOBRECIMIENTOS CEMENTO-HORMIGON + 30% CEMENTO=


Eje A-A
Eje B-B
Eje C-C
Eje 1-1
Eje 2-2
Diviciones interiores

03.04.00

0.05

5.00

5.00
28.80
3.75

50.21

BOLSAS

1
1

12.50
6.00

0.14
0.50

1.20
1.20

1
1

12.50
1.50

0.14
0.25

1.20
1.20

4.40

0.12

1.20

0.45
0.63

10.25

0.12

0.20

0.25

12.50

1.20

30.00

1
1
1
1
1

2.10
3.60
2.10

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS


Eje A-A

N de Partida

Medidas
Ancho Altura

N de
Elem.

N de
Cant.

Largo

1
1

6.00
12.50

1.20
1.20

1
1

1.50
4.40

1.20
1.20

10.25

0.20

4.10

165.22
2.50

BOLSAS
2.00

0.50

8
1

2.00
2.50

1.80
1.50

0.50
0.50

2.50
14.40

ACERO 5/8"

36

VAR.

56.67
14.00

BOLSAS
0.25

0.40

1
1

14.00
12.00

0.25
0.25

0.40
0.40

1
1

7.20
7.20

0.25
0.25

0.40
0.40

7.20

0.25

0.40

ACERO 1/2"

32

VAR.

295.00

ACERO 3/8"

39

VAR.

198.00

Descripcin
Eje B-B
Eje C-C

2
2

Eje 1-1
Eje 2-2

Parcial

Total Und.

14.40
30.00
3.60
10.56

Diviciones interiores
04.00.00
04.01.00

CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS F'C= 210 KG/CM2
Z-1

CEMENTO=
1
1

Z-2
Z-3
04.02.00

04.03.00

519.00

KG

7.08

M3

529.98

KG

5.90

M3

958.90

KG

9.46

M3

535.35

KG

178.45

M2

750.00

UND

519.00

VIGAS DE CIMENTACION
CEMENTO=
1
1

VC (25 X 40) EJE B-B


V C (25 X 40) EJE C-C

1
1

VC (25 X 40) EJE 1-1


V C (25 X 40) EJE 2-2

1
1

VC (25 X 40) EJE 3-3

04.09.00

M3

1.88

ACERO F'Y=4200 KG/CM2 GRADO 60 EN ZAPATAS


Ver planilla de metrado de acero

CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2


VC (25 X 40) EJE A-A

04.04.00

20.65

1.40
1.40
1.20
0.72
0.72
0.72

ACERO F'Y=4200 KG/CM2 GRADO 60 EN CIMENTACION


Ver planilla de metrado de acero

COLUMNAS
CONCRETO EN COLUMNAS F'C=210 KG/CM2
CEMENTO=

47.20

BOLSAS

0.60
0.50

0.25
0.25

3.80
3.80

0.40

0.25

3.80

PRIMER PISO
Columna C-1
Columna C-2

8
2

1
1

ACERO 5/8"

62

VAR.

892.00

ACERO 1/2"

18

VAR.

168.00

Columna C-3
04.10.00

04.12.00

3.80
0.76

ACERO F'Y=4200 KG/CM2 GRADO 60 EN COLUMNAS


Ver planilla de metrado de acero

LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS fc=210KG/CM2

CEMENTO=

PRIMER PISO
04.13.00

0.57

75.69

BOLSAS
90.00

Area=

ACERO 1/2"

54

VAR.

1
1

1
1

Area=
Area=

70.00
10.00

Area=

10.45

1
1

1
1

Area=

56.00

1
1

1
1

Area=
Area=
Area=

17.00
10.00
5.00

90.00

ACERO F'Y=4200 KG/CM2 GRADO 60 EN LOSAS ALIGERADAS


Ver planilla de metrado de acero

04.14.00

498.00

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS


PRIMER PISO
Sala de Uso Multiple
Cocina
Deposito
SEGUNDO PISO
Psicomotricidad
Topico
Psicologia
SS.HH. Docentes

70.00
10.00
10.45

56.00
17.00
10.00
5.00

LADRILLO DE ARCILLA HUECO 15X30X30 PARA TECHO


750.00
CONCRETO EN VIGAS F'C=210 KG/CM2
PRIMER PISO
VC (25 X 40) EJE A-A
VC (25 X 40) EJE B-B
V C (25 X 40) EJE C-C
VC (25 X 40) EJE 1-1
V C (25 X 40) EJE 2-2
VC (25 X 40) EJE 3-3

CEMENTO=
1
1
1
1
1
1

1
1
1
1
1
1

56.67
14.00
14.00
12.00
7.20
7.20
7.20

BOLSAS
0.25
0.25
0.25
0.25
0.25
0.25

56.67
0.40
0.40
0.40
0.40
0.40
0.40

1.40
1.40
1.20
0.72
0.72
0.72

7.08

M3

N de Partida
04.19.00

Descripcin

N de
Elem.

N de
Cant.

Largo

Medidas
Ancho Altura

Parcial

Total Und.

