Cleaning Record per week

Monday
Date

data not collected yet


Shift

detail activities

done By

detail activities

done By

detail activities

done By

detail activities

done By

9/5/2016

Tuesday
Date

data not collected yet


Shift

10/5/2016

Wednesday
Date

data not collected yet


Shift

11/5/2016

Thursday
Date

data not collected yet


Shift

12/5/2016

Friday
Date

Shift
GS
Shift1

13/05/2016
Shift 2

detail activities
Cleanning dust & slag spilage at area below Slag conveyor-1
Spider web surrounding AC MCC (ground floor)
Cleanning coal spillage surrounding boiler operating floor
ex pocking coal duct & dust surrounding furnace back side
IDF#2, motor, cover bearing & gearbox

done By
GS crew
Groud C
Group D

Shift 2
Shift 3

Saturday
Date

Shift
GS
Shift 1

14/05/2016
Shift 2

Shift 3

Sunday
Date

Shift

Shift 1
15/05/2016
Shift 2
Shift 3

IDF#1, bearing cover


Cleanning dust area clean drain tank
Cleanning coal ex cleanning ducting coal feeder

detail activities
Cleanning Pedestal bearing, base frame & foundation IDF, PAF,
Dust & slag spillage below slag BC#1 & spider web at MCC wall
Cleanning coal spillage surrounding boiler operating floor
ex pocking coal feeder ducting
Cleanning padestal bearing, base frame & foundation IDF
Cleanning coal spillage surrounding boiler operating floor
ex pocking coal feeder ducting
Cleanning padestal bearing, base frame & foundation PAF-1
Cleanning dust over down commer distribution pipe header
Cleanning coal ex cleanning ducting coal feeder

detail activities

Cleanning dust at motor and gear box cover, MRF#1


Cleanning coal spillage surrounding boiler operating floor
ex pocking coal feeder ducting
Cleanning coal spillage surrounding boiler operating floor
ex pocking coal feeder ducting
Cleanning coal spillage surrounding boiler operating floor
ex pocking coal feeder ducting

Group D
Group A

done By
GS crew
Group C

Groud D

Group A

done By

Group B
Group C
Group D

Man power

Duration

Total Duration

Man power

Duration

Total Duration

Man power

Duration

Total Duration

Man power

Duration

Total Duration

Man power Duration Total Duration


2 person
8 hours
16
1 person

3 hours

3 person

45 minutes

2.5

2 Person
2 Person

30 minutes
2 Hours
Total :

1
4
26.5

Man power Duration Total Duration


3 person
7 hours
21

1 person
2 person
1
1
1
3

person
person
person
person

Man power

2 hours
1 hours
2
2
2
0.5

2
2

Hours
Hours
Hours
Hours

2
2
2
1.5

Total:

32.5

Duration

Total Duration

2
3 person

0.5 Hours
1.5 hours

1
4.5

3 person

1.5 hours

4.5

3 person

1.5 Hours

4.5

Total:

14.5

total week 19:

73.5

Cleaning Record per week


Monday
Date

Shift
GS
Shift 1

5/16/2016

Tuesday
Date

Shift

Shift 1
Shift 2

Shift 3

Wednesday
Date

Shift
GS
Shift 1

5/18/2016

Shift 2
Shift 3

Thursday
Date

Shift
GS
Shift 1

5/19/2016
Shift 2
Shift 3

Friday
Date

Cleanning coal spillage surrounding boiler operating floor ex pocking coal


duct

Cleaning SAFan#1&2 motor , bearing cover


Cleanning coal spillage surrounding boiler operating floor
Shift 2
ex pocking coal feeder ducting
Cleanning coal spillage surrounding boiler operating floor
SHIFT 3
ex pocking coal feeder ducting

GS

5/17/2016

detail activities
Cleanning hard dirt suurounding padestal bearing PAF-1 and
cleanning slag spillage under slag belt conveyor-1

Shift

detail activities
Cleanning under slag conveyor no 1 & area slag cooler
Cleaning ID fan 1&2 ( opr + helper )
Cleanning coal ex pockig ducting coal feeder with helper
Cleaning PAF & SAF area (operator)
Cleanning coal ex pockig ducting coal feeder with helper
Cleaning hard dirt at boiler operating floor below sand screw
no.1: over Feed water line inlet eco, 11MV07 & near by beams
Cleanning dust on cable trey rear furnace & burner area
Cleanning coal spillage surrounding boiler operating floor
ex pocking coal feeder ducting

detail activities
Cleanning under slag conveyor no 1 & area slag cooler
Cleanning motor & Frame SA Fan 1 & 2
Cleaning coal ex pocking ducting coal feeder.
Cleaning area PAF & SAF
Cleanning coal ex pockig ducting coal feeder with helper
Cleanning coal spillage surrounding boiler operating floor
ex pocking coal feeder ducting
Cleanning slag spillage that remains on the stair way

detail activities
cleaning spilage Slag at boiler ground floor; maintain cleanning Fans
Cleaning slag spilage at Slag BC#2 stair way greeting
Cleaning motor, pump CDT #1&2
Cleanning coal ex pockig ducting coal feeder with helper
Cleaning coal ex pocking ducting coal feeder.
Cleanning PA no1 & slag cooler no1 with opr & helper
Cleanning coal spillage surrounding boiler operating floor
ex pocking coal feeder ducting

detail activities

GS
Shift 1
5/20/2016
Shift 2
Shift 3

Saturday
Date

Shift
GS

Shift 1
5/21/2016
shift 2
Shift 3

Sunday
Date

Shift

Shift 1
5/22/2016
shift 2
Shift 3

cleaning spilage Slag at stair way greeting Slag-BC#2


Cleaning hard dirt at stair way Slag-BC#1 & ground floor
Cleaning motor, pump CDT #1&2
Cleanning coal ex pockig ducting coal feeder with helper
Cleanning ex coal ducting coal feeder
Cleanning ID fan 1 , 2 & Pa Fan 1,2
Cleanning coal ex pockig ducting coal feeder & beside furnace

detail activities
Cleaning boiler ground floor: slag spillage, rice husk staging
maintain cleanning boiler operating floor (coal spilage after pocking)
Cleaning sand screen area
Cleaning Clean Drain Tank top Box
Maintain cleaning bearing Fans (IDF, PAF & SAF)
MRFan , PAFan, CDT both units cleaning
Sand Screen area cleaning
Cleanning coal ex pockig ducting coal feeder with helper
Cleanning coal ex pockig ducting coal feeder & beside furnace
Cleanning motor PA Fan 1&2

detail activities

maintain cleanning boiler operating floor :coal spilage after pocking,


and oil spilage ex hiydrolic fluid ex HMC hose pipe that bursted
maintain cleanning boiler operating floor :coal spilage after pocking,
and oil spilage ex hiydrolic fluid ex HMC hose pipe that bursted
maintain cleaning bearing Fans (IDF, PAF & SAF) & ground floor
Cleaning coal ex pocking ducting coal feeder.

done By Man power Duration Total Duration


2 persons
8 hours
16
GS crew
Group B

3 persons

1.5 hours

4.5

1 person

1 hour

Group C

3 person

1.5 hours

4.5

Group D

3 person

1.5 hours

4.5
30.5

done By Man power Duration Total Duration


1 Person
8 hours
8
GS crew
Group A
Group B

Group C

2
3
1
3

Person
Person
Person
Person

hour
hour
hour
hour

2
6
1
4.5

2 persons
1 person

1 hour
1 hour

2
1

3 persons

1.5 hours
Total:

4.5
29

done By Man power


1 Person
GS crew
Group A
Group B
Group C

Duration Total Duration


8 hours
8

2 Person
3 Person
1 person
3 person

4 hours
1 hours
3 hours
1.5 hour

8
3
3
4.5

3 persons
1 person

1 hour
1 hour
Total:

3
1
30.5

done By Man power


1
GS crew
3
1
Group D
3
3
Group A
2
Group B

1
2
1
1.5

done By Man power

Duration
8
3
1 hours
1.5 hours
1 hours
1 hours

Total Duration
8
9
1
4.5
3
2

1.5

4.5

Total:

