2013 LUZON SITUATION

AND
2014-2020 POWER OUTLOOK

LUZON SUPPLY-DEMAND OUTLOOK 2014-2020


2014

2015

Aug: 18 MW Northwind P3
Oct: 135 Mw Putting Bato U1
Nov:150 MW South Luzon Coal U1
20 MW SJCI Biomass

14000

Feb: 87 MW Burgos Wind


150 MW South Luzon Coal U2
Mar : 18 MW IBEC Biomass
81 MW Caparispisan
Jun: 18 MW CJ Global Biomass
200 MW EWC U1
Jul : 10.8 MW Green Biomass
67 MW Pililia Wind
Sep: 100 MW Avion Natgas
Nov: 135 MW Puting Bato U2

13000
12000

2017

2016

June: 200 MW EWC U3

Mar : 82 MW Anda Power


June: 200 MW EWC U2

11000
10000
9000
8000

7000

Available Capacity

Committed

Peak Demand

Regulating Reserve

Nov 2020

Sep 2020

Jul 2020

May 2020

Mar 2020

Jan 2020

Nov 2019

Sep 2019

Jul 2019

May 2019

Mar 2019

Jan 2019

Nov 2018

Sep 2018

Jul 2018

May 2018

Mar 2018

Jan 2018

Nov 2017

Sep 2017

Jul 2017

May 2017

Mar 2017

Jan 2017

Nov 2016

Sep 2016

Jul 2016

May 2016

Mar 2016

Jan 2016

Nov 2015

Sep 2015

Jul 2015

May 2015

Mar 2015

Jan 2015

Nov 2014

Sep 2014

Jul 2014

May 2014

Mar 2014

Jan 2014

6000

Contingency & Dispatchable Reserve

Notes
a. Required Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement
b. 4.2 % peak demand growth rate resulted from observed 0.6 elasticity ratio of demand for electric power with national
economic growth applied to 7 percent GDP growth rate (GR) target for 2014-2015.
c. 4.8 % peak demand growth rate resulted from observed 0.6 elasticity ratio of demand for electric power with national
economic growth applied to 8 percent GDP growth rate (GR) target for 2016-2020.
d. Assumed 5.49 percent average forced outage of the total available capacity

2013 LUZON DAILY SUPPLY-DEMAND SITUATION

2013 Max Avail Cap =


10,078 MW (23 Dec)

Summer 2013

12,000

2013 Max Demand =


8,305 MW (08 May)

SUAL 1 on PMS (02 Aug-01 Sep)


SUAL 2 on PMS (14 Sep-21 Oct)
PAGBILAO 2on PMS (31 Aug-26
Oct)

10,000

Malampaya Turnaround
(11 Nov-10 Dec 2013)
PAGBILAO 1 and 2,
GNPower 2 , MASINLOC
1 on boiler tube leak

8,000

6,000

08 May 2013
Luzon Blackout
4,000

ILIJAN A on biodiesel operation (11 Nov-05 Dec)


ILIJAN B (08 Nov-11 DEc, SAN LORENZO 1 (01 Nov-05 Dec)
on maintenance; SAN LORENZO 2 on Forced Outage (28 May-09 Dec)

2013 Min Avail Cap =


6,110 MW (08 May)

2013 Min Demand =


4,800 MW (01 Jan)
2,000

W1
W2
W3
W4
W5
W6
W7
W8
W9
W10
W11
W12
W13
W14
W15
W16
W17
W18
W19
W20
W21
W22
W23
W24
W25
W26
W27
W28
W29
W30
W31
W32
W33
W34
W35
W36
W37
W38
W39
W40
W41
W42
W43
W44
W45
W46
W47
W48
W49
W50
W51
W52

Jan

Feb

Mar

Available capacity

Apr

May

Peak Demand

Source: NGCP Daily Operations Report

Jun

Jul

Regulating Reserve

Aug

Sep

Oct

Nov

Dec

Contingency & Dispatchable Reserve

2014 LUZON DAILY SUPPLY-DEMAND SITUATION


PROJECTED

ACTUAL

12000

2014 Actual Peak Demand =


8,554 MW (8 May)
10000

8000

6000
2014 Projected Peak Demand =
8,654 MW (22 May)