ACERO F'Y=4200 KG/CM2 GRADO 60 EN VIGAS


PRIMER PISO

04.20.00

Ver planilla de metrado de acero

1224.92

SEGUNDO PISO
Ver planilla de metrado de acero

1224.92

V 101 (25 X 40) EJE C-C


V 101 (25 X 40) EJE D-D
V 101 (25 X 40) EJE E-E
V 102 (25 X 40) EJE 1-1
V 102 (25 X 40) EJE 2-2
V 102 (25 X 40) EJE 3-3
SEGUNDO PISO
V 101 (25 X 40) EJE A-A
V 101 (25 X 40) EJE B-B
V 101 (25 X 40) EJE C-C
V 101 (25 X 40) EJE D-D
V 101 (25 X 40) EJE E-E
V 102 (25 X 40) EJE 1-1
V 102 (25 X 40) EJE 2-2
V 102 (25 X 40) EJE 3-3
Parapeto principal
Parapetos posterior

Eje D-D entre los Ejes 1-3


Eje E-E entre los Ejes 1.3
Eje 1-1 entre los Ejes A-E
Eje 1-1 entre los Ejes A-E
Eje 3-3 entre los Ejes A-E

COLUMNAS C1
SEGUNDO PISO
Eje A-A entre los Ejes 1-3
Eje D-D entre los Ejes 1-3
Eje E-E entre los Ejes 1.3
Eje 1-1 entre los Ejes A-E
Eje 1-1 entre los Ejes A-E
Eje 3-3 entre los Ejes A-E

COLUMNAS C1

06.02.00

1
1

1
1

9.61
9.61

Perim=
Perim=

0.65
0.65

6.25
6.25

134.85

M2

1
1
1

1
1

9.61
9.61

Perim=
Perim=

0.65
0.65

1
1

9.61
13.97

Perim=
Perim=

0.65
0.65

6.25
6.25
6.25

1
1

13.97
13.97

Perim=
Perim=

0.65
0.65

9.61

Perim=

0.65

1
1

9.61
9.61

Perim=
Perim=

0.65
0.65

1
1

9.61
9.61

Perim=
Perim=

0.65
0.65

1
1

13.97
13.97

Perim=
Perim=

0.65
0.65

13.97

Perim=

0.65

1
1

14.92

0.60

14.92

0.60

1
1

6.00

2.70

2
2

6.00
4.13

2.70
2.70

2
2

4.71
3.77

2.70
2.70

5.34

2.70
2.70

22
1

2
2

2.70
1.20

1
1

6.00

2.70

2
2

6.00
4.13

2.70
2.70

2
2

4.71
3.77

2.70
2.70

5.34

2.70
2.70

22
1

2.70

2.70
2.70

1.20

2.70

14.00

14.00

1
1
1
1
1
1
1
1
1
1
1

973.86

ML

175.18

M2

15.05

ML

228.90

ML

120.60

ML

9.08
9.08
9.08
6.25
6.25
6.25
6.25
6.25
9.08
9.08
9.08
8.95
8.95

JUNTAS DE CONSTRUCCION
JUNTAS DE TEKNOPOR DE 1"
PRIMER PISO
Eje A-A entre los Ejes 1-3

06.00.00
06.01.00

KG

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS


PRIMER PISO
V 101 (25 X 40) EJE A-A
V 101 (25 X 40) EJE B-B

05.00.00
05.01.00

2633.57

1
1
1
1

1
1
1
1

2.70
2.70

32.40
32.40
22.30
25.43
20.36
28.84

320.76
2.40
32.40
32.40
22.30
25.43
20.36
28.84

320.76
6.48

COBERTURAS
COBERTURA DE TEJA ANDINA
5.82

162.96

CUMBRERA DE TEJA ANDINA

06.03.00

Tubo Lac de 2" x 4" x 2.5 mm

06.04.00

Tubo Lac de 2" x 3" x 2.5 mm

14.00

Tijeral tipo 1
Tubo Lac de 2" x 4" x 2.5 mm
10
Tubo Lac de 2" x 3" x 2.5 mm

10
10
10

1
1

11.25
5.82

112.50

5.82

58.20
58.20

1.50

15.00

N de Partida

Descripcin

N de
Elem.

N de
Cant.

Largo

10

2
2

1.10
0.70

10

2
2

1.86
1.62

15

10
10
01.08
01.08.01

Medidas
Ancho Altura

Parcial

Total Und.

22.00
14.00
37.20
32.40

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)


15.00

15.00

UND

BLOQUE

ELEMENTO

GEOMETRIA DEL ELEM. ( FC )

CANT.

N DE

LONG.

LONGIT.

ELEM. EMPAL. ELEMEN.

01.01.01.05.01

3/8"

1/2"

5/8"

PESO TOTAL EN KG
3/4"

1"

1/4"

3/8"

1/2"

5/8"

3/4"

1"

TOTAL

OBSERV.

2032.02

Kg

OBRAS DE CONCRETO ARMADO

01.01.01.05.01
01.01.01.05.01.02

LONGITUD TOTAL EN ML.


1/4"

ZAPATAS
ACERO fy=4200Kg/cm2 GRADO 60 EN ZAPATAS

BLOQUE DE BIBLIOTECA Y CENTRO DE

2032.02
1058.40

Z-1

1.35

5/8

10

1.35

81.00

129.60

1.35

5/8

10

1.35

81.00

129.60

1.85

5/8

15

1.85

249.75

399.60

1.85

5/8

15

1.85

249.75

399.60

973.62
Z-2

01.01.01.05.02.03

1,011.66

ACERO fy=4200Kg/cm2 GRADO 60 EN VIGAS DE CONECCION

VIGAS DE CONECCION
9.60
0.3

Kg

1011.66
1011.66

1/2

1.20

11.40

171.00

174.42

1/2

1.20

11.40

171.00

174.42

3/8

56

0.15

1.28

1/2

1.20

15.80

142.20

145.044

1/2

1.20

15.80

142.20

145.04

3/8

80

0.15

1.28

5/8

1.20

11.41

136.92

219.07

5/8

1.20

11.41

136.92

219.07

3/8

56

0.15

1.28

0.3

V 101 (25 X 40) EJE A-A;B-B,C-C


0.3

9.60

0.3

0.17
ESTRIBOS

358.40

200.70

0.32

14.00
0.3

0.3

V 102 (25 X 40) EJE 1-1;2-2;3-3


0.3

14.00

0.3

0.17
ESTRIBOS

307.20

172.03

0.32

01.01.01.05.02.03

1,224.92

ACERO fy=4200Kg/cm2 GRADO 60 EN VIGAS

VIGAS DE CONECCION
9.61
0.3

0.3

V 101 (25 X 40) EJE A-A;B-B,C-C


0.3

9.61

0.3

0.17
ESTRIBOS

286.72

160.56

1224.92
1224.92

Kg

BLOQUE

ELEMENTO

GEOMETRIA DEL ELEM. ( FC )

N DE

LONG.