32

Duration

Total Duration

GS CREW
Group D
Group A
Group B

3persons
1person
1persons
3persons
3persons
2persons

2.5 hours
8 hours
1 hour
1.5 hour
1 hour
1 hour

7.5
8
1
4.5
3
2

3 persons

1.5 hours

4.5

Total:

30.5

done By Man power Duration Total Duration


8 hrs
8
1
GS crew
2
1
1
1
1
1
2
3
2

Group C

Group D
Group A

done By Man power

Group C
Group D
Group A

1.5 hrs
4 hrs
1 hr
1 hr
1
1
1.5
1
1.5
Total:
Duration

3
4
1
1
1
1
3
3
3
28
Total Duration

4 persons

1 hour

3 persons

1 hour

1 person
3 person

1 hour
1 hour

1
3

Total:

11

total week 20:

40.5

Cleaning Record per week


Monday
Date

Shift
GS
Shift 1

23 Mei 2016
Shift 2
Shift 3

Tuesday
Date

Shift
GS
Shift 1

24 Mei 2016
Shift 2
Shift 3

Wednesday
Date

Shift
GS
Shift 1

25 Mei 2016
Shift 2
Shift 3

Thursday
Date

Shift
GS

26 Mei 2016

Shift 1
Shift 2
Shift 3

Friday
Date

Shift
GS
Shift 1

27 mei 2016

detail activities
Cleaning boiler ground floor: slag spillage,
maintain cleanning boiler operating floor (coal ex pocking)
Maintain cleaning bearing Fans (IDF, PAF & SAF)
maintain cleanning boiler operating floor (coal ex pocking)
Maintain cleaning bearing Fans (IDF, PAF & SAF)
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor: slag spillage,
maintain cleanning boiler floor (coal ex pocking & blocking)
Maintain cleaning bearing Fans (IDF, PAF & SAF)
cleanning boiler operating floor (coal dust ex pocking)
cleaning boiler ground floor (CDT top box & below slag BC#1)
Cleaning coal ex pocking ducting coal feeder
CDTank & slag coooler

detail activities
Cleaning boiler ground floor: slag spillage,
Cleaning bearing PA Fan 1 & 2 .With opr & Helper
Cleaning coal ex ducting coal feeder
maintain cleanning boiler floor (coal ex pocking & blocking)
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleanning slug cooler area

done By
GS crew
Group B
Group C
Group D

done By
GS crew
Group B
Group C
Group D

done By
GS crew
Group A
Group B
Group C

done By
GS crew

Cleanning ID Fan 1 & 2


Cleanning coal ex pocking ducting coal feeder
maintain cleanning boiler floor (coal ex pocking & blocking)
Cleaning coal ex pocking ducting coal feeder
Maintain cleaning bearing Fans (IDF, PAF & SAF)

detail activities
Cleaning boiler ground floor: slag spillage,
Cleaning CDT & MRF both units
Cleaning coal ex ducting coal feeder
Cleanning PA Fan 1 & 2

Shift 1
Group B
Group C

done By
GS crew
Group D
Group A

Shift 2
Shift 3

Saturday
Date

Shift
GS
Shift 1

28 mei 2016
Shift 2
Shift 3

Sunday
Date

Shift

Shift 1
29 Mei 2016
Shift 2
Shift 3

Cleanning coal ex pocking ducting coal feeder


Cleanning coal ex pocking ducting coal feeder

detail activities
Collect Coal spillage ex pocking to bags
Cleaning area slag cooler area 0 meter
Cleaning CDT#1,2; SAF#1, PAF#2
Cleaning coal ex ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning iD Fan 1 & 2
Cleanning coal ex pocking ducting coal feeder
Cleaning floor left & right of furnace

detail activities

Cleaning coal ex pocking ducting coal feeder


Cleaning coal dust that laying over piping & header down
comer and also over the piping of distribution air
Cleaning coal ex pocking ducting coal feeder
Cleaning slag cooler area
Cleaning slag cooler 1
Cleaning coal ex pocking ducting coal feeder

Group A
Group B

done By
GS
Group D
Group A
Group B

done By

Group C
Group D
Group A

Man power Duration Total Duration


1
8 hrs
8
3
1
3
2
1Opr + 2 hlpr

1.5 hrs
1 hr
1 hr
1 hr
1

4.5
1
3
2
3

Total

21.5

Man power Duration Total Duration


1
7 hrs
7
4
1
3
2
1Opr + 2 hlpr
1 Opr

1.5 hrs
1 hr
1 hr
1 hr
1
1
Total

6
1
3
2
3
1
23

Man power Duration Total Duration


1
7
7
2
3
4

1
3
2

2
9
8

Total

34

Man power Duration Total Duration


1
8
8
2
3
3

1
1
2

2
3
6

4 persons
1 person

1 hr
1 hr

4
1

Total

24

Man power Duration Total Duration


4
4
16
1
3
2

1
3
1

1
9
2

3
3

1
1.5

3
4.5

Total

35.5

Man power Duration Total Duration


1
2
2
1
6
6
1
2
2
3
1.5
4.5
3
1.5
4.5
2
1
2
3
1.5
4.5
1
1
1
Total
26.5
Man power Duration Total Duration

3 persons

1 hour

2 person

3 hours

3
1
1
3

1.5
1
2
1
Total:

4.5
1
2
3

total week 21:

19.5

19.5

Cleaning Record per week


Monday
Date

Shift
GS

30 Mei 2016

shift 1
shift 2
Shift 3

Tuesday
Date

Shift
GS
shift 1

31 Mei 2016
Shift2
Shift 3

Wednesday
Date

Shift
GS
shift 1

1-Jun-16
Shift 2
Shift 3

Thursday
Date

Shift
GS
shift 1

2-Jun-16
Shift 2

detail activities
House keeping boiler ground floor & cleaning dust over the piping
abave that areas
Picking up: slag dust, coal dust & garbage below sand screen
Cleaning coal spilage after pocking coal ducting
Cleaning coal dust that laying over piping & header down
comer and also over the piping of distribution air
Cleaning coal spilage after pocking coal ducting
Maintain cleaning bearing PAF & SAF
Cleanning PA FA 1&2
Cleanning coal ex pocking ducting coal feeder

Shift
GS
Shift 1

GS

Group C
Group D
Group A

detail activities
Picking up: slag dust, coal dust & garbage below sand screen
Cleaning pit near PAF & SAF & coal ex chocking at chute bunker
Cleaning coal spilage after pocking coal ducting
Maintain cleaning bearing IDF, PAF & SAF
Cleaning coal spilage after pocking coal ducting
Picking up slag spilage below slage roller outlet chute
Cleaning coal spilage after pocking coal ducting

done By

detail activities
Picking up: slag dust, coal dust & garbage below sand screen

done By

Cleaning coal spilage after pocking coal ducting


Maintain cleaning bearing IDF, PAF & SAF
Cleaning coal spilage after pocking coal ducting
Cleaning coal spilage after pocking coal ducting

detail activities
Picking up: slag dust, coal dust & garbage below sand screen
Cleaning coal spilage after pocking coal ducting
Maintain cleaning bearing IDF, PAF & SAF
Cleaning SA Fan area 1&2
Cleanning coal ex pocking ducting coal feeder
Cleaning coal spilage after pocking coal ducting

Shift 3
Friday
Date

done By

detail activities
Cleanning areaslag cooler & conveyor slag coler
Cleanning ID Fan 1&2

GS
Group B
Group C
Group D

GS
Group B
Group C
Group D

done By
GS
Group A
Group B
Group C

done By
GS
Group A

Shift 1
3-Juni-2016
shift 2
shift 3

Saturday
Date

Shift

Cleanning floor ex coal pocking ducting coal feeeder


Cleaning coal spilage after pocking coal ducting
Cleaning coal spilage after pocking coal ducting