4000

Holy Week

2000

0
W1 W2

W3

W4

January

W5

W6

W7

W8

W9

W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23 W24 W25 W26 W27

February

Available capacity

March

Peak Demand

Note : Actual Data, 1 January to 9 May 2014

April

Regulating Reserve

May

June

Contingency & Dispatchable Reserve

COMMITTED POWER PROJECTS


Luzon Grid Committed Power Projects, 1,724.65 MW
Type

COAL

COAL

WIND

BIOMASS

WIND

WIND

WIND

BIOMASS

NATGAS

Name of the Project

Project Proponent

Mother/ JV Company

Location

Southwest Luzon
2 X 150 MW SLPGC
Power Generation
DMCI Power
Brgy. San Rafael,
Coal-Fired Power Plant
Corporation (Project
Corporation
Calaca, Batangas
Phase I
Company)
135 MW Puting Bato South Luzon Thermal
Trans Asia Oil and
Brgy. Puting Bato
Coal Fired Power Plant
Energy Corp.
Energy Development
West, Calaca,
Phase I
(SLTEC)
Corporation (TAOil)
Batangas
Phase 3:
NorthWind Power
NorthWind Power
Bangui Bay Wind
Development
Development
Bangui, Ilocos Norte
Power Project
Corporation
Corporation
24 MW SJCiPower
Rice Husk-Fired
San Jose City I Power San Jose City I Power Brgy. Tulat, San Jose,
Biomass power Plant
Corporation
Corporation
Nueva Ecija
Project
Phase 1:
EDC Burgos Wind
Energy Development
Nagsurot-Saoit,
Burgos Wind Power
Power Corporation
Corporation (EDC)
Burgos, Ilocos Norte
Project
Phase 1:
Alternergy Wind One
Brgy. Halayhayin,
Pililla Wind Power
Alternergy
Corporation
Pililla, Rizal
Project
Brgy. Caparispisan,
Caparispisan Wind Northern Luzon UPC
UPC Asia Corporation
Pagudpud, Ilocos
Energy Project
Asia Corporation
Norte
Isabela Biomass
20 MW IBEC Biomass
Isabela Biomass Energy
Energy Corporation
Isabela
Power Plant
Corporation (IBEC)
(IBEC)
Pagbilao 600 MW
Brgy. Ibabang Polo,
Energy World
Energy World
Combined Cycle Gas
Grande Island,
Corporation
Corporation
Fired Power Plant
Pagbilao, Quezon

Rated
Project Cost
Capacity
(Php Billion)
(MW)

Commercial
Operation

300

45.4

Unit I Nov 2014;


Unit II Feb 2015

135

12.9

Oct 2014

18

1.5

Aug 2014

20.00

1.2

Nov 2014
(Subject to FIT)

87

12.8

Feb 2015

67.5

7.7

Jul 2015

81

11.2

Mar 2015

18

1.9

Mar 2015
(Subject to FIT)

600

12.9

Jun 2015 U1
Jun 2016 U2
Jun 2017 U3

COMMITTED POWER PROJECTS


Luzon Grid Committed Power Projects, 1,724.65 MW
Type

Name of the Project Project Proponent Mother/ JV Company

BIOMASS

20 MW Waste-toEnergy Project using


Thermal Gasifier
Conversion

BIOMASS

12 MW Biomass
Power Plant Project

NATGAS

COAL
BIOMASS
BIOMASS

CJ Global Green
CJ Global Green Energy
Energy Philippine
Philippine Corp.
Corp.
Green Innovations for
Green Innovations for
Tomorrow
Tomorrow Corporation
Corporation

Prime Meridian
PowerGen
100 MW San Gabriel Corporation (Project
First Gen Power
Avion Project
Company)
Corporation
First Gen
Corporation
135 MW Puting Bato South Luzon Thermal Trans Asia Oil and
Coal Fired Power
Energy Corp.
Energy Development
Plant Phase II
(SLTEC)
Corporation (TAOil)
3.5 MW Bicol Biomass
Bicol Biomass
Bicol Biomass Energy
Energy Corporation Energy Corporation
Corporation
12 MW MultiCagayan Biomass
Cagayan Biomass
Feedstock Biomass
Energy Corporation
Energy Corporation
Power Plant Project

Location

Rated
Project Cost
Capacity
(Php Billion)
(MW)

Target
Commissioning

Camarines Sur

18

Jun 2015

Nueva Ecija

10.80

Jul 2015

Barangay Bolbok,
Batangas

100

10.0

Sep 2015

Brgy. Puting Bato


West, Calaca,
Batangas

135

9.6

Nov 2015

Camarines Sur

3.15

Dec 2015

Cagayan

10.80

Dec 2015
Dec 2015

HYDRO

Inabasan

Ormin Power, Inc.

Ormin Power, Inc.