LONGIT.

LONGITUD TOTAL EN ML.

PESO TOTAL EN KG

CANT.

5/8

1.20

15.77

141.93

227.09

5/8

1.20

15.77

141.93

227.09

3/8

80

0.15

1.28

ELEM. EMPAL. ELEMEN.

1/4"

3/8"

1/2"

5/8"

3/4"

1"

1/4"

3/8"

1/2"

5/8"

3/4"

1"

TOTAL

OBSERV.

205.63
129.47

Kg

0.32

13.97
0.3

0.3

V 102 (25 X 40) EJE 1-1;2-2;3-3


0.3

13.97

0.3

0.17
ESTRIBOS

307.20

172.03

0.32

01.01.01.05.01.02

ACERO fy=4200Kg/cm2 GRADO 60 EN SOBRECIMIENTO REFORZADO

SOBRECIMIENTO

0.00
1.60

3/8

136

1.70

231.20

129.472

3/8

34.00

136.00

76.16

0.1
76.16

34.00

03.01.04.04.03

ACERO fy=4200Kg/cm2 GRADO 60 EN COLUMNAS


C-01

0.30
7.50

5/8
1/2

6
6

10
8

3/8

60

5/8
1/2

4
4

8
4

3/8

28

5/8
1/2

11
11

4
2

3/8

11

60

8.10
8.10

486.00

3,227.49
3227.49
3227.49

Kg

2112.97

Kg

777.60

388.80

396.58

0.3
0.17
0.27

C-02

0.30
7.50

0.15

1.18

424.80

8.10
8.10

237.89

259.20

414.72

129.60

132.19

0.3
0.17
0.17

C-03

0.30
8.50

0.15

0.98

109.76

9.10
9.10

61.47

400.40

640.64

200.20

204.20

0.3
0.17
0.17

03.01.04.08.03

0.15

0.98

646.80

362.21

ACERO fy=4200Kg/cm2 GRADO 60 EN LOSAS ALIGERADAS

2112.97
2112.97

9.60
0.15
LOSA ALIGERADA

0.15

1/2

22

1.20

11.10

488.40

498.17

BLOQUE

ELEMENTO

GEOMETRIA DEL ELEM. ( FC )

0.13

14.92

0.13

N DE

LONG.

LONGIT.

LONGITUD TOTAL EN ML.

PESO TOTAL EN KG

CANT.

1/2

22

1.20

16.37

1/4

160

1.20

10.80

3456.00

864

1/4

1.20

16.12

64.48

16.12

ELEM. EMPAL. ELEMEN.

1/4"

3/8"

1/2"

5/8"

3/4"

1"

1/4"

3/8"

720.28

1/2"

5/8"

3/4"

1"

TOTAL

OBSERV.

293.31

Kg

734.69

9.60
TEMPERATURA
14.92

03.01.04.08.04

ACERO fy=4200Kg/cm2 GRADO 60 EN COLUMNETAS

293.31
293.31
CC-01

0.00

3/8''

22

3/8

22

20

4.25

269.28

274.67

4.00
0.25
0.12
0.22

0.15

0.97

33.29

18.64

METRADO DE ESTRUCTURAS
02. ARQUITECTURA

N de
Partida
02

Descripcin

N de
Elem.

N de
Cant.

1
1

1
1

1
1

1
1

Medidas
Parcial
Largo Ancho Altura

Total

Und.

ARQUITECTURA

PRIMER PISO
02.01

OBRAS DE CONCRETO SIMPLE

02.01.01 VEREDA
02.01.01.01 VEREDA DE CONCRETO DE 6" BRUADO
Vereda perimetral

16.67
16.67

1.20
1.70

7.30
7.30

1.50
1.20

02.01.01.03 JUNTAS ASFALTICAS EN VEREDAS


Vereda perimetral
02.02

MUROS Y TABIQUES

02.02.01

MURO DE CABEZA LADRILLO KIN-KONG DE ARCILLA


Eje A-A entre los Ejes 1-3
Eje D-D entre los Ejes 1-3
Eje E-E entre los Ejes 1.3
Eje 1-1 entre los Ejes A-E
Eje 1-1 entre los Ejes A-E
Eje 3-3 entre los Ejes A-E
Eje 3-3 entre los Ejes A-E