Author:
Helper cleaning at
detail
activities
limestone
& crusher#01

GS
Shift 1
4-Juni-2016

Sunday
Date

Shift

Shift 1
5-Juni-2016
Shift 2
Shift 3

Group B
Group C

done By
GS

Cleanning MRF, PAF, Chemical room, CDT


Cleanning floor ex coal pocking ducting coal feeeder
Cleaning coal ex pocking ducting coal feeder

Shift 2
Shift 3

Group A

Cleaning coal ex pocking ducting coal feeder


Cleaning SA Fan 1&2

detail activities

Cleaning SA Fan 1&2


Cleanning floor ex coal pocking ducting coal feeeder
Cleaning ID Fan 1& 2
Cleaning coal ex pocking ducting coal feeder & A3 area
Cleaning coal ex pocking ducting coal feeder

Group D
Group A
Group B

done By

Group D
Group A
Group B

Man power Duration Total Duration


1

8 hrs

4
3

1 hr
1.5 hrs

2
3
2
2
3

3 hrs
1 hr
1 hr
1
1
Total:

8
4
4.5
6
3
2
1
3
31.5

Man power Duration Total Duration


7
7
1
3
12
4
3
1.5
4.5
1.5
1.5
1
1.5
4.5
3
5
20
4
3
1.5
4.5
Total

54

Man power Duration Total Duration


1
7
7
3
1
3

1.5
1
1.5

4.5
1
4.5

1.5

4.5

Total

21.5

Man power Duration Total Duration


7
7
1
3
1
2
3
3

1.5
1
1
1
1.5

4.5
1
2
3
4.5

Total:

22

Man power Duration Total Duration


1
8
8
2

3
3

1
1.5

3
4.5

1.5

4.5
22

Man power Duration Total Duration

3
3
3

1
1.5
1

3
4.5
3

3
1

1
1

3
1
14.5

Man power Duration Total Duration

1
3
2
3
3

1
1.5
1
1
1

1
4.5
2
3
3
13.5

total week 22:

179

Cleaning Record per week


Monday
Date

Shift
GS
Shift 1

6-Juni-2016
shift 2
Shift 3

Tuesday
Date

Shift
GS
Shift 1

7-Juni-2016
shift 2
Shift 3

Wednesday
Date

Shift
GS
Shift 1

8-Juni-2016
shift 2
shift 3

Thursday
Date

Shift
GS
Shift 1

9-Juni-2016
shift 2
shift 3

detail activities
Cleanning areaslag cooler & conveyor slag coler

Cleanning floor ex coal pocking ducting coal feeeder


Cleaning coal spilage after pocking coal ducting
SAF,MRF cleaning
Cleanning ID Fan 1&2
Cleanning coal ex pocking ducting coal feeder

detail activities
Cleanning areaslag cooler & conveyor slag coler

Cleanning floor ex coal pocking ducting coal feeeder


Cleaning coal spilage after pocking coal ducting
SAF,MRF cleaning
Cleaning coal ex pocking coal feeder
Cleanning PA Fan 1&2

detail activities
Cleanning areaslag cooler & conveyor slag coler
Maintain cleaning bearing all FAN
Cleanning floor ex coal pocking ducting coal feeeder
Cleaning coal spilage after pocking coal ducting
Cleaning coal spilage after pocking coal ducting

detail activities
Cleanning areaslag cooler & conveyor slag coler
Maintain cleaning bearing & gearbox all FAN
Cleanning floor ex coal pocking ducting coal feeeder
Cleaning coal spilage after pocking coal ducting
Cleaning coal spilage after pocking coal ducting

Friday
Date

Shift
GS
Shift 1

10 Juni 2016
shift 2

detail activities
Cleanning areaslag cooler & conveyor slag coler
Cleaning Pa Fan 1 & 2
Cleaning coal ex pocking ducting coal feeder
Cleaning coal spilage after pocking coal ducting

shift 2
shift 3

Saturday
Date

Shift
GS
Shift 1

11 Juni 2016
shift 2
shift 3

Sunday
Date

Cleaning coal spilage after pocking coal ducting

detail activities
Cleanning areaslag cooler & conveyor slag coler
Cleaning Pa Fan 1 & 2
Cleaning coal ex pocking ducting coal feeder
Cleaning coal spilage after pocking coal ducting
Cleaning coal spilage after pocking coal ducting

Shift

Shift 1
12 Juni 2016
Shift 2
shift 3

detail activities

Cleaning
Cleaning
Cleaning
Cleaning
Cleaning

MRF & CDT both units, slag cooler


coal ex pocking ducting coal feeder
slag coler 1&2 .Pa Fan 1&2
coal ex pocking ducting coal feeder
coal spilage after pocking coal ducting

done By Man power Duration Total Duration


1
8
8
GS
Group C
Group D

3
3
1
2
3

Group A

1.5
1.5
1
1
1
Total:

4,5
4,5
1
2
3
23

done By Man power Duration Total Duration


1
8
8
GS
Group C
Group D
Group A

3
3
1
3
2

1.5
1.5
1
1
1
Total:

4,5
4,5
1
3
2
23

done By Man power Duration Total Duration


1
8
8
GS
Group B
Group C
Group D

1
3
3

1.5
1.5
1.5

1.5
4,5
4,5

1.5

4,5

Total:

23

done By Man power Duration Total Duration


1
8
8
GS
Group B
Group C
Group D

1
3
3

1.5
1.5
1.5

1.5
4,5
4,5

1.5

4,5

Total:

23

done By Man power Duration Total Duration


8
8
1
GS
Group A
Group B

2
3
3

1
1
1.5

2
3
4,5

Group B
Group C

1.5

4,5

Total:

22

done By Man power Duration Total Duration


1
8
8
GS
Group A
Group B
Group C

2
3
3

1
1
1.5

2
3
4,5

1.5

4,5

Total:

22

done By Man power Duration Total Duration

Group D
Group A
Group B

1
3
2
3
3

2
1
1
1
1.5

2
3
2
3
4,5

Total:

14.5

TOTAL WEEK 23:

150.5

Cleaning Record per week


Monday
Date

Shift
GS
Shift 1

13 Juni 2016
shift 2
shift 3

Tuesday
Date

Shift
GS
Shift 1

14 Juni 2016
shift 2
shift 3

Wednesday
Date

Shift
GS
Shift 1

15.06.2016
shift 2
shift 3

Thursday
Date

Shift
GS
Shift 1

16.06.2016
Shift 2
shift 3

detail activities
Cleanning area boiler ground floor
Cleaning slag spilage below out let chute slage roller 1& 2
Cleaning SA Fan 1 & 2, MRF
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking coal ducting
Cleaning ID Fan 1&2
Cleaning coal spilage after pocking coal ducting

detail activities
Cleanning area boiler ground floor
Cleaning slag spilage below belt conveyor slag#1
Cleaning bearing fans (IDF, PAF, SAF & MRF)
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleanning slag cooler 1&2

detail activities
Cleanning area boiler ground floor
Cleaning slag spilage below out let chute slage roller 1& 2
Cleaning coal spillage ex pocking ducting coal feeder
Cleaning bearing fans (IDF, PAF, SAF & MRF)
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex poking
Cleaning PA Fan 1&2

detail activities
Cleanning area slag cooler & conveyor slag cooler
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning

coal spillage ex pocking ducting coal feeder


bearing fans (IDF, PAF, SAF & MRF)
coal spillage ex pocking ducting coal feeder
boiler ground floor (fine dust ex dechocking EcTP1)
coal spillage ex pocking ducting coal feeder

Friday
Date

Shift
GS
Shift 1

17.06.2016
Shift 2

detail activities
Cleanning area slag cooler & conveyor slag cooler
Cleaning coal spillage ex pocking ducting coal feeder
Cleaning bearing fans (IDF, PAF, SAF & MRF)
Cleaning bearing fans (IDF, PAF, SAF & MRF)

Shift 2
Shift 3

Saturday
Date

Shift
GS
Shift 1

18 Juni 2016
Shift 2
shift3

Sunday
Date

Shift
GS
Shift 1

19 Juni 2016
Shift 2
shift3

Cleaning coal spillage ex pocking ducting coal feeder


Cleaning coal spillage ex pocking ducting coal feeder

WCOM 626_AM PPL2 KPI Editor::