San Teodoro,
Oriental Mindoro

10.0

COAL

Anda Power
Corporation's 82 MW
Circulating Fluidized
Bed Coal Fired Power
Plant

Anda Power
Corporation

Anda Power
Corporation

Brgy. Bundagul,
Mabalacat,
Pampanga

82

8.6

Mar 2016

COMMITTED POWER PROJECTS


Luzon Grid Committed Power Projects, 1,724.65 MW
Type

Name of the Project Project Proponent

HYDRO

Catuiran

HYDRO

Linao-Cawayan
(Upper Cascade)

Mother/ JV Company

Sta. Clara Power


Sta. Clara Power Corp.
Corp.
Oriental Mindoro Oriental Mindoro Electric
Electric Cooperative,
Cooperative, Inc.
Inc. (ORMECO)
(ORMECO)
TOTAL

Location

Rated
Project Cost
Capacity
(Php Billion)
(MW)

Naujan, Oriental
Mindoro

8.0

Baco, Oriental
Mindoro

2.1

1,724.65

Target
Commissioning
Mar 2016

0.3

Mar 2016

INDICATIVE POWER PROJECTS


Luzon Grid Indicative Power Projects, 10,185.20 MW
Project Proponent

Mother/ JV Company

300 MW Limay Power Plant


Project Phase I
(2x150MW)

SMC Consolidated Power


Corporation

SMC Consolidated Power


Corporation

Brgy. Lamao, Limay, Bataan

300.00

Unit 1 - 150 MW Feb. 2016


Unit 2 - 150 MW July 2016

2 X 20 MW FDC Camarines
CFB Coal Power Plant

FDC Utilities, Inc.

FDC Utilities, Inc.

Camarines Sur

40.00

Mar 2016

MERALCO MGEN Power


Corporation/ Aboitiz Power
Corporation/ Taiwan
Cogeneration Corporation

Sitio Naglatore, Cawag,


Subic Bay Freeport Zone

600.00

Unit I - Oct 2016


Unit II - Dec 2016

Brgy. San Rafael, Calaca,


Batangas

300.00

Unit I - 2016
Unit II - 2016

2 X 300 MW Coal-Fired Power Redondo Peninsula Energy,


Plant
Inc.

Location

Rated Capacity
Target
(MW)
Commissioning

Name of the Project

2 X 150 MW SLPGC CoalFired Power Plant Phase II

Southwest Luzon Power


Generation Corporation
(Project Company)

DMCI Power Corporation

2 X 300 MW Masinloc
Expansion

AES Masinloc Power


Partners Co., Inc.

AES Philippines Power Partners


Co., LTD.

Zambales

600.00

Unit 3 (300 MW) Oct 2017


Unit 4 (300 MW) Oct 2017

Quezon Power Expansion


Project

Quezon Power Phils.

SMC Consolidated Power


Corporation

Mauban, Quezon

500.00

Jul 2017

300 MW Limay Power Plant


Project Phase II
(2x150MW)

SMC Consolidated Power


Corporation

SMC Consolidated Power


Corporation

Brgy. Lamao, Limay, Bataan

300.00

Unit 1 - 150 MW Jan 2017


Unit 2 - 150 MW Jul 2017

Pagbilao Power Station,


Nrgy. Ibabang Polo,
Pagbilao, Quezon

420.00

Jan 2018

1 x 420 MW Pagbilao CoalPagbilao Energy Corporation TeaM Energy / Aboitiz Power


Fired Thermal Power Plant
2 X 600 MW Mariveles
Expansion Project
300 MW Limay Power Plant
Project Phase III
1x300MW)

GNPower Mariveles Coal


Plant Ltd. Co.

GNPower Ltd. Co.

Mariveles, Bataan

1,200.00

2018

SMC Consolidated Power


Corporation

SMC Consolidated Power


Corporation

Brgy. Lamao, Limay, Bataan

300.00

2019/2020

TOTAL COAL

4,560.00

INDICATIVE POWER PROJECTS


Luzon Grid Indicative Power Projects, 10,185.20 MW
Name of the Project
Aero Derivative Combined
Cycle Power Plant
San Gabriel Power Plant
2 x 1,200 MW Combined
Cycle Gas Turbine Power
Plant Project

Project Proponent

Calamba Aero Power


MERALCO MGEN Power
Corporation
Corporation
TOTAL OIL-BASED
First Gas Power Corp.
First Gen Power Corporation
Atlantic, Gulf and Pacific
Company of Manila, Inc

415 MW San Isidro Combined Trans Asia Oil and Energy


Cycle Gas Turbine Plant
Development Corporation
Project
(TAOil)

