Академический Документы
Профессиональный Документы
Культура Документы
INFORMATION OF CONTRACT
TENDER DATE :
Scope of works :
8/7/2006
Contract Particulars
Basic of Cost Fluctuation
as per KPKR Cir. 12/1980
Tender
Amount
No.
(RM)
Conventinal (I)
Preliminaries
Form of Contract
JKR 203A
Basis Of Tender
Khas Bumiputera
687,750.00
(being 5.05 % of
remainder Contract
Sum)
Contract
Period
Stipulated By Client
104 Weeks
Contract Period
Offered By Contractor
104 Weeks
5.23
Buildings
7,916,069.35
External Works
2,254,268.45
Contract Sum
Number Of Tenders
Received
P.C. Sum
Provisional Sum
18
12,296,797.89
8/18
12,454,710.00
9/18
12,788,156.50
15/18
13,470,446.35
1/18
13,828,000.00
14/18
14,199,999.99
18/18
14,348,595.84
2/18
14,435,769.36
6/18
16,638,000.00
4/18
36,179,418.00
13,828,000.00
Extract of Total
Number Of Tenders
Issued
Lowest(13/18)
3,153,400.00
Bldg. Code:
Name of Building : Klinik Kesihatan Jenis 3
A-2-2417
BQ Reg. Nos:
JKR/IP/CKUB/11/2007
Design/Shape Information: Rectangular Shaped Double Storey Klinik Kesihatan Jenis 3 (Cermai) with overall size 48.2m x 33m
Areas
1518.35
898.36
M2
M2
M2
2416.71
M2
195.72
M2
2605
M2
Functional Unit :
660.22 M2
Number/Composition Of Storeys
Enclosing Wall =
To Floor Ratio
1635.72
2416.71
a)
0.677
b)
Single Storey
c)
2-Storey
d)
3-Storey
e)
- Storey
Storey Heights :
100 %
Drawing No.:
1.
2.
4.50
3.
2.80
4.
5.
6.
7.
8.
9.
10.
11.
12.
RM
5,317,422.20
Provisional Sum : RM
833,946.09
Analysis Index :
Base Index :
Building Functional
Unit Cost :
Prepared by :
Unit
1/3
2416.71
ELEMENT
ELEMENT
COST
REF.
SQ.M
ELEMENT
UNIT
RATE
RM
ELEMENT
TO FLOOR
RATIO
RM
ELEMENT
COST/SQ.M
OF GFA
RM
B=A/(GFA)
D = A/C
E = C/(GFA)
M2
200.26
0.70
6.4
225.78
0.10
1.0
104.66
1.00
4.8
Piling/Special Foundation
1B
338,046.45
139.879
1688
53,058.80
21.955
235
F = (A/<A)%
SUBSTRUCTURE
1A
1C
% OF
BLDG.
COST
391,105.25
SUPERSTRUCTURE
252,936.00
104.661
74,577.80
30.859
898
M2
83.05
0.37
1.4
329,622.90
136.393
2605
M2
126.53
1.08
6.2
Stairs
24,810.35
10.266
10.00
M3
2,481.04
0.004
0.5
2E
External Wall
39,230.30
16.233
1082
M2
36.26
0.45
0.7
2F
372,497.30
154.134
495.73
M2
751.41
0.21
7.0
2G
84,254.00
34.863
2185
M2
38.56
0.90
1.6
2H
Internal Doors
345,714.20
143.052
423.74
M2
815.86
0.18
6.5
2A
Frame
2B
Upper Floor
2C
Roof
2D
1,523,642.85
1,914,748.10
2416.71 M2
2/3
REF.
ELEMENT
ELEMENT
COST
ELEMENT
UNIT
QUANTITY
ELEMENT
UNIT
RATE
RM
ELEMENT
TO FLOOR
RATIO
RM
ELEMENT
COST/SQ.M
OF GFA
RM
% OF
BLDG.
COST
B=A/(GFA)
D = A/C
E = C/(GFA)
80.79
0.12
0.4
108.32
0.90
4.5
356 M2
57.76
0.15
0.4
F = (A/<A)%
1,914,748.10
FINISHES
3A
23,428.80
9.695
3B
236,678.00
97.934
3C
20,561.60
8.508
3D
100,400.00
41.544
2185 M2
45.95
0.90
1.9
3E
123,335.40
51.034
1463 M2
84.30
0.61
2.3
3F
263,651.50
109.095
5022 M2
52.50
2.08
5.0
768,055.30
787,889.00
290 M2
2185 M2
14.8
ELEMENT
UNIT
QUANTITY
OR FLOOR
AREA
SERVED
SERVICES
TENDER
SUM
1,333.63
0.02
1.0
52,011.40
21.522
134,240.00
55.547
2416.71 M2
55.55
1.00
2.5
5C
Electrical Installation
928,302.00
384.118
2416.71 M2
384.12
1.00
17.5
5D
39,086.40
16.173
2416.71 M2
16.17
1.00
0.7
5E
Air Conditioning
244,290.00
101.084
2416.71 M2
101.08
1.00
4.6
5F
Sterilizer System
M2
5G
M2
5H
448,800.00
185.707
185.71
1.00
8.4
5A
Sanitary Appliances
5B
1,846,729.80
TOTAL ELEMENT
COST*
5,317,422.20
39
PRIME
COST
SUM
NO
2416.71 M2
3/3
REF.
ELEMENT
REINFORCEDREINFORCEMENT
CONCRETE
FORMWORK
M3
Kg.
Kg./M3
M2
M2/M3
A.
Piling/Special Foundation
B.
