Required by
Review Stage
30% Review
60% Review
90% Review
Process Studies
Complete
-----
-----
IFE
IFC
-----
P&IDs
IFA
IFE
IFC
HAZOP
-----
Complete
-----
Line Sizing
Complete
-----
Line Designation
Table (LDT)
IFA
IFE
IFC
Piping Specifications
Approved
-----
-----
Valves
Specialty Items
Equipment
Preliminary
Approved
Certified
Instruments
Preliminary
Approved
Certified
Plot Plan
IFA
IFE
IFC
Piping Specifications
-----
-----
Equipment Layout
Equipment locations
finalized and modeled to
approved information.
Equipment modeled to
certified information.
Piping Design
Supports
-----
Tracing Manifolds/
Utility Stations/ Eye
Wash/ Safety Showers
Not Started.
Preliminary locations
modeled.
Process Design
Vendor Info.
Piping Design
30% Review
60% Review
90% Review
Maintainability, e.g.,
davits, monorails and
cranage, access between
equipment, width and
height requirements under
racks.
Maintainability. Pay
particular attention to
removal clearances, e.g.,
exchanger bundle
removals, O/H cranes
above split casings, etc.
-----
-----
Future piperack
requirements, e.g., widths,
number of levels.
-----
-----
Main structures.
Minor structures.
Fireproofing of structures.
Preliminary identification
of platforms, ladders,
walkways and staircases.
Platforms, ladders,
walkways and staircases.
Davits, monorails and
cranage.
-----
Pump piping.
Pump piping.
-----
-----
-----
-----
-----
Review Objectives
Ground Rules
1. The cut-off point of NPS 6 and above is a judgment call. Some areas, racks for instance, may require that NPS 2 and above be
modeled at this stage.
2. All model review comments are to be addressed immediately following the model review.
3. No changes to approved or frozen items are allowed without Project Engineering approval.
4. The following guidelines have been established for initiating a change. Personal preference is not an acceptable reason:
- Design does not meet the design criteria.
- Design does not meet accepted design practice.
- Design does not meet plant operating standards or client standards for operability, maintainability, fire protection, safe
isolation of equipment, or safety requirements.
- Design does not meet "What-if" review recommendations.