02.02.02

0.20
0.20

7.30
7.30

0.20
0.20

10

1.50

1
1

6.00

2.70

1
1

6.00
4.13

2.70
2.70

1
1

4.71
3.77

2.70
1.20

1
1

5.34
4.00

2.70
1.20

1
1

1
1

1.00
1.20

2.70
1.20

2.70
1.44

6.00

2.70

1
1

4.13
4.71

2.70
2.70

16.20
11.15

1
1

3.77
5.34

1.20
2.70

4.00

1.20

6.00

2.70

1
1
1

6.00
4.13
4.71

0.80
2.70
0.80

1
1

3.77
5.34

2.70
2.70

1
1

4.00
1.00

2.07
2.70

1.20

1.20

1
1

02.03

REVOQUES ENLUCIDOS Y MOLDURAS

02.03.01

TARRAJEO EN MUROS EXTERIORES MEZCLA 1:5 CEMENTO:ARENA


Eje A-A entre los Ejes 1-3
1
Eje E-E entre los Ejes 1.3
Eje 1-1 entre los Ejes A-E
Eje 1-1 entre los Ejes A-E
Eje 3-3 entre los Ejes A-E
Eje 3-3 entre los Ejes A-E

02.03.03

Eje 1-1 entre los Ejes A-E


Eje 3-3 entre los Ejes A-E
Eje 3-3 entre los Ejes A-E
Eje 2-2 entre los Ejes D-E
Eje 2-2 entre los Ejes D-E

02.03.05

1
1

2
1
1
1
1
1
2
2

TARRAJEO DE SUPERFICIE COLUMNAS INCL. ARISTAS MEZCLA 1:5 CEMENTO:ARENA


Columna C-1
Perimet=
3
1
4

3
8

1
1

V 101 (25 X 40) EJE D-D


V 101 (25 X 40) EJE E-E
V 102 (25 X 40) EJE 1-1
V 102 (25 X 40) EJE 2-2
V 102 (25 X 40) EJE 3-3

1
1
1
1
1
1
1
1

15.00

80.01

M2

4.14

M2

63.81

M2

81.88

M2

78.98

M2

72.89

M2

17.90

M2

3.33
1.46
1.46

15.00

16.20
16.20
11.15
12.72
4.52
14.42
4.80

2.70

Perimet=
Perimet=

1.75
2.25

2.70
2.70

Perimet=
Perimet=

1
0.5

2.70
2.70

12.72
4.52
14.42
4.80

16.20
9.60
11.15
3.77
10.18
14.42
8.28
5.40
2.88

16.20
18.90
18.23
21.60
4.05

TARRAJEO DE SUPERF.VIGAS INCL.ARISTAS, MEZCLA 1:5 CEMENTO:ARENA


V 101 (25 X 40) EJE A-A
V 101 (25 X 40) EJE B-B
V 101 (25 X 40) EJE C-C

02.03.07

1
1

TARRAJEO EN MUROS INTERIORES MEZCLA 1:5 CEMENTO:ARENA


Eje A-A entre los Ejes 1-3
1
Eje D-D entre los Ejes 1-3
Eje E-E entre los Ejes 1.3
Eje 1-1 entre los Ejes A-E

02.03.04

M2

3.33

MURO DE SOGA LADRILLO KIN-KONG DE ARCILLA


Eje 2-2 entre los Ejes D-E
Eje 2-2 entre los Ejes D-E

9.59

8.76

16.67
16.67

1
1

M2

28.34
10.95

02.01.01.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS


Vereda perimetral

68.05
20.00

1
1
1

9.61
9.61
9.61

0.80
1.05
1.05

1
1

9.61
9.61

0.80
1.05

1
1

13.97
13.97

0.65
0.65

13.97

0.65

TARRAJEO CON IMPERMEABILIZANTE EN RECOLECTORES Y PARAPETOS 1:5 CEMENTO:ARENA

7.69
10.09
10.09
7.69
10.09
9.08
9.08
9.08

Recolectores en fachada Principal

02.03.08

02.03.09

1
1

1
1

14.92

0.60

Recolectores en fachada Posterior

14.92

0.60

VESTIDURA DE DERRAMES
V-1

5.80

V-2
V-3

2
1

2
2

4.80
4.40

P-1
P-2

2
2

2
2

Eje E-E entre los Ejes 1.3


Eje 1-1 entre los Ejes A-E
Eje 1-1 entre los Ejes A-E
Eje 3-3 entre los Ejes A-E

COLUMNAS C1

02.04

CIELORRASOS

02.04.01

CIELORRASOS CON MEZCLA C:A 1:5 e= 1.5 CM


Alero fachada principal
Alero fachada posterior

Deposito

Deposito
CONTRAPISO DE 48 MM.
Sala de Uso Multiple
Cocina
Deposito
02.05.03

2
2

4.13
4.71

2
2

3.77
5.34

2
2

2.70
1.20

1
1

1
1

14.92

2.31

14.92

0.60

1
1

1
1

Area=
Area=

70.00
10.00

Area=

10.45

1
1

1
1

Area=
Area=

70.00
10.00

Area=

10.45

1
1

1
1

Area=

70.00

Area=
Area=

10.00
10.45

1
1

1
1

Area=

70.00

Area=
Area=

10.00
10.45

22

PISO DE CERAMICO ANTIDESLIZANTE AT. 0.40x0.40 M


Sala de Uso Multiple
Cocina
Deposito

02.06

ZOCALOS Y CONTRAZOCALOS

02.06.01

ZOCALO DE CEMENTO PULIDO C/MORTERO 1:5 DE 2CM. DE H=20M.


