INTERNATIONAL MINING CO. S.A.

GRUPO MINERO LA CHOJLLA


SECCION - PROYECTO

INFORME MEDICION NOVIEMBRE - 2016


"SECCION MINA"

1.- MEDICION LINEAL


NIVEL

VETA

Mineral

PARAJE

LABOR

-150
-150
-150

VETA - 7caN
VETA - 7ca N
VETA - 7ca N

Rec. Horizontal
CORRIDA VETA - 07caN
Rec. Vertical
CHIM. LARGA S/CRD-7
DESQUINCHE A CRD-8 ANTIG. Entrante

-150

VETA - 7ca N

CHIM. LARGA S/CRD-7

-120
-120

VETA- 4cc
VETA- 4cc

INTERMEDIA VETA 4cc (fondo) Des. Horizontal


Des. Inclinada
RAMPA VETA 4cc

N
Ctto

Rec. Vertical

MEDIDO

CONTRA

AVANCE

AREA

VOLUMEN

(m)

(m)

(m)

(m2)

(m3)

TMBH
Mineral

J. Carlos Cardenas Q.
J. Carlos Cardenas Q.
J. Carlos Cardenas Q.

15.10
7.50
3.25

2.30
0.00
0.00

12.80
7.50
3.25

4.07
1.22
3.38

52.10
9.12
10.97

146
26
29

7.70 m Tg. 43 pared Izq. Crd-7Med, 02 Dic. 2016 - Ore


7.50m Ceja Chim. larga Crd-7 Med, 02 Dic. 2016 - Ore
3.25m CejaPared Izq. Crd-7 Med, 02 Dic. 2016 - Ore

Macario Huanca

21.80

1.80

20.00

1.84

36.85

103

1.80m Ceja Chim. Larga o Techo


Med,
CRD-7
26 Oct. 2016 - Ore

Juan Carrizales M.
Juan Carrizales M.

11.60
11.00

8.00
3.70

3.60
7.30

1.13
1.28

4.06
9.31

11
26

122.40

341

CONTRATISTA

54.45

TOTAL

2.- RAJOS SHRINKAGE


NIVEL

VETA

2.8

P.E. Mineral

PARAJE

LABOR

N
Ctto

CONTRATISTA

CONTRA NUEVA

3.90m Ore Pass Rampa inter. Med, 01 Diciem. 2016 - Ore


Concluido
Med, 01 Diciem. 2016 - Ore

2.8

AREA
(m2)

ANCHO
(m)

FACTOR
INCLIN.

VOL.
(Total)

TMBH
Mineral

Obs.

-120

VETA- 4cc

Rajo 7- Longitudinal-Shrinkage Explotacin

Juan Carrizales M.

13.11

0.65

90

8.52

23.86

Med, 02 Diciembre 2016 - Ore

-150

VETA - 7caN

Rajo 1- Longitudinal-Shrinkage Explotacin

J. Carlos Cardenas Q.

33.68

0.70

90

23.58

66.01

Med, 02 Diciembre 2016 - Ore

-150

VETA - 8c N

Rajo 7- Longitudinal-Shrinkage Explotacin

Lus Quispe Coronel

109.71

0.76

90

83.38

233.46

TOTAL

83.38

233.46

3.- CONSTRUCCION DE MURO y/o PIRCA


NIVEL
-150

VETA
VETA - 7c N

PARAJE
CRD- v-7 NIV -150, PIRCA -1

Med, 30 Noviem. 2016 - Ore

2.6
LABOR
Rec. Horizontal

No.
Ctto.

CONTRATISTA
Juan Mamani Flores

LARGO

ANCHO

ALTO

VOL.

(m)

(m)

(m)

(Total)

2.30

0.52

1.60

1.91

Esteril/Caja

4.98

RESUMEN MOVIMIENTO DE CARGA EN


TONELADAS METRICAS

.
Ing. Waldo Paita
Vo. Bo. GENERENTE MINA CHOJLLA

Volumen

Mineral

Estril

Total O+W

206

635

33

669

.
Ing. Daro Ajomado I.
SECCION PROYECTO

Cc.Arch.

Pgina 1

Obs.

Obs.
Med, 30 Noviem. 2016 - Ore

Chojlla 03 Diciembre de 2016

INTERNATIONAL MINING CO. S.A.


GRUPO MINERO LA CHOJLLA
SECCION - PROYECTO

Cc.Gerencia Mina

INFORME MEDICION OCTUBRE - 2016


SECCION MINA - PROYECTO EKI

1.- MEDICION LINEAL


NIVEL
0

VETA

Mineral

PARAJE
CONTRAGALERIA KANTU..

LABOR

N
Ctto

XC - KANT.

CONTRATISTA
Wilmer Huanca M.

CONTRA
(m)

AVANCE
(m)

AREA
(m2)

VOLUMEN
(m3)

TMBH
Mineral

56.50

20.00

36.50

6.29

229.75

551

36.50

TOTAL

229.75

551

2.- RAJOS SHRINKAGE


NIVEL

VETA

2.4

MEDIDO
(m)

P.E. Mineral

PARAJE

LABOR

N
Ctto

CONTRATISTA

AREA
(m2)

ANCHO
(m)

FACTOR
INCLIN.

VOL.
(Total)

TMBH
Mineral

TOTAL

0.00

0.00

CONTRA NUEVA
13.60m Plc- 00-007

Obs.
Med, 01 Dic. 2016 - Waste

2.8
Obs.

RESUMEN MOVIMIENTO DE CARGA EN


TONELADAS METRICAS
Volumen
Mineral
Estril
Total O+W
230
0
551
551

Chojlla 03 Diciembre de 2016

.
Ing. Waldo Paita
Vo. Bo. GENERENTE MINA CHOJLLA

.
Ing. Daro Ajomado I.
SECCION PROYECTO

Cc.Arch.
Cc.Gerencia Mina

Pgina 2