Вы находитесь на странице: 1из 66
CIVIL & STRUCTURAL WORK LABOUR CONTRACT roposed Residential Building known as “JP North- Celeste" on Plot Bearing S.No. 110/ 1PT, 4PT 224] 1APT ,1BPT, 26/1, 26/8, 26/9 at Village - Ghodbunder, DIST: Thane Client: M/s. JP Infra Mumbai Pvt. Ltd.. Muncipat Architect:.Mis Anish & Associates. Design Architect:- M/s Reza Kabul ‘Structural Consuttant: JW Consultants. PMC Consultant: M/s Nexus Project Solutions Private Limited, Ref. Nox! PA7SiPAWONCIMMO RO, Clint Mis. 4P intea {Mum CIVIL CONTRACT Propated Rescestal Sudha Kian 25 IP Nosh Caos ae pot 2015 | (LabourBasis) Project GnPiet dearng S No SO/4PT HP? 204 APY SPT? 1 c _ 2511, 268 28193 Vilage = Ghoetincer, BIST Thar To, Mis G ana K Construction, Flat no- G4, Plot n0-27128, ‘Siddhivinayak SRA Building Road No-2, Near Sidchivinayak Temple, Pushpa park, Malad-E, Mumbsai-400097, ‘Tels022 28817436 Kind Attn: Shri. Ghanshyam Patel (Mobile ~ +91 9621382167 / 9892442066) ‘Sub;- Chi & Structurel Work Labour Conte sed Residential Bulfing known as “JP North Geleste" on Plat Beasng S, 410/ 4PT., 4PT 224 /4APT 1 1, 28/8, 26/9 at Vilage - Ghodbunder. DIST: TI We, Ws. JP Infra (Mumbai) Pvt Ltd, having office at 4th Floor, Vira Towers, Western Express Highway, Near WEH Metro Station, Andher (East), Mumbai - 400 093, we are pleased to place this Work-OrderiContracvAgreement for pproviding services. ‘or Civil & Structural works wth labour only cn Sq ft basis fo complete the entire Civwerk forthe ead project. ‘With issuing of this ContractWork-Oréer/Agraement, at previous written and verbal communications stands canceled. Terms and Conditions mentioned in this Contract/or-OrdeniAgreement aro final and binding to all concerned partes. Inthis ContractWork-OrcerfAgreement “Contractor” shall means “Wis G & K Construction, “Cilent / Employer” shall mean Mis. JP Infra (Mumbai) Pvt. Ltd”, PMC shall mean ‘M/s Nexus Project Solutions Pvt Ltg” and word used as “Contract / Work Order / Agreement” means “Civil Contract (NL Basis)" contract cocumentsissed to himisigned wit him, 2.) Cention’ Pavabje Area in Saft. | [On'basts St CIVIC CowTRACT (MBL. Basis) “Annexure A” calculations) [a] Je Feo? Sait Foor 45040 Sat BY | to T&F to 13" Floor =| 10,585 Saft Each Floor= <_| 189,020 Sat @__) 8 Floor ‘ 46,200 Saft )__| Stair-oaée Heat:Room + Lik Machine Room + UGTank | 3020 Sat | Total Payable Area 2.33,280Sait ‘The contractor's scope of work includes ail below mentioned works (with labour only, in scope of contractor} 41) Leveling course as needed on excavated base (excavation for foundationsfpila-caps and UG Tank wil be dane by lent fee (of cost to civi-contractor but excavation for compound.wall, compound-gates, trenches, SWD, RWH-Tank to be cone by Contractor athis own cost~ 8) Contractor to closely supervise excavation agency and get the desired levels dane as required. Contractorto do the setting-out of building wit total sition-survey at hls own cost, before excavation, He is required to closely supervise ‘excavation agency andi get the desired foundation levels excavated as requled. b) Once excavetion agency is given work completion certiicale by PIMC and contractor accepted the site concition for hie working (forthe client's scope of excavation), in-case if any further fine tuning in lavelng is required then Contractor wil get it done corrected, by doing extra excavation or by providing Plum concrete of P.C.C. (1:35) 28, diroctod by E-n-C of PMC, at his ovm cost. As contractor made a fault in judging the extent of excavation, no extra cost or ciim will be paid to contractor on this case, ©} General 150mm PCC required for foundation wil be done by contractor at his own cost. I client decides not to ‘excavate futher and duo to such decision if any extra POC/Plum-concrele is required to be done (and due to ary ‘eda orcinary un-even soil strata), willbe paid to contractor as anextra-tem, 4) If any soil-collapse happens due to loose scil stata and soil gots spread on excavated aree, collapsed soll to be ‘emoved by contractor at extra cost approved by PMC/Cient. Any soletention system done by contractor to prevent Ssol-coliapse (as instructed by structural consulant) wll leo be paid extra as approved byPMCiClient 2) Soling & P.C.C. for foundations, rats & ple-caps. Plum-concrele filing in ff-pt will be in scope of contractor. This pkum= concrete will not be paid extra to contractor. ‘Sights and Seale Meus PSPL” ‘Sat an Sea Ce ‘Siptaire ad Seal Corinto 3) a 5) © D 9 9 410) Dy 2) 13) 14) 15) 16) PATSPAWONCVIAOHRO [Gtient Wis, JP infra (Mumbai) Pr. 8 OWILCONTRACT | Frojeed Resa arg ino as“ iin Cale fee Taree Son dle 208 Vinge Grodin, BIS. Toane Dewatering during construction worss at any level, or any duration & for al leads in excavated pits and irteguiar packets, Antitermite troatment, a