CASE 1
1. Find the settling velocity (vs) for sand particles with a diameter of 0.020 mm.
= 2.650 kg/m3, = 1.002x103 N.s/m2 at 20 oC. Design presedimentation
tanks to be used to remove grit and sand from a river water that is used to
produce 20.000 m3/day drinking water. Use the overflow rate and horizontal
velocities calculated in above.
2. Find the settling velocity (vs) for sand particles with a diameter of 0.050 mm.
= 2.650 kg/m3, = 1.002x103 N.s/m2 at 20 oC. Design presedimentation
tanks to be used to remove grit and sand from a river water that is used to
produce 20.000 m3/day drinking water. Use the overflow rate and horizontal
velocities calculated in above.
Jawab:
1. D= 0.020 mm= 0.020 x 10-3 m
= s= 2.650 kg/m3
= 1.002x103 N.s/m2
= 1000 kg/m3
Vs=g(s- )D2/18
= 9.81(2650-1000) (0.020 x 10-3)2/18x1.002x103
= 3.6 x 10-4m/s
Q= 20.000 m3/day
Design pre-sedimentation:
V=Q/A
A=Q/V
= 20.000/3.6 x 10-4 = 55713094 m2
Aulia Riswalida
21080115120037
Vs=g(s- )D2/18
= 9.81(2650-1000) (0.050 x 10-3)2/18x1.002x103
= 2.3x 10-3m/s
Q= 20.000 m3/day
Design pre-sedimentation:
V=Q/A
A=Q/V
= 20.000/2.3x 10-3= 8914095 m2
CASE 2
1. Find the settling velocity (vs) for sand particles with a diameter of 0.020 mm.
= 2.650 kg/m3, (dinamic viscosity) at 32 oC. Design presedimentation
tanks to be used to remove grit and sand from a river water that is used to
produce 20.000 m3/day drinking water. Use the overflow rate and horizontal
velocities calculated in above.
2. Find the settling velocity (vs) for sand particles with a diameter of 0.050 mm.
= 2.650 kg/m3, (dinamic viscosity) at 32 oC. Design presedimentation
tanks to be used to remove grit and sand from a river water that is used to
produce 20.000 m3/day drinking water. Use the overflow rate and horizontal
velocities calculated in above.
JAWAB:
1. D= 0.020 mm= 0.020 x 10-3 m
= s= 2.650 kg/m3
= viskositas absolut=0.13071 Ns/m2
= 1000 kg/m3
Vs=g(s- )D2/18
= 9.81(2650-1000) (0.020 x 10-3)2/18x0.13071
= 2.75x 10-6m/s
Aulia Riswalida
21080115120037
CASE 3
a. Dari case 1
D= 0.020 mm= 0.020 x 10-3 m
= s= 2.650 kg/m3
= 1.002x103 N.s/m2
= 1000 kg/m3
Vs=g(s- )D2/18
= 9.81(2650-1000) (0.020 x 10-3)2/18x1.002x103
= 3.6 x 10-4m/s
Q= 20.000 m3/day
Design pre-sedimentation for circular:
V=Q/2rH
Aulia Riswalida
21080115120037
V=Q/2rH
b. Dari Case 2
D= 0.020 mm= 0.020 x 10-3 m
= s= 2.650 kg/m3
= viskositas absolut=0.13071 Ns/m2
= 1000 kg/m3
Vs=g(s- )D2/18
= 9.81(2650-1000) (0.020 x 10-3)2/18x0.13071
= 2.75x 10-6m/s
Design pre-sedimentation for circular:
V=Q/2rH
CASE 4
Aulia Riswalida
21080115120037
JAWAB:
dp= 0.2mm
= 2.65
= 0.13071 Ns/m2
Nre= D2 x n x /
1500=0.2 x n x 2.65/0.13071
n= 1500 x 0.13071/0.2 x 2.65
= 196.065/0.53
= 370 putaran
=1-(1+(n.V0/Q:A)
= 1-(1+(370 x 980.325)/200:3000)
CASE 5
Aulia Riswalida
21080115120037