Fachada posterior
1
Fachada principal

02.06.02

CONTRAZOCALO DE MAYOLICA BLANCA 0.20 X 0.20 M


Cocina

14.03

1
1

perimetro=

11.03

90.45

M2

90.45

M2

90.45

M2

28.06

16.55

M2

7.40

M2

4.86

M2

7.50

PAR

4.00

PZA

34.47
8.95

70.00
10.00
10.45

70.00
10.00
10.45

70.00
10.00
10.45

70.00
10.00
10.45

14.03
14.03

14.03

1.50

16.55

1.37

2.70

7.40

PUERTA CONTRAPLACADA CON TRIPLAY E=6mm


P-2

0.90

2.70

4.86

2
3

1.5
1.5

3.00

CERRADURA PARA PUERTA DE TRES GOLPES


P-1

P-2

2.00
2.00

CERRAJERIA
BISAGRA CAPUCHINA DE 4"

VIDRIOS, CRISTALES Y SIMILARES

M2

2.40

02.11

90.45

118.80

PUERTA DE MADERA CEDRO NACIONAL C/SOBRE LUZ


P-1

02.10.02

M2

10.68

CARPINTERIA DE MADERA

P-1
P-2

43.42

9.42
7.54

02.08.01

02.10
02.10.01

ML

12.00
12.00
8.26

02.08

02.08.01

181.10

25.20

PISOS Y PAVIMENTOS
FALSO PISO DE 4" DE CONCRETO 1:10
Sala de Uso Multiple
Cocina

02.05.02

6.00
6.00

1
1

ML

8.80
27.08

CIELORRASO DE BALDOSA ACUSTICA


Sala de Uso Multiple
Cocina

02.05
02.05.01

6.77
6.30

2
2

1
1
1

126.68
46.40
19.20

BRUA DE 1CM ENTRE MUROS Y ESTRUCTURAS


VIGAS
Eje A-A entre los Ejes 1-3
Eje D-D entre los Ejes 1-3

02.04.02

8.95
8.95

4.50

02.11.01

02.12
02.12.01

02.12.02

02.12.03

02.12.04

02.12.05

02.12.07

02.11.08

VIDRIO TEMPLADO DE 8MM. INCLUYE PROTECTOR


V-1
V-2
V-3

4
2
1

1
1
1

1.40
1.20
1.00

PINTURA
PINTURA EN CIELORRASO
Alero fachada principal
Alero fachada posterior

1
1

1
1

14.92
14.92

PINTURA EN EXTERIORES
Eje A-A entre los Ejes 1-3
Eje E-E entre los Ejes 1.3
Eje 1-1 entre los Ejes A-E
Eje 1-1 entre los Ejes A-E
Eje 3-3 entre los Ejes A-E
Eje 3-3 entre los Ejes A-E

1
1
1
1
1
1

1
1
1
1
1
1

6.00
4.13
4.71
3.77
5.34
4.00

2.70
2.70
2.70
1.20
2.70
1.20

16.20
11.15
12.72
4.52
14.42
4.80

PINTURA EN INTERIORES
Eje A-A entre los Ejes 1-3
Eje D-D entre los Ejes 1-3
Eje E-E entre los Ejes 1.3
Eje 1-1 entre los Ejes A-E
Eje 1-1 entre los Ejes A-E
Eje 3-3 entre los Ejes A-E
Eje 3-3 entre los Ejes A-E
Eje 2-2 entre los Ejes D-E
Eje 2-2 entre los Ejes D-E

1
2
1
1
1
1
1
2
2

1
1
1
1
1
1
1
1
1

6.00
6.00
4.13
4.71
3.77
5.34
4.00
1.00
1.20

2.70
0.80
2.70
0.80
2.70
2.70
2.07
2.70
1.20

16.20
9.60
11.15
3.77
10.18
14.42
8.28
5.40
2.88

3
4
3
8
3

1
1
1
1
1

Perimet=
Perimet=
Perimet=
Perimet=
Perimet=

2.70
2.70
2.70
2.70
2.70

16.20
18.90
18.23
21.60
4.05

1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1

9.61
9.61
9.61
9.61
9.61
13.97
13.97
13.97

0.80
1.05
1.05
0.80
1.05
0.65
0.65
0.65

7.69
10.09
10.09
7.69
10.09
9.08
9.08
9.08

PINTURA EN CONTRAZOCALOS Y ZOCALOS H= 0.30M C/ESMALTE


Alero fachada principal
1
Alero fachada posterior
1

2
2

14.92
14.92

0.60
0.60

0.60
0.60

10.74
10.74

PINTURA EN PUERTAS C/BARNIZ 2 MANOS


P-1
P-2

2
2

2
2

1.04
0.90

2.70
2.70

11.20
9.72

1
1
1
1
1
1

1
1
1
1
1
1

6.00
6.00
3.85
6.87
5.39
3.05

2.70
2.70
2.70
1.20
2.70
1.20

16.20
16.20
10.40
8.24
14.55
3.66

1
1
1
1

1
1
1
1

6.10
2.00
2.03
3.02

2.70
2.70
2.70
2.70

16.47
5.40
5.48
8.15

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO EN MUROS EXTERIORES MEZCLA 1:5 CEMENTO:ARENA
Eje A-A entre los Ejes 1-3
1
Eje E-E entre los Ejes 1.3
1
Eje 1-1 entre los Ejes A-E
1
Eje 1-1 entre los Ejes A-E
1
Eje 3-3 entre los Ejes A-E
1
Eje 1-1 entre los Ejes A-E
1

1
1
1
1
1
1

6.00
6.00
3.85
6.87
5.39
3.05

2.70
2.70
2.70
1.20
2.70
1.20

16.20
16.20
10.40
8.24
14.55
3.66

TARRAJEO EN MUROS INTERIORES MEZCLA 1:5 CEMENTO:ARENA


Eje A-A entre los Ejes 1-3
1
Eje E-E entre los Ejes 1.3
1
Eje 1-1 entre los Ejes A-E
1
Eje 1-1 entre los Ejes A-E
1
Eje 3-3 entre los Ejes A-E
1
Eje 1-1 entre los Ejes A-E
1
Divisiones
2
2