plinth level, 2 costs of Black-Jepan ol treatment must be done on rafUfoundationple-caps sides ‘top, below-ground columns and pinth-beams for conerete protection, Water-procfing works are net in scope of contractr. ‘Murrum Filing for plinth wil be done by client free of cost. The leveling, watering and compaction of plinth with “murum supplied by client” will be done by contractor a his own cost. All works requited for fillng and leveling wll be done by ‘contractor at his own cost AI RC.C. works for RafvFoundations/Pie-caps + StiGround Floor + 1H Residential Floor to Terrace Floor stabs/oeams + Lits + iftPts + Staicases + Terraces + RCC Parapet + Flower beds + chajas + Al Elevation Projections + Refuse area + Servce-area (i any) * Overhead water tanks (including Fre-Fighting tank as per fre NOG) + Under-Ground water tanks (cluding Fire-Fiating tank as per fire NOC) + STP + Entrance-cenopy + Entrance-gate-canopy + Stom-water-crain + Meter-ccom + Society-Offie + Rain-water-harvesting Tenks + Pump-com + Sub-station + Corie and the Ike. ing chemicals and rtandina super-D roved make as mentioned in attached work-specfications) mus be used fo concrete makina at contractor's ovn cost, Structural ensinesssopraved polymers must be used for suaces where honey-comb avises OR for all structural repairs, Internal and External Light-wt. Block work (AAC block masonry) as per drawings. 100mm thick RCC patli with 2.8mm bars. to be provided at bottom of walls and at every 4.2m height as mentioned in annexures. All external walls wil be 450mm thick Tolt was must be 160mm thick Wall whore electrical DB tobe fred, must be 160mm thick. All other intornal walls wil be 100men thick. Partition wall betwoon adjacent officesfiate must be 150mm thick. Sand being used for Block ‘work must be properly screened river-sand. Ready-made mortar (of Utretech, Magicrete or 26 approved by PMC) can be Used for block-wotk, in place of site-mixed coment-sand mortar without any extra coet toctient. ‘pose sand ONLY must be used fr internal & external plaster werk both Extemal plaster wil be double coat plaster win waterproofing compound (of approved make as mentioned in attached work- specications) must be used in-2” coe. Wake, must be, approved in wnt -C belore use. Hack-ad chemical rust be used at cos of contactor. tacts where hacking Get sipped {niemat & External both plaster-norks: must be done, as'Per sgecations mentioned in attached annexes. if ctents Fequited to do Gypsum in cena du to late done hacking, cast of Gypsum to be bome by contractor. Soling & P.C.C. up to compound-wal or paving around bulking atGr. Flor area & tit area, Compound-walls + Compound-Gates * Watchman-cabin are in scope of contractor. Breaking of all four side existing ‘compound:wall & throwing away its debris is also scope of contractor. Construction of temporary structures like Cement storage Godown, Stores for storing tools and tackles, Site office for Contractor+Clont+PMC with Toilet facity and separate bathtllet facile for workere/staff wil be done by contractor at his ‘04m cost Client to provide connection ftom tat chamber inside bulding to municipal drein only. Cont to provide olecric connection at one point ie. only upto meter placing. Balanco electrical & plumbing works do be done by contractor at his ‘1 cost, Contactor is expected to make soptictank & soak pit for above infrastructure, at his own cost, in-sase sewage line is nct availabe at sto. Contactor to maintain regular clearing of septictank & soak:pit, as and when required, at his ‘own cost In case temporary structures constructed 2s mentioned in Sub Para 12) above are requirad to be relocated or removed ‘completely as per cient requirements, Contractor shal dismantle complately any or all temporary structures and reconstruct at diferent locations as directed by E-in-C of PMC. Contractors expected to construct such iructure twice for free of cost ‘but wile paid extra (as par mutually agreed rates) fr relocating 3° or more time only | the space constraints is due to ste-conditions and then if shifing & reshifing of contractors officelgodown/stores/olets/eieciic-meters etc required to be done by contractor, it wil be done by contractor at his own cost. Such shifting & e-shifing isnot limited to any no. ‘Due to spece constrains if material shifting & re-shiting is required to be done by contractor, it wl be done by contractor at his cw cost. Such shifting & re-shiting is not tiled to any no, Any pre-cast work for tolletducts, if required, also comes into scope of contractor. All castin-stu, curved oF round projections (whether slabs / beams J columns) and Circularincined columns, must be casted using M.S. farmes ONLY. ‘Sigal Seal oF Weaus PSEC ‘Snsture and SeaLeF Cleat ‘Signature and Seal of Coissior

Вам также может понравиться