GS masuk 2 orang untuk kerja di area
coal
feeder chute
dari bunker;
detail
activities
yg bukan termasuk area kerja WCOM
626_AM PPL-2

Cleaning coal ex cleaning ducting feeder


Cleaning ID Fan 1 & 2
Cleaning coal spillage ex pocking ducting coal feeder
Cleaning bearing fans (IDF, PAF, SAF & MRF)
Cleaning coal spillage ex pocking ducting coal feeder
WCOM 626_AM PPL2 KPI Editor:
GS masuk 5 orang untuk kerja di area
coal yard cleanning batubara yang
detail activities
longsor;
bukan termasuk area kerja WCOM
626_AM PPL-2

Cleaning coal ex pocking ducting coal feeder


Cleaning PA Fan 1&2 with opr
Cleaning coal ex pocking ducting coal feeder
Cleaning bearing fans (IDF, PAF, SAF & MRF)
Cleaning coal spillage ex pocking ducting coal feeder

done By Man power Duration Total Duration


1
8
8
GS
1
4
4
2
2
1
Group D
3
3
1
3
3
1
Group A
2
2
1
4.5
3
1.5
Group B
total:

26.5

done By Man power Duration Total Duration


1
8
8
GS
1
8
8
2
1
2
Group C
3
1
3
3
1
3
Group D
Group A

3
2

1
1
total:

3
2
29

done By Man power Duration Total Duration


1
8
8
GS
1
4
4
3
1
3
Group C
2
1
2
3
1
3
Group D
Group A

3
2

1
1
total:

3
2
25

done By Man power Duration Total Duration


1
8
8
GS
Group B
Group C
Group D

2
1
3
2
3

1
1
1
2
1

2
1
3
4
3

total:

21

done By Man power Duration Total Duration


1
8
8
GS
Group B
Group C

2
1
1

1
1
1

2
1
1

Group C
Group D

2
2

1
1

2
2

total:

16

done By Man power Duration Total Duration


GS
Shift 1
Group B
Group C

2
2
2

1
1
1

2
2
2

1
2

2
1
total:

2
2
10

done By Man power Duration Total Duration


GS
Group A
Group B
Group C

2
1
2

1
1
1

2
1
2

1
2

2
1
total:

2
2

total at week 24:

136.5

Cleaning Record per week


Monday
Date

Shift
GS
Shift 1

20 Juni 2016
Shift 2

detail activities
Cleaning slag cooler 1&2
Cleaning coal ex cleaning ducting feeder
SAF, CDT& MRF both units
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder

Shift 3
Tuesday
Date

Shift
GS
Shift 1

21 Juni 2016
Shift 2
Shift 3

Wednesday
Date

Shift
GS
Shift 1

22 Juni 2016
Shift 2
Shift 3

Thursday
Date

Shift
GS
Shift 1

23-Jun-16
Shift 2

detail activities
Cleaning slag cooler 1&2
Cleaning coal ex cleaning ducting feeder
SAF#1, PA#2, CDT & MRF both units
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleanning boiler ground floor; slag spilage on stair way beside BC-1 slag handling & dust over down commer header
Maintain cleaning equipments PAF & SAF equipment & area
Cleaning coal spilage ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning SAF, CDT both units
Cleaning coal ex pocking ducting coal feeder
Cleaninf slag cooler 1&2

detail activities
Cleanning boiler ground floor
coal fine spilage over down commer header & piping
Maintain cleaning equipments PAF & SAF equipment & area
Cleaning coal spilage ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning SAF, CDT, slag cooler, MRF

Friday
Date

Shift
GS
Shift 1

24-Jun-16
Shift 2

detail activities
Cleanning boiler ground floor
coal fine spilage over down commer header & piping
Maintain cleaning equipments PAF & SAF equipment & area
Cleaning coal spilage ex pocking ducting coal feeder
Maintain cleaning equipments PAF & SAF equipment & area

Shift 2
Shift 3

Saturday
Date

Shift
GS
Shift 1

25-Jun-16
Shift 2
Shift 3

Sunday
Date

Shift

Shift 1
26-Jun-16
Shift 2
Shift 3

Cleaning coal spilage ex pocking ducting coal feeder


Cleaning coal spilage ex pocking ducting coal feeder

detail activities
Cleanning boiler ground floor
coal fine spilage over down commer header & piping
Maintain cleaning equipments PAF & SAF equipment & area
Cleaning coal spilage ex pocking ducting coal feeder
Cleaning coal spilage ex pocking ducting coal feeder
Cleaning coal spilage ex pocking ducting coal feeder
CDT, slag cooler, MRF cleaning

detail activities

Maintain cleaning equipments PAF & SAF equipment & area


Cleaning coal spilage ex pocking ducting coal feeder
Cleaning SA Fan 1&2
Cleaning coal ex pocking ducting coal feeder
Cleaning coal spilage ex pocking ducting coal feeder
Maintain cleaning equipments PAF & SAF equipment & area

done By Man power Duration Total Duration


1
8
8
GS
Group D
Group A

2
2
2

1
1
1

2
2
2

Group B
total:

16

done By Man power Duration Total Duration


8
1
8
GS
Group D
Group A
Group B

2
2
2

1
1
1

2
2
2

total:

16

done By Man power Duration Total Duration


6
1
6
GS
4
1
4
1
1
1
Group C
2
1
2
2
1
2
Group D
1
2
2
3
1
3
Group A
2
1
2
total:
22
done By Man power Duration Total Duration
4
1
4
GS
4
1
4
1
1
1
Group C
2
0.5
1
2
1
2
Group D
1
2
2

total:

14

done By Man power Duration Total Duration


4
1
4
GS
4
1
4
1
1
1
Group b
2
0.5
1
1
1
1
Group C

Group C
Group D

2
2

0.5
1

1
2

total:

14

done By Man power Duration Total Duration


1
4
4
GS
4
1
4
1
1
1
Group B
2
2
4
3
2
6
Group C
Group D

2
2

2
1
total:

4
2
25

done By Man power Duration Total Duration

Group A
Group B
Group C

1
3
2
3
2
1

1
2
1
1
1
1
total:

total at week 25:

1
6
2
3
2
1
15

122

Cleaning Record per week


Monday
Date

Shift
GS
Shift 1

27 Juni 2016
Shift 2
Shift 3

Tuesday
Date

Shift
GS
Shift 1

28 Juni 2016
Shift 2
Shift 3

Wednesday
Date

Shift
GS
Shift 1

29 Juni 2016
Shift 2
Shift 3

Thursday
Date

Shift
GS
Shift 1

30-Jun-16

30-Jun-16
Shift 2
Shift 3

Friday
Date

Shift
GS
Shift 1

1-Jul-16
Shift 2
Shift 3

Saturday
Date

Shift
GS
Shift 1

2-Jul-16
Shift 2
Shift 3

Sunday
Date

Shift

Shift 1
3-Jul-16
Shift 2
Shift 3

Cleaning Record per week

detail activities
cleaning area slag cooler

done By
GS

Cleaning ID Fan 1&2


Cleaning coal spilage ex pocking ducting coal feeder
Cleaning coal spilage ex pocking ducting coal feeder
Cleaning coal spilage ex pocking ducting coal feeder
Maintain cleaning equipments PAF & SAF equipment & area

detail activities
cleaning area slag cooler

Shift 1
Group B
Group C

done By
GS

CleaningSA Fan 1&2, CDT


Cleaning coal spilage ex pocking ducting coal feeder
Cleaning ID Fan & Pa Fan 1,2
Cleaning coal spilage ex pocking ducting coal feeder
Cleaning coal spilage ex pocking ducting coal feeder

detail activities
cleaning area slag cooler
CleaningSA Fan 1&2, CDT , MRF
Cleaning coal spilage ex pocking ducting coal feeder
Cleaning PA Fan 1&2
Cleaning coal spilage ex pocking ducting coal feeder
Cleaning coal spilage ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor
Cleaning slag spillage under chute outlet slag roller 1 & 2
Cleanning Sludge spillage at boiler operating floor; furnace
rear side due to flxible joint inlet sludge got bursted
Cleaning coal spilage ex pocking ducting coal feeder