1
1
1
1
1
1
1
1

6.00
6.00
3.85
6.87
5.39
3.05
6.10
2.00

2.70
2.70
2.70
1.20
2.70
1.20
2.70
2.70

16.20
16.20
10.40
8.24
14.55
3.66
32.94
10.80

PINTURA EN COLUMNAS
Columna C-1

PINTURA EN VIGA
V 101 (25 X 40) EJE A-A
V 101 (25 X 40) EJE B-B
V 101 (25 X 40) EJE C-C
V 101 (25 X 40) EJE D-D
V 101 (25 X 40) EJE E-E
V 102 (25 X 40) EJE 1-1
V 102 (25 X 40) EJE 2-2
V 102 (25 X 40) EJE 3-3

1.50
1.50
1.50

2.31
0.60

2
1.75
2.25
1
0.5

145.31

P2

43.42

M2

63.81

M2

81.88

M2

78.98

M2

72.89

M2

21.48

20.92

M2

69.25

M2

35.51

M2

69.25

M2

140.26

M2

90.42
38.75
16.15

34.47
8.95

SEGUNDO PISO
02.02
02.02.01

02.02.02

02.03
02.03.01

02.03.03

MUROS Y TABIQUES
MURO DE CABEZA LADRILLO KIN-KONG DE ARCILLA
Eje A-A entre los Ejes 1-3
Eje E-E entre los Ejes 1.3
Eje 1-1 entre los Ejes A-E
Eje 1-1 entre los Ejes A-E
Eje 3-3 entre los Ejes A-E
Eje 1-1 entre los Ejes A-E
MURO DE SOGA LADRILLO KIN-KONG DE ARCILLA
Divisiones

2
2
02.03.04

02.03.05

02.03.07

02.03.08

02.03.09

02.04.02

02.05
02.05.01

02.05.02

02.05.03

02.06
02.06.01

02.06.02

02.06.03

02.08
02.08.01

2.03
3.02

TARRAJEO DE SUPERFICIE COLUMNAS INCL. ARISTAS MEZCLA 1:5 CEMENTO:ARENA


Columna C-1
Perimet=
3
1
Perimet=
4
1
Perimet=
3
1
Perimet=
8
1
Perimet=
3
1
TARRAJEO DE SUPERF.VIGAS INCL.ARISTAS, MEZCLA 1:5 CEMENTO:ARENA
V 101 (25 X 40) EJE A-A
1
1
V 101 (25 X 40) EJE B-B
1
1
V 101 (25 X 40) EJE C-C
1
1
V 101 (25 X 40) EJE D-D
1
1
V 101 (25 X 40) EJE E-E
1
1
V 102 (25 X 40) EJE 1-1
1
1
V 102 (25 X 40) EJE 2-2
1
1
V 102 (25 X 40) EJE 3-3
1
1

2
1.75
2.25
1
0.5

9.61
9.61
9.61
9.61
9.61
13.97
13.97
13.97

TARRAJEO CON IMPERMEABILIZANTE EN RECOLECTORES Y PARAPETOS 1:5 CEMENTO:ARENA


Recolectores en fachada Principal
14.92
1
1
Recolectores en fachada Posterior
14.92
1
1
VESTIDURA DE DERRAMES
V-1
V-2
V-3
P-1
P-2
P-3

BRUA DE 1CM ENTRE MUROS Y ESTRUCTURAS


VIGAS
Eje A-A entre los Ejes 1-3
Eje D-D entre los Ejes 1-3
Eje E-E entre los Ejes 1.3
Eje 1-1 entre los Ejes A-E
Eje 1-1 entre los Ejes A-E
Eje 3-3 entre los Ejes A-E

3
2
1
1
2
1

2
2
2
2
2
2

2.70
2.70

10.96
16.31

2.70
2.70
2.70
2.70
2.70

16.20
18.90
18.23
21.60
4.05

0.80
1.05
1.05
0.80
1.05
0.65
0.65
0.65

7.69
10.09
10.09
7.69
10.09
9.08
9.08
9.08

0.60
0.60

8.95
8.95

6.77
6.30
6.10

34.80
25.20
15.68
13.54
25.20
12.20

5.80
6.30
7.84

1
1
1
1
1
1

2
2
2
2
2
2

6.00
6.00
4.13
4.71
3.77
5.34

12.00
12.00
8.26
9.42
7.54
10.68

22
1

2
2

2.70
1.20

118.80
2.40

CIELORRASOS
CIELORRASOS CON MEZCLA C:A 1:5 e= 1.5 CM
Alero fachada principal
Alero fachada posterior

1
1

1
1

14.92
14.92

2.31
0.60

34.47
8.95

CIELORRASO DE BALDOSA ACUSTICA


Psicomotricidad
Topico
Psicologia
SS.HH. Docenter

1
1
1
1

1
1
1
1

Area=
Area=
Area=
Area=

56.00
17.00
10.00
5.00

56.00
17.00
10.00
5.00

PISOS Y PAVIMENTOS
FALSO PISO DE 4" DE CONCRETO 1:10
Psicomotricidad
Topico
Psicologia
SS.HH. Docenter