LNG-Fired Combined Cycle


Power Plant * Onshore
Regasification and Storage
Terminal
Tanawon Geothermal Project
Rangas Geothermal Project

Kayabon Geothermal Project

Mother/ JV Company

Meralco PowerGen
Corporation and Chubu
Electric Power

Location

Rated Capacity
Target
(MW)
Commissioning

Calamba, Laguna

150.00

TBA

San Gabriel, Batangas

150.00
450.00

Dec 2015

AG&P

Limay,
Bataan
(PNOC-AFC Industrial
Estate)

2,400.00

Unit 1 - Mar 2017


Unit II - Mar 2018

Trans Asia Oil and Energy


Development Corporation
(TAOil)

Pilipinas Shell Petroleum


Co.'s Tabangao Refinery,
Brgy. San Isidro and
Tabangao-Ambulong,
Batangas City

415.00

Sept 2017

MERALCO MGEN Power


Corporation

Atimonan, Quezon

1,750.00

2018-2019

TOTAL NATGAS
Energy Development
Energy Development
Corporation (EDC)
Corporation (EDC)
Energy Development
Energy Development
Corporation (EDC)
Corporation (EDC)
Energy Development
Energy Development
Corporation (EDC)
Corporation (EDC)
TOTAL GEOTHERMAL

5,015.00
Guinlajon, Sorsogon

40.00

Dec 2018

Bacon District, Sorsogon

40.00

Jun 2019

Manito, Albay

40.00

Dec 2019

120.00

INDICATIVE POWER PROJECTS


Luzon Grid Indicative Power Projects, 10,185.20 MW
Name of the Project

Ibulao Hydroelectric Power


Project
Dupinga Hydroelectric Power
Project
Main Aklan
Tinoc 2
Tinoc 3
Pinacanauan
Tinoc 1
Tinoc 4
Currimao Solar Photovoltaic
Power Project
Macabud Solar Photovoltaic
Power Project
Phase 2:
Burgos Wind Power Project
Balaoi Wind Power Project
Phase 2:
Mabitac Wind Power Project
Phase 1:
Pasuquin East Wind Power
Project

Project Proponent

Mother/ JV Company

Location

Rated Capacity
(MW)

Target
Commissioning

Hydrocore, Inc.

Hydrocore, Inc.

Lagawe, Ifugao

4.50

May 2015

Gabaldon, Nueva Ecija

3.00

Oct 2015

Libacao, Albay

15.00

Jul 2016

Tinoc, Ifugao

11.00

Dec 2016

Tinoc, Ifugao

5.00

Jun 2017

Peablanca, Cagayan

6.00

Jul 2017

Tinoc, Ifugao

4.10

Apr 2018

Tinoc, Ifugao

5.00

Apr 2018

Constellation Energy
Exelon Corporation
Corporation
Sunwest Water & Electric Co., Sunwest Water & Electric Co., Inc.
Inc. (SUWECO)
(SUWECO)
Philnew Hydro Power
Philnew Hydro Power Corporation
Corporation
Philnew Hydro Power
Philnew Hydro Power Corporation
Corporation
Sunwest Water & Electric Co., Sunwest Water & Electric Co., Inc.
Inc.
(SUWECO)
Quadriver Energy Corp.
Quadriver Energy Corp.
Philnew Hydro Power
Philnew Hydro Power Corporation
Corporation
TOTAL HYDRO
Mirae Asia Energy Corporation

Mirae Asia Energy Corporation

53.60
Currimao, Ilocos Norte

ATN Philippines Solar Energy


ATN Philippines Solar Energy
Brgy. Macabud, Rodriguez,
Group, Inc.
Group, Inc.
Rizal
TOTAL SOLAR
EDC Burgos Wind Power
Energy Development Corporation Nagsurot-Saoit, Burgos, Ilocos
Corporation
(EDC)
Norte
Northern Luzon UPC Asia
Brgy. Balaoi, Pagudpud, Ilocos
UPC Asia Corporation
Corporation
Norte
Alternergy Sembrano Wind
Alternergy
Mt. Sembrano, Mabitac, Laguna
Corporation
Energy Logics Philippines, Inc.

Delgado Group of Companies

Pasuquin, Ilocos Norte

TOTAL WIND
10 MW Serin CorporationRice
Husk-Fired Power Plant

Serin Corporation

20.00

Aug 2014

30.00

Feb 2016

50.00
63.00

Sep 2014

45.00

Aug 2015

72.00

Apr 2017

48.00

Jan 2017

228.00
Tarlac

8.60

TOTAL BIOMASS

8.60

TOTAL

10,185.20

TBA

10