Rev 4
COS 03/31/2010
SATIP No.
SATIP-N-001-02
PROJECT TITLE:
ITEM
NO.
1.0
PROJECT PHASE
APPROVED DATE
WBS/BI/JO/NO.
TASK / ACTIVITY
QUALITY
PROCEDURE
QUALITY
RECORD
DISCIPLINE:
31-Aug-11
MECHANICAL
CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR
REMARKS
SAUDI
ARAMCO
DOCUMENT REVIEW
1.1
SAIC-N-2012* SAIC-N-2012
RH
RH
1.2
SAIC-N-2002
SAIC-N-2002
RH
RH
1.3
SAIC-N-2013
SAIC-N-2013
RH
RH
2.1
SAIC-N-2004
SAIC-N-2004
2.2
SAIC-N-2005
SAIC-N-2005
3.1
Pre-Application/Installation of insulation
SAIC-N-2006
SAIC-N-2006
3.2
SAIC-N-2014
SAIC-N-2014
3.3
SAIC-N-2015
SAIC-N-2015
3.4
SAIC-N-2009
SAIC-N-2009
3.5
SAIC-N-2016
SAIC-N-2016
4.1
SAIC-N-2017
SAIC-N-2017
4.2
SATR-6133
SATR-6133
2.0
3.0
4.0
MATERIAL RECEIVING
INSTALLATION
PRE-COMMISSIONING
Page 1 of 2
2/14/2012 2:19 PM
Rev 4
COS 03/31/2010
SATIP No.
SATIP-N-001-02
PROJECT TITLE:
ITEM
NO.
1.0
APPROVED DATE
WBS/BI/JO/NO.
PROJECT PHASE
TASK / ACTIVITY
QUALITY
PROCEDURE
31-Aug-11
MECHANICAL
CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ASSIGNMENTS
QUALITY
RECORD
DISCIPLINE:
CNTRCTR
REMARKS
SAUDI
ARAMCO
DOCUMENT REVIEW
The first three incidents of each Inspection or testing activity listed as "W" require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust
the levels of Saudi Aramco participation based upon the Contractors performance.
Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
3
4
Witness:
QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
organization representative is not present.
Hold:
QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization
representative in attendance.
If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
At time of turnover, all fire proofing and rough insulation shall be complete. All equipment, piping, instruments, instruments leads, etc. requiring insulation for heat conservation or proper operation shall
be covered so that startup operations will not be delayed due to excessive heat loss. Insulation required for personnel protection shall also be completed.
LEGEND
H
Witness Inspection/Test
Surveillance
R
RH
I
Review of Documents
Review and Approval of Documents
100% Contractor Inspection
Page 2 of 2