Shift D
Shift A
Group B

done By
GS
Shift D
Shift A
Group B

done By
GS crew
Group C

CleaningSA Fan 1&2, CDT , MRF


Cleaning coal ex pocking
CleaningSA Fan 1&2, CDT , MRF
Cleaning coal ex pocking

Cleaning
Cleaning
Cleaning
Cleaning
Cleaning

detail activities
boiler ground floor
slag spillage under chute outlet slag roller 1 & 2
sludge at operating floor (furnace rear side)
coal spilage ex pocking ducting coal feeder
coal spilage ex pocking ducting coal feeder

Cleaning coal spilage ex pocking ducting coal feeder

detail activities
GS crew assist mechanic doubling cast hot spot roof cyclone
inlet-2 (which are not include WCOM 626 pareto)
Cleanning Sludge spillage at boiler operating floor; furnace
rear side due to flxible joint inlet sludge got bursted again
Cleaning coal spilage ex pocking ducting coal feeder
Cleaning sludge at operating floor (furnace rear side)
Cleaning coal spilage ex pocking ducting coal feeder
Cleaning coal spilage ex pocking ducting coal feeder

detail activities

Cleaning coal spilage ex pocking ducting coal feeder


Cleaning
Cleaning
Cleaning
Cleaning

slag cooler both units


coal spilage ex pocking ducting coal feeder
at bottom ash silo operating floor (near valve)
coal spilage ex pocking ducting coal feeder

Group D
Group A

done By
GS crew
Group C
Group D
Group A

done By
GS
Group B
Group C
Group D

done By

Group B
Group C
Group D

Man power Duration Total Duration


(persons)
(hours)
(hours)
8
8
1
2
3
3

1
1
1

2
3
3

2
1

1
1
total:

2
1
19

Man power Duration Total Duration


(persons)
(hours)
(hours)
8
8
1
1
3
2
3
2

2
1
1
1
1

2
3
2
3
2

total:

20

Man power Duration Total Duration


(persons)
(hours)
(hours)
8
8
1
1
3
2
2
2

2
1
1
1.5
1

2
3
2
3
2

total:

20

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
8
8
1
4
4
3
6
2
2

1
3
1
3

2
1
2
1
total:

2
3
2
3
30

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
8
8
1
4
4
3
3
1
1
2
2
1
3
3
3

total:

23

Man power Duration Total Duration


(persons)
(hours)
(hours)
4
8
2

2
2
3
3

1
2
1
1

2
4
3
3

total:

18

Man power Duration Total Duration


(persons)
(hours)
(hours)

1
3
1
2

2
1
2
1
total:

2
3
2
2
11

total at week 26:

141

Cleaning Record per week


Monday
Date

Shift
GS
Shift 1

4-Jul-16
Shift 2
Shift 3

Tuesday
Date

Shift
GS
Shift 1

5 Juli 2016
Shift 2
Shift 3

Wednesday
Date

Shift
GS
Shift 1

6 Juli 2016
Shift 2
Shift 3

Thursday
Date

Shift
GS
Shift 1

7 Juli 2016
Shift 2

7 Juli 2016
Shift 2
Shift 3

Friday
Date

Shift
GS
Shift 1

8 Juli 2016
Shift 2
Shift 3

Saturday
Date

Shift
GS
Shift 1

9 Juli 2016
Shift 2
Shift 3

Sunday
Date

Shift

Shift 1
10-Jul-16
Shift 2
Shift 3

Cleaning Record per week


detail activities
Cleaning boiler ground floor
Cleaning slag spillage under chute outlet slag roller 1 & 2
Cleaning coal spilage ex pocking ducting coal feeder
Maintenance cleaning bearing PAF,SAF, IDF
Cleaning coal spilage ex pocking ducting coal feeder
Cleaning coal spilage ex pocking ducting coal feeder

detail activities
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning

boiler ground floor


slag spillage under chute outlet slag roller 1 & 2
PA Fan & sa Fan
Coal ex pocking ducting coal feeder
coal spilage ex pocking ducting coal feeder

Cleaning coal spilage ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor
Cleaning slag spillage under chute outlet slag roller 1 & 2
Cleaning coal spilage ex pocking ducting coal feeder
Cleaning coal spilage ex pocking ducting coal feeder
Cleaning coal spilage ex pocking ducting coal feeder

detail activities
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning

boiler ground floor


slag spillage under chute outlet slag roller 1 & 2
coal spilage ex pocking ducting coal feeder
area clean drain tank&dosing pump room
coal spilage ex pocking ducting coal feeder

done By
GS crew
Group A
Group B
Group C

done By
GS crew
Group A
Group B
Group C

done By
GS crew
Group D
Group A
Group B

done By
GS crew
Group D
Group A

Cleaning ID Fan 1&2


Cleaning coal spilage ex pocking ducting coal feeder
Cleaning Sa Fan 1&2

detail activities
Cleaning boiler ground floor
Picking up hard dirt below chute outlet slag roller 1 & 2
Cleaning coal spilage ex pocking ducting coal feeder
Cleaning coal spilage ex pocking ducting coal feeder
Cleaning coal spilage ex pocking ducting coal feeder

detail activities
Picking up hard dirt below chute outlet slag roller 1 & 2
Cleaning coal spilage ex pocking ducting coal feeder
Cleaning coal spilage ex pocking ducting coal feeder
Cleaning PA Fan 1&2
Cleaning Coal ex pocking ducting coal feeder

detail activities

Cleaning coal spilage ex pocking ducting coal feeder


Cleaning coal spilage ex pocking ducting coal feeder
Cleaning coal spilage ex pocking ducting coal feeder

Group A
Group B

done By
GS crew
Group C
Group A
Group B

done By
GS crew
Group C
Group D
Group A

done By

Group B
Group C
Group D

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
4
4
1
4
4
2
1
2
1
1
1
1
2
2
2

total:

15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
4
4
1
4
4
1
1
1
2
1
2
1
2
2
2

total:

15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
4
4
1
4
4
1
2
2
2

total:

14

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
4
4
1
4
4
2
1
2
1
1
1
2
1
2

1
2
1

1
1
1
total:

1
2
1
17

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
7
7
3
7
21
2
0.5
1
2

0.5

0.5

total:

31

Man power Duration Total Duration


(persons)
(hours)
(hours)
4
4
16
2

0.5

0.5

2
3

1
1
total:

2
3
23

Man power Duration Total Duration


(persons)
(hours)
(hours)

total:

TOTAL WEEK 27:

121

Cleaning Record per week


Monday
Date

Shift
General
Shift 1

July 11th, 2016


shift 2
shift 3

Tuesday
Date

Shift
General
Shift 1

July 12th, 2016


shift 2
shift 3

Wednesday
Date

Shift
General
Shift 1

July 13th, 2016


shift 2
shift 3

Thursday
Date

Shift
General
Shift 1

July 14th, 2016


shift 2

July 14th, 2016


shift 2
shift 3

Friday
Date

Shift
General
Shift 1

July 15th, 2016


shift 2
shift 3

Saturday
Date

Shift

Shift 1
July 16th, 2016
shift 2
shift 3

Sunday
Date

Shift

Shift 1
July 17th, 2016
shift 2
shift 3

Cleaning Record per week


detail activities
Cleaning boiler ground floor area (including slag spilage under outlet chute of drum roller)
Cleaning Slag roller & CD pump
cleaning boiler operating floor
cleaning SAF & MRF bearing
cleaning boiler operating floor
Maintain cleaning IDF & PAF bearing
cleaning boiler operating floor

detail activities
Cleaning boiler ground floor area
(boiler break down water wall tube leakage)
Cleaning Slag roller & CD pump
cleaning boiler operating floor
cleaning SAF & MRF bearing
cleaning boiler operating floor
Maintain cleaning IDF & PAF bearing
cleaning boiler operating floor