B.i
Strip footing
49
3,050
62.24
184
3.76
B.ii
Stump Wall
B.iii
Pile Caps
167
1,227
7.35
266
1.59
B.iv
Column Stumps
17
1,876
110.35
184
10.82
B.v
Ground Beam
123
24,476
198.99
842
6.85
B.vi
337
18,129
53.79
693
72
22,514
312.69
1,125
15.63
SUPERSTRUCTURE
A.
Frame
A.i
Columns
A.ii
Beams
A.ii.a
Floor
139
31,385
225.79
1,307
9.40
A.ii.b
Roof
41
6,626
161.61
475
11.59
A.ii.c
Other*
139
10,399
74.81
926
6.66
2B
Upper Floors
2C
Roof
635
70.50
59
6.56
2D
Stairs
16
2,218
138.63
122
7.64
2E
External Wall
2F
10
1242
124.20
183
18.30
2G
2H
Internal Doors
625
125.00
104
20.80
TOTAL
431
1,124.00
Bldg. Type :
Bldg. Code:
BRIEF SPECIFICATION
GROSS FLOOR AREA :
REF.
1.
1A.
2416.7 M2
ELEMENT
SPECIFICATION
SUBSTRUCTURE
Piling
B.
Grade 30 reinforced concrete 150mm thick in ground beam with 10mm diameter
reinforcement bars mild steel hot rolled plain round stirrups
1C.
SUPERSTRUCTURE
2A.
Frame
2B.
Upper Floor
2C.
Roof
2C.i
Roof Structure
2C.ii
Roof Covering
2C.iii
Roof Drainage
18 gauge galvanised zinc with soldered joints box gutter size 125mm x 150mm
with bracket and screwed to sawn pressure treated Group A timber fascia board
Grade 30 reinforced concrete 150mm thick to suspended slab with one layer of
BRC Reference A393 200 side laps and 200 end laps
2D.
Stairs
2D.i
Stairs Structure
Grade 30 reinforced concrete 300mm thick landing slab and steps sloping
over 15 degree with 6mm diameter reinforcement MS146 hot rolled deformed
yield steel straight or bent
2D.ii
Stair Finishes
2D.iii
900mm stainless steel railing with 25mm x 25mm vertical hollow section handrail
2E.
External Walls
Non load bearing half brick wall thick in stretcher bond in common bricks with
MS76 225mm x 113mm x 75mm in cement mortar (1:6)
2F.
2G.
Non load bearing half brick wall thick in stretcher bond in common bricks with
MS76 225mm x 113mm x 75mm in cement mortar (1:6)
2H.
Internal Doors
11mm composite crystal clear fire rated door with aluminium frame size
5350mm x 3000mm with 1 no. of 1500mm x 2100mm sliding door including
hatching
1/2
REF.
Bldg. Type :
Bldg. Code:
ELEMENT
SPECIFICATION
FINISHES
3A.
3B.
Unglazed homogeneous tiles size 400mm x 400mm x 10mm thick laid to pattern
approved colour in cement mortar (1:3) on cement and sand (1:3)
3C.
"UCA Dura Vent" ceiling panel 1200mm x 600mm x 4.5mm thick fixed to joist
20mm x 50mm at 610mm centres to suspended ceilings
3D.
"UAC Superflex Flat Sheet" size 1200mm x 610mm x 3.2mm thick fixed to
100mm x 50mm at 1220mm centres and nogging to suspended ceiling
3E.
Plaster work in two coats troweled finish on brickwall, column and beam size
18mm thick with 20mm wide "Knoeing groove former GJ20" line
3F.
Plaster work cement & sand (1:6) steel trowelled in two coats 18mm thick
finish to brickwall, column and beam on all exposed surfaces
4.
10mm thick solid surface backslpash wall panel overall size 2400mm x 1350m x
850mm high epoxy resin with polypropylene laboratory sink and metal cabinet
5.
SERVICES
5A.
Sanitary Appliances
25mm diameter "SAN EI V950" expose level activated water closet flushvalve
complete with 700mm x 300mm L shape brass flushpipe
5B.
Install ABS pipes and fittings cold water system connected to water storage
tank to sanitary appliances, overflow pipes and chases in roof, floor, walls and beam
5C.
Electrical Installation
Provosional Sum
5D.
Communication Installation
Provosional Sum
5E.
Provosional Sum
5F.
Provosional Sum
5G.
Sterilizer System
5H.
5J.
Provosional Sum
2/2
ELEMENT
6575
SQ.M.
ELEMENT
COST
ELEMENT
COST/SQ.M
OF GFA
ELEMENT UNIT
QUANTITY
ELEMENT
UNIT
RATE
RM
RM
UNIT
QUANTITY
RM
B=A/(GFA)
E=A/D
% OF
BLDG.
COST
F=A/COST OF
ALL BLDGS.
Site Preparation
And Earthworks
429,206.00
65.28
Hectares
(M3)
66,583.00
6.45
5.4
102,822.70
15.64
Turfed Area
(M2)
9,059.00
11.35
1.3
Roads, Hardstanding,
Footpaths and Pavings
722,476.00
109.88
Surface Area
(M2)
49,934.00
14.47
9.1
216,906.00
32.99
Perimeter
(M)
1,266.00
171.33
2.7
Surface Drainage
223,140.00
33.94
2,219.00
100.56
2.8
Soil Drainage
325,060.00
49.44
729.00
445.90
4.1
Water Reticulation
157,307.50
23.93
2,052.00
76.66
2.0
2,176,918.20
331.09
1/1
Total length
of drain &
pipework
(M)
REF.
ELEMENT
A - 2 - 6575
SPECIFICATION
1.
2.
3.
4.
5.
Surface Drainage
6.
Soil Drainage
7.
Water Reticulation
2/2