1
1
1
1

1
1
1
1

Area=
Area=
Area=
Area=

56.00
17.00
10.00
5.00

56.00
17.00
10.00
5.00

CONTRAPISO DE 48 MM.
Psicomotricidad
Topico
Psicologia
SS.HH. Docenter

1
1
1
1

1
1
1
1

Area=
Area=
Area=
Area=

56.00
17.00
10.00
5.00

56.00
17.00
10.00
5.00

PISO DE CERAMICO ANTIDESLIZANTE AT. 0.40x0.40 M


Psicomotricidad
Topico
Psicologia
SS.HH. Docentes

1
1
1
1

1
1
1
1

Area=
Area=
Area=
Area=

56.00
17.00
10.00
5.00

56.00
17.00
10.00
5.00

1
1

14.03
14.03

COLUMNAS C1

02.04
02.04.01

1
1

ZOCALOS Y CONTRAZOCALOS
ZOCALO DE CEMENTO PULIDO C/MORTERO 1:5 DE 2CM. DE H=20M.
Fachada posterior
1
Fachada principal
1

78.98

M2

72.89

M2

17.90

M2

126.62

ML

181.10

ML

43.42

M2

88.00

M2

88.00

M2

88.00

M2

88.00

M2

28.06

13.35

M2

6.00

ML

7.40

M2

14.03
14.03

CONTRAZOCALO DE MAYOLICA BLANCA 0.20 X 0.20 M


SS.HH. Docentes

perimetro=

8.90

1.50

13.35

CONTRAZOCALO DE CERAMICO 40 x 40 CM. H=10CM.


Topico

perimetro=

4.00

1.50

6.00

CARPINTERIA DE MADERA
PUERTA DE MADERA CEDRO NACIONAL C/SOBRE LUZ
P-1

2.70

7.40

1.37

02.08.01

02.08.01

02.10
02.10.01

02.10.02

02.10.03

02.11
02.11.01

02.12
02.12.01

02.12.02

02.12.03

02.12.04

02.12.05

02.12.06

02.11.08

PUERTA CONTRAPLACADA CON TRIPLAY E=6mm


P-2

0.90

2.70

4.86

PUERTA CONTRAPLACADA CON TRIPLAY E=6mm


P-3

0.70

2.60

1.82

CERRAJERIA
BISAGRA CAPUCHINA DE 4"
P-1
P-2
P-3

2
2
1

1.5
1.5
1.5

3.00
3.00
1.50

CERRADURA PARA PUERTA DE TRES GOLPES


P-1
P-2

2
2

1
1

2.00
2.00

CERRADURA DE PERILLA CON SEGURIDAD INTERIOR


P-3

1.00

VIDRIOS, CRISTALES Y SIMILARES


VIDRIO TEMPLADO DE 8MM. INCLUYE PROTECTOR
V-1
V-2
V-3

3
2
1

2
2
2

1.40
1.65
2.42

PINTURA
PINTURA EN CIELORRASO
Alero fachada principal
Alero fachada posterior

1
1

1
1

14.92
14.92

PINTURA EN EXTERIORES
Eje A-A entre los Ejes 1-3
Eje E-E entre los Ejes 1.3
Eje 1-1 entre los Ejes A-E
Eje 1-1 entre los Ejes A-E
Eje 3-3 entre los Ejes A-E
Eje 1-1 entre los Ejes A-E

1
1
1
1
1
1

1
1
1
1
1
1

6.00
6.00
3.85
6.87
5.39
3.05

2.70
2.70
2.70
1.20
2.70
1.20

16.20
16.20
10.40
8.24
14.55
3.66

1
1
1
1
1
1
2
2
2
2

1
1
1
1
1
1
1
1
1
1

6.00
6.00
3.85
6.87
5.39
3.05
6.10
2.00
2.03
3.02

2.70
2.70
2.70
1.20
2.70
1.20
2.70
2.70
2.70
2.70

16.20
16.20
10.40
8.24
14.55
3.66
32.94
10.80
10.96
16.31

3
4
3
8
3

1
1
1
1
1

Perimet=
Perimet=
Perimet=
Perimet=
Perimet=

2.70
2.70
2.70
2.70
2.70

16.20
18.90
18.23
21.60
4.05

PINTURA EN VIGA
V 101 (25 X 40) EJE A-A
V 101 (25 X 40) EJE B-B
V 101 (25 X 40) EJE C-C
V 101 (25 X 40) EJE D-D
V 101 (25 X 40) EJE E-E
V 102 (25 X 40) EJE 1-1
V 102 (25 X 40) EJE 2-2
V 102 (25 X 40) EJE 3-3

1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1

9.61
9.61
9.61
9.61
9.61
13.97
13.97
13.97

0.80
1.05
1.05
0.80
1.05
0.65
0.65
0.65

7.69
10.09
10.09
7.69
10.09
9.08
9.08
9.08

PINTURA EN RECOLECTORES Y PARAPETOS


Alero fachada principal
Alero fachada posterior

1
1

1
1

14.92
14.92

0.60
0.60

0.60
0.60

5.37
5.37

2
2
1

2
2
2

1.04
0.90
0.70

2.70
2.70
2.70

11.20
9.72
3.78

PINTURA EN INTERIORES
Eje A-A entre los Ejes 1-3
Eje E-E entre los Ejes 1.3
Eje 1-1 entre los Ejes A-E
Eje 1-1 entre los Ejes A-E
Eje 3-3 entre los Ejes A-E
Eje 1-1 entre los Ejes A-E
Divisiones

PINTURA EN COLUMNAS
Columna C-1

PINTURA EN PUERTAS C/BARNIZ 2 MANOS


P-1
P-2

4.86

M2

1.82

M2

7.50

PAR

4.00

PZA

1.00 UND

1.50
1.50
1.50

2.31
0.60

2
1.75
2.25
1
0.5

320.33

P2

43.42

M2

69.25

M2

140.26

M2

78.98

M2

72.89

M2

10.74

M2

24.70

M2

135.63
106.56
78.15

34.47
8.95

METRADO ESPECIALIDAD DE INSTALACIONES SANITARIAS


OBRA:
PROPIETARIO:
FECHA:

PARTID
A N
4
4.1
4.1.1
4.1.1.1
4.1.1.2
4.1.1.3

I.E. INICIAL AYAHUAY

ESPECIFICACIONES

N
VECES

HOJA N :
PLANO:
HECHO POR:
REVISADO :

MEDIDAS
LARGO

PARCIA
TOTAL
L
PUNTO PZA/UND

INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS
Suministro de Aparato Sanitar
Inodoro one piece de color blanco
Lavatorio Pedestal Manantial Blanco
Griferia Lavatorio Cromada monocomando

2
2
2

2
2
2

2
2
2

4.1.2
4.1.2.1

Suministro de Accesorios
Kit papelera, jabonera y gancho doble de loza

4.1.3

Instalacion de Aparatos Sanita


Instalacion de accesorios
SISTEMA DE AGUA FRIA
Salidas de Agua Fria

4.1.4
4.2
4.2.1
4.2.1.1
4.2.2.
4.2.2.1

4.2.2.2

Salidas de Agua Fria 1/2"


SS.HH

6
6

Red de Alimentacion
Tuberia PVC 3/4"
piso
pared
montante

30.20
25.00
0.60
4.60

25.00
0.60
4.60

4.6
1.2

4.60
1.20

Tuberia PVC 1/2"


montante
pared

5.80

4.2.3

Accesorios de Redes de Agua

4.2.3.1

Tee PVC 3/4"

4.2.3.2

Codo PVC 3/4"

10

10

10

4.2.3.3

Codo PVC 1/2"

4.2.3.4

Reduccion PVC 3/4"-1/2"

4.2.3.5

Tapon PVC 3/4"

4.2.3.6

Tapon PVC 1/2"

4.2.4

Valvulas

4.2.4.1

Valvula Esferica 3/4"

4.2.4.2

Valvula Sheck 3/4"

4.2.4.3

Valvula Esferica 1/2"

5.2

SISTEMA DE DESAGUE
Salidas de Desague

4.2.1
4.2.1.1
4.2.2.
4.2.2.1
4.2.2.2

Salidas de Agua Fria 1/2"


SS.HH.Administracion

Red de Alimentacion
Tuberia PVC 4"
piso

15.00
15.00

15.00

12

12.00

Tuberia PVC 2"


piso

4.2.3

2
2

Accesorios de Redes de desa

12.00

4.2.3.1

Tee PVC 4"

4.2.3.2

Tee PVC 2"

4.2.3.3

Codo PVC 4"

4.2.3.4

Codo PVC 2" de 90

4.2.3.5

Reduccion PVC 4"-2"

4.2.3.6

Tapon PVC 4"

4.2.3.7

Tapon PVC 2"

4.2.3.8

Yee PVC 4"

4.2.3.9

Yee PVC 4"

4.2.3.10

Yee PVC 2"con reduccion a 2"

4.2.3.11

Codo PVC 2" de 45

12

12

12

ANITARIAS

UND

und
und
und
und
und
und

pto

und
und
und
und
und
und
und
und
und

pto

m
m

und
und
und
und
und
und
und
und
und
und
und

METRADO ESPECIALIDAD DE INSTALACIONES


ELECTRICAS
I.E. INICIAL AYAHUAY
HOJA N :
1

OBRA:
PROPIETARIO:
FECHA:

PLANO:
HECHO POR:
REVISADO :

MEDIDAS
PARTID ESPECIFICACIO
PARCIA
N
TOTAL
VECES
A N
NES
L
LARGO PUNTO PZA/UND
SALIDAS PARA ELECTRICIDAD Y
01.00
Salidas de Ilumi
01.01
01.01.01

Salida Centro de Luz

01.02
01.02.01

Salida de Tomac

02.00
02.01
02.02
02.03

SALIDA PARA COMUNICACIONES Y SEALES

40

40

40

pto

20

20

20

pto

4
4
2

4
4
2

4
4
2

pto
pto
pto

03.00
03.01

CANALIZACIONES Y/O T
54.00

54

54

04.00
04.01
04.02

CONDUCTORES Y/O CAB


100.00
200.00

100
200

100
200

m
m

05.00
05.01
05.02

CAJAS DE PASO
2
2

2
2

2
2

und
und

06.00
06.01

TABLERO DE DIS

07.00
07.01
07.02
07.03

INTERRUPTORES THERMOMAGNE

pza

2
2
1

2
2
1

2
2
1

pza
pza
pza

08.00
08.01
08.02
08.03
08.04
08.05

INTERRUPTORES , TOMACORRIENTES, SEALES Y COMUN

09.00
09.01

SISTEMA DE POZ

Salida para Tomacorrientes Bipolartes Simples


Salida de Telefono
Salida de TV cable
Salida para Intercomunicador
Tuberia Electrica PVC- L 25 mm
Alambre 1x6 mm2
Alambre 1x10 mm2 THW
Caja de Paso FG-L 100x100x75
Caja de Paso FG-L 100x100x50
Tableros de Distribucion Caja Metalica con 12 polos
Interruptor Thermomagnetico Monofasica 2x20A
Interruptor Thermomagnetico Monofasica 2x15A
Interruptor Thermomagnetico Trifasica 3x40A
Interruptor Conmutacion
Interruptor Unipolar Simple
Tomacorriente Bipolar Doble
Toma de Telefono
Toma de TV-CABLE
Pozo de Tierra

UND

2
28
20
4
4

2
28
20
4
4

2
28
20
4
4

und
und
und
und
und

glb