detail activities
Cleaning boiler ground floor area
(boiler break down water wall tube leakage)
Cleaning Slag roller & CD pump
cleaning boiler operating floor
cleaning SAF & MRF bearing
cleaning boiler operating floor
Maintain cleaning IDF & PAF bearing
cleaning boiler operating floor

detail activities
Cleaning boiler ground floor area
(boiler break down water wall tube leakage)
Cleaning Slag roller & CD pump
cleaning boiler operating floor
cleaning SAF & MRF bearing

done By
GS Crew
Group B
Group C
Group D

done By
GS Crew
Group A
Group B
Group C

done By
GS Crew
Group A
Group B
Group C

done By
GS Crew
Group D
Group A

cleaning boiler operating floor


Maintain cleaning IDF & PAF bearing
cleaning boiler operating floor

detail activities
Cleaning boiler ground floor area
(boiler break down water wall tube leakage)
Cleaning Slag roller & CD pump
cleaning boiler operating floor
cleaning SAF & MRF bearing
cleaning boiler operating floor
Maintain cleaning IDF & PAF bearing
cleaning boiler operating floor

detail activities

Cleaning Slag roller & CD pump


cleaning boiler operating floor
cleaning SAF & MRF bearing
cleaning boiler operating floor
Maintain cleaning IDF & PAF bearing
cleaning boiler operating floor

detail activities

Cleaning Slag roller & CD pump


cleaning boiler operating floor
cleaning SAF & MRF bearing
cleaning boiler operating floor
Maintain cleaning IDF & PAF bearing
cleaning boiler operating floor

Group A
Group B

done By
GS Crew
Group D
Group A
Group B

done By

Group C
Group D
Group A

done By

Group C
Group D
Group A

Man power Duration Total Duration


(persons)
(hours)
(hours)
8
1
8
1
1
1
1
1
1

2
1
2
1
2
1
total:

2
1
2
1
2
1
17

Man power Duration Total Duration


(persons)
(hours)
(hours)
8
1
8
1
1
1
1
1
1

2
1
2
1
2
1
total:

2
1
2
1
2
1
17

Man power Duration Total Duration


(persons)
(hours)
(hours)
8
1
8
1
1
1
1
1
1

2
1
2
1
2
1
total:

2
1
2
1
2
1
17

Man power Duration Total Duration


(persons)
(hours)
(hours)
8
1
8
1
1
1

2
1
2

2
1
2

1
1
1

1
2
1
total:

1
2
1
17

Man power Duration Total Duration


(persons)
(hours)
(hours)
8
1
8
1
1
1
1
1
1

2
1
2
1
2
1
total:

2
1
2
1
2
1
17

Man power Duration Total Duration


(persons)
(hours)
(hours)

1
1
1
1
1
1

2
1
2
1
2
1
total:

2
1
2
1
2
1
9

Man power Duration Total Duration


(persons)
(hours)
(hours)

2
1
2
1
2
1
total:

2
1
2
1
2
1

TOTAL WEEK 28:

103

1
1
1
1
1
1

Cleaning Record per week


Monday
Date

Shift
General
shift 1

18-Jul-18
shift 2
shift 3

Tuesday
Date

Shift
General
shift 1

19-Jul-18
shift 2
shift 3

Wednesday
Date

Shift
GS
Shift 1

20-Jul-16
shift 2
Shift 3

Thursday
Date

Shift
GS
Shift 1

21-Jul-16
shift 2

21-Jul-16
shift 2
Shift 3

Friday
Date

Shift
General
Shift 1

22-Jul-16
shift 2
Shift 3

Saturday
Date

Shift

Shift 1
23 Juli 2016
shift 2
Shift 3

Sunday
Date

Shift

Shift 1
24 Juli 2016
shift 2
Shift 3

Cleaning Record per week


detail activities
cleaning garbace & waste material ex shut down boiler 9
cleaning slag roller & CDPump
cleaning boiler operating floor
cleaning SAF & MRF bearing
cleaning boiler operating floor
Maintain cleaning IDF & PAF bearing
cleaning boiler operating floor

detail activities
cleaning garbace & waste material ex shut down boiler 9
cleaning SAF & MRF bearing
cleaning boiler operating floor
cleaning slag roller & CDPump
cleaning boiler operating floor
Maintain cleaning BFWP
cleaning boiler operating floor

detail activities
Cleaing area slag cooler

done By
GS crew
Group B
Group C
Group D

done By
GS crew
Group B
Group C
Group D

done By
GS crew

Cleaning PA Fan 1&2


cleaning boiler operating floor
cleaning boiler operating floor
Cleaning boiler operating floor (under sand silo-1)
Cleaning MRF, IDF, SAF & under tail puly SLAG BC-2

detail activities
Cleaning area slag cooler
Cleaning ID fAn 1& 2
Cleaning floor fron boiler
cleaning boiler operating floor

Group A
Group B
Group C

done By
GS crew
Group A
Group B

Cleaning MRF 1, 2
Cleaning boiler operating floor (under sand silo-1)
cleaning SAF bearing

detail activities
Cleaning Slag roller, CDPump & Boiler ground floor area
cleaning boiler operating floor
Maintain cleaning bearing IDF 1 & 2
cleaning boiler operating floor
Maintain cleaning bearing PAF & SAF
Cleaning MR no 1&2
Cleaning floor front furnace

detail activities

Cleaning boiler operating floor


Cleaning Slag rooler & CDPump
Cleaning boiler operating floor
Maintain cleaning bearing IDF & PAF
Cleaning MRF & SAF
Cleaning floor front furnace

detail activities

Cleaning boiler operating floor (furnace rear / on cable tray)


Cleaning Slag rooler, CDPump & ground floor area
Cleaning boiler operating floor
Cleaning PA Fan 1&2
Cleaning coal ex cleaning coal feeder

Group B
Group C

done By
GS crew
Group D
Group A
Group B

done By

Group D
Group A
Group B

done By

Group C
Group D
Group A

Man power Duration Total Duration


(persons)
(hours)
(hours)
32
4
8
2
1
1
1
1
1

1
1
2
1
1
1
total:

2
1
2
1
1
1
40

Man power Duration Total Duration


(persons)
(hours)
(hours)
32
4
8
2
1
2
1
1
1

1
1
1
1
1
1
total:

2
1
2
1
1
39

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
8
8
2
1
1

1
2
1

2
2
1

1
2

1
1.5
total:

1
3
17

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
8
8
2
1
1

1
1
1

2
1
1

1
1
1

1
1
1
total:

1
1
1
15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
8
8
1
1
1
1
1
1

1
1
1
1
1
1
total:

1
1
1
1
1
1
14

Man power Duration Total Duration


(persons)
(hours)
(hours)

1
2
1
1
1
1

1
1
1
1
1
1
total:

1
2
1
1
1
1
7

Man power Duration Total Duration


(persons)
(hours)
(hours)

1
2
1

1
1.5
1

1
3
1

2
1

1
1
total:

2
1
8

TOTAL WEEK 29:

140

Cleaning Record per week


Monday
Date

Shift
General
Shift 1

25 Juli 2016
shift 2
Shift

Tuesday
Date

Shift
General
Shift 1

26 Juli 2016
Shift2
shift 3

Wednesday
Date

Shift
General
Shift 1

27 Juli 2016
Shift2
shift 3

Thursday
Date

Shift
General
Shift 1

28 Juli 2016

28 Juli 2016
Shift2
Shift 3

Friday
Date

Shift
General
Shift 1

29 Juli 2016
Shift2
Shift3

Saturday
Date

Shift
General
Shift 1

30 Juli 2016
Shift2
Shift3

Sunday
Date

Shift

Shift 1
31 Juli 2016
Shift2
Shift3

Cleaning Record per week

detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor
Maintain cleaning bearing IDF 1 & 2
Cleaning CDT both units
Cleaning SAF both units
Cleaning SA Fan 1&2
Cleaning floor camera area

detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor near ducting feeder
Cleaning both PA FAN
Cleaning boiler operating floor (dust at PA duct from burner
area till PA duct near damper inlet win box / below manhole)
Cleaning MRF & SAF (dust from upper level area)
Cleaning MRF both units

detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor near ducting feeder
Cleaning both PA FAN
Cleaning boiler operating floor
Maintain cleaning bearing IDF 1 & 2
Cleaning boiler operating floor near ducting feeder

detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor near ducting feeder

done By
GS crew
Group C
Group D
Group A

done By
GS crew
Group B
Group C
Group D

done By
GS crew
Group B
Group C
Group D

done By
GS crew
Group A

Cleaning ex pocking ducting coal feeder & furnace area


Cleaning ex pocking ducting coal feeder & furnace area

detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor (coal spillage ex pocking)
Cleaning ex pocking ducting coal feeder & furnace area
Cleaning boiler operating floor (coal spillage ex pocking)
Maintain cleaning bearing IDF, PAF & SAF

detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor (coal spillage ex pocking)
Cleaning CDT both units
Cleaning ex pocking ducting coal feeder & furnace area
Cleaning boiler operating floor (coal spillage ex pocking)

detail activities

Cleaning boiler operating floor (coal spillage ex pocking)


Cleaning slag cooler area, (blowing last night)
Cleaning ex pocking ducting coal feeder & furnace area
Cleaning boiler operating floor (coal spillage ex pocking)

Group B
Group C

done By
GS crew
Group A
Group B
Group C

done By
GS crew
Group D
Group A
Group B

done By

Group D
Group A
Group B

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
8
8
1
2
1
1
1
1

1
1
1
1
1
1
total:

1
2
1
1
1
1
15

Man power Duration Total Duration


(persons)
(hours)
(hours)
8
1
8
1
1
2

1
1
2

1
1
4

2
1

1
1

2
1

total:

17

Man power Duration Total Duration


(persons)
(hours)
(hours)
8
1
8
1
1
1
1
3

1
1
1
1
1

1
1
1
1
3

total:

15

Man power Duration Total Duration


(persons)
(hours)
(hours)
8
1
8
3

total:

17

Man power Duration Total Duration


(persons)
(hours)
(hours)
8
1
8
2

1.5

2
1

1
1
total:

2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
4
1
4
2
1
2

1
1
1

2
1
2

total:

11

Man power Duration Total Duration


(persons)
(hours)
(hours)

2
3
2

1
1
1

2
3
2

total:

TOTAL WEEK 30:

100

Cleaning Record per wee


Monday
Date

Shift
General
Shift 1

August, 1st 2016


Shift 2
Shift 3

Tuesday
Date

Shift
General
Shift 1

August, 2nd 2016


Shift 2
Shift 3

Wednesday
Date

Shift
General
Shift 1

August, 3rd 2016


Shift 2
Shift 2

Thursday
Date

Shift
General
Shift 1

August 4th, 2016

August 4th, 2016


Shift 2
Shift 2

Friday
Date

Shift
General
Shift 1

5/8/2016
SHIFT 2
Shift 3

Saturday
Date

Shift
General
Shift 1

6/8/2016
SHIFT 2
Shift 3

Sunday
Date

Shift

Shift 1
7/8/2016
SHIFT 2
Shift 3

Author:
GS hari minggu libur

Cleaning Record per week


detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor; coal spillage
Maintain cleaning equipments: CDPump 1 &
Cleaning boiler operating floor; coal spillage
Maintain cleaning equipments:
Cleaning boiler operating floor; coal spillage
Maintain cleaning equipments:

after preventive pocking)


2 and SAF
after preventive pocking)
after preventive pocking)

detail activities
Cleaning boiler ground floor area & Top of ash silo there was lot of
useless materials & dust
Cleaning boiler operating floor; coal spillage after preventive pocking)
Maintain cleaning equipments: IDF1 & 2 (at location near IDF lot of
garbage ex masker, hand gloves & plastic bags ex unloading limestone)
Cleaning boiler operating floor; coal spillage after preventive pocking)
cleaning area lub oil system, turbine inside cage
Cleaning boiler operating floor; coal spillage after preventive pocking)
Maintain cleaning equipments:

detail activities
Cleaning boiler ground floor area & continue cleaning Top of ash silo
Cleaning boiler operating floor; coal spillage after preventive pocking)
Maintain cleaning equipments: PA FAN 1,2
Cleaning boiler operating floor
Maintain cleaning equipments: ID FAN 1,2
Cleaning boiler operating floor
Maintain cleaning equipments:

detail activities
Cleaning boiler ground floor area & continue cleaning Top of ash silo
Cleaning boiler operating floor; coal spillage after preventive pocking)
Maintain cleaning equipments: PA FAN 1,2

Cleaning boiler operating floor


Maintain cleaning equipments: ID FAN 1,2
Cleaning boiler operating floor; coal spillage after preventive pocking)
Maintain cleaning equipments:

detail activities
Cleaning boiler ground floor area & continue cleaning Top of ash silo
Cleaning boiler operating floor; coal spillage after preventive pocking)
Maintain cleaning equipments:
Cleaning boiler operating floor; coal spillage after preventive pocking)
Maintain cleaning equipments: PA FAN 1,2
Cleaning boiler operating floor; coal spillage after preventive pocking)
Maintain cleaning equipments: ID Fans 1 & 2

detail activities
Cleaning boiler ground floor and slag cooler area
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: IDF1, 2 & PAF 1,2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: SA FAN 1,2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1 & 2

Author:
GS hari minggu libur

detail activities

Cleaning boiler operating floor; coal spillage after preventive pocking


Maintain cleaning equipments: IDF1, 2 & PAF 1,2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: SA FAN 1,2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1 & 2

done By
GS crew
Group C
Group D
Group A

done By
GS crew
Group C
Group D
Group A

done By
GS crew
Group B
Group C
Group D

done By
GS crew
Group B

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
1
1
1
1
1
total:

6
2
1
2
1
2
1
15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
2

1
1

2
2

3
3
2
1

1
1
1
1
total:

3
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
1
1
1
1
1
total:

6
2
1
2
1
2
1
15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1

1
1

2
1

Group C
Group D

done By
GS crew
Group A
Grup B
Group C

done By
GS crew
Group A
Grup B
Group C

done By

Group D
Group A
Group B

2
1
3
3

1
1
1
1
total:

2
1
3
15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
1
1
1
1
1
total:

2
1
2
1
2
1
15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
2
1
1
1
1
total:

2
2
2
1
2
1
13

Man power Duration Total Duration


(persons)
(hours)
(hours)

2
1
2
1
2
1

1
2
1
1
1
1
total:

TOTAL WEEK 31:

2
2
2
1
2
1
10

99

Cleaning Record per we


Monday
Date

Shift
General
Shift 1

8/8/2016
Shift 2
Shift 3

Tuesday
Date

Shift
General
Shift 1

9/8/2016
Shift 2
Shift 3

Wednesday
Date

Shift
General
Shift 1

10/8/2016
Shift 2
Shift 3

Thursday
Date

Shift
General

11/8/2016

Shift 1

11/8/2016
Shift 2
Shift 3

Friday
Date

Shift
General
Shift 1

12/8/2016
Shift 2
Shift 3

Saturday
Date

Shift

Shift 1
13/8/2016
Shift 2
Shift 3

Sunday
Date

Shift
General
Shift 1

14/8/2016
Shift 2
Shift 3

Cleaning Record per week


detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor; coal spillage
Maintain cleaning equipments: CDPump 1 &
Cleaning boiler operating floor; coal spillage
Maintain cleaning equipments: PAF 1 & 2
Cleaning boiler operating floor; coal spillage

after preventive pocking)


2 and SAF
after preventive pocking)
after preventive pocking

detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF 1 & 2; SAF 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking)
Maintain cleaning equipments: CDT, Slag Cooler & MRF
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: IDF1 & 2

detail activities
Cleaning boiler ground floor area
Shifting lime from bags to capsule truck (not including WCOM job)
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF 1 & 2; SAF 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking)
Maintain cleaning equipments: CDT, Slag Cooler & MRF
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: IDF1 & 2

detail activities
Cleaning boiler ground floor area; cleaning slag spilage ex pocking
drain pipe no.2
Cleaning & repainting Clean Drain Pump 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: CDPump 1 & 2 and Slag Drum roller 1&2

Cleaning boiler operating floor; coal spillage after preventive pocking


Maintain cleaning equipments: PAF 1&2, SAF 1&2, MRF 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking)
Maintain cleaning equipments: MRF

detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: IDF1 & 2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF & SAF
Cleaning boiler operating floor; coal spillage after preventive pocking)
Maintain cleaning equipments: MRF

detail activities

Cleaning boiler operating floor; coal spillage after preventive pocking


Maintain cleaning equipments: PAF & SAF
Cleaning boiler operating floor; coal spillage after preventive pocking
Cleaning & bagging ash from hopper bag house A3
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: IDF & continou bagging ash bag house

detail

Author:
not include in pareto
equipment or area
WCOM 626 (should not
activities
be count on KPI)

Cleaning bag house area, chimney area,


Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF, SAF & MRF
Cleaning boiler operating floor; coal spillage after preventive pocking
Cleaning slag cooler area & delivery sand area
Cleaning boiler operating floor & piping Down comer to water wall header
Maintain cleaning equipments: Slag Cooler & CDPump & tank

done By
GS crew
Group D
Group A
Group B

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2

1
1
1
1
1

2
1
2
1
2

total:

done By
GS crew
Group C
Group D
Group A

done By
GS crew
Group C
Group D
Group A

done By

14

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
1
1
1
1
1
total:

2
1
2
1
2
1
15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
1
1
1
1
1
total:

2
1
2
1
2
1
15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
2
1

4
1
2

4
2
2

GS crew
Group B

Group C
Group D

done By
GS crew
Group B
Group C
Group D

done By

Group A
Group B
Group C

done By
GS crew
Group A
Group B
Group C

2
1
2
1

1
2
1
1
total:

2
2
2
1
23

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
1
1
1
1
1
total:

2
1
2
1
2
1
15

Man power Duration Total Duration


(persons)
(hours)
(hours)

2
1
2
3
2
2

1
1
1
1.5
1
1.5
total:

2
1
2
4.5
2
3
14.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
5

2
2
2
2
3
2

1
1
1
2
2
1
total:

TOTAL WEEK 32:

30
2
2
2
4
6
2
48

100.5

Cleaning Record per we


Monday
Date

Shift
General
Shift 1

15/8/2016
Shift 2
Shift 3

Tuesday
Date

Shift
General
Shift 1

16/8/2016
Shift 2
Shift 3

Wednesday
Date

Shift
GS
Shift 1

17/08/2016
Shift
Shift 3

Thursday
Date

Shift
General
Shift 1

18/08/2016
Shift 2

18/08/2016
Shift 2
Shift 3

Friday
Date

Shift
General
Shift 1

19/08/2016
Shift 2
Shift 3

Saturday
Date

Shift
General

20/08/2016

Shift 1
Shift 2
Shift 3

Sunday
Date

Shift
GS
Shift 1

21/08/2016
Shift 2
Shift 3

Cleaning Record per week


detail activities
Cleaning boiler ground floor area

Author:
input by Dwi
Santoso

Cleaning boiler Ground floor area; coal spilage ex pocking ducting


Cleaning Slag roller & MRF
Cleaning FD Fan1&2
Cleaning coal ex poking
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: CDPump & tank

detail activities
Cleaning boiler ground floor area

Author:
input by Dwi
Santoso

Cleaning boiler Ground floor area; coal spilage ex pocking ducting


Cleaning Slag roller & Clean Drain Pump
Cleaning ID Fan 1&2
Cleaning coal ex pocking
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF & SAF

detail activities
Author:
input by Dwi Santoso

HUT Proklamasi NKRI; GS of

Cleaning boiler Ground floor area; coal spilage ex pocking ducting


Cleaning Slag roller & Clean Drain Pump
Cleaning boiler Ground floor area; coal spilage ex pocking ducting
Maintain cleaning equipment: SAF & MRF
Cleaning coal ex pocking area ducting coal feeder
Cleaning PA F no 1&2

detail activities
Cleaning boiler ground floor area

Author:
input by Dwi Santoso

Cleaning boiler operating floor; coal spillage after preventive pocking


Maintain cleaning equipments: Slag cooler 1 & 2
Cleaning boiler operating floor; coal spillage after preventive pocking)

Maintain cleaning equipments: PAF, MRF & SAF (dust from ash eco Tp#2)
Cleaning ID fan 1&2
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor area
Cleaning
Cleaning
Cleaning
Cleaning

Author:
input by Dwi Santoso

boiler operating floor; coal spillage after preventive pocking)


Slag roller & Clean Drain Pump
boiler operating floor; coal spillage after preventive pocking)
ID Fan 1&2

Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor; coal spillage after preventive pocking
Cleaning SA FAN 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking)
Cleaning PA Fan 1&2
Maintain cleaning equipment: MRF
Cleaning coal ex pocking ducting coal feeder

detail activities
OFF Day
Cleaning ID Fan 1&2
Cleanifng coal ex pocking ducting coal feeder
Cleaning boiler operating floor; coal spillage after preventive pocking
Cleaning SA Fan 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking)
Cleaning PA Fan 1&2

done By
GS crew
Group D
Group A
Group B

done By
GS crew
Group D
Group A
Group B

done By

Group C
Group D
Group A

done By
GS crew
Group C
Group D

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
1
2
2
1

1
1
1
1
1
1
total:

2
1
1
2
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
1
2
2
1

1
1
1
1
1
1
total:

2
1
1
2
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)

2
1
2
1
3
1

1
1
1
1
1
1
total:

2
1
2
1
2
1
9

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2

1
1
1

2
1
2

Group D
Group A

done By
GS crew
Group B
Group C
Group D

done By
GS crew
Group B
Group C
Group D

done By

Group A
Group B
Group C

2
1
2

1
1
1
total:

2
1
2
17

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1

1
1
1
1

2
1
2
1

1
total:

3
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
1
2

1
1
1
1
1
1
total:

2
1
2
1
1
2
13

Man power Duration Total Duration


(persons)
(hours)
(hours)

1
2
2
1
2
1

1
1
1
1
1
1
total:

TOTAL WEEK 33:

1
2
2
1
2
1
9

96

Cleaning Record per we


Monday
Date

Shift
GS
Shift 1

22/08/2016
Shift 2
Shift 3

Tuesday
Date

Shift
GS
Shift 1

23/08/2016
Shift 2
Shift 3

Wednesday
Date

Shift
GS
Shift 1

24/08/2016
Shift 2
Shift 3

Thursday
Date

Shift
General
Shift 1

25/08/2016
Shift 2

25/08/2016
Shift 2
Shift 3

Friday
Date

Shift
General
Shift 1

26/08/2016
Shift 2
Shift 3

Saturday
Date

Shift

Shift 1
27/08/2016
Shift 2
Shift 3

Sunday
Date

Shift

Shift 1
28/08/2016
Shift 2
Shift 3

Cleaning Record per week


detail activities
Cleaning boiler ground floor area
Cleaning ID Fan 1&2
Cleanifng coal ex pocking ducting coal feeder
Cleaning boiler operating floor; coal spillage after preventive pocking
Cleaning SA Fan 1&2
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor area
Cleaning MRF 1&2, CDT, slag cooler
Cleanifng coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2
Cleaninf coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor area
Cleaning CEP 1&2, CDT, slag cooler
Cleanifng coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: Slag cooler 1 & 2
Cleaning SAF 1&2, CDT, slag cooler

Cleanifng coal ex pocking ducting coal feeder


Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2

detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF 1&2; SAF 1&2; MRF 1&2
Cleaning drain tank & dosing pump room
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning ID Fan 1&2

detail activities

Cleaning boiler operating floor; coal spillage after preventive pocking


Maintain cleaning equipments: Slag roller, Slag BC-1 & Sand screen area
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: CD Pump 1&2; MRF 1&2
Cleaning coal ex pocking ducting coal feeder
Maintain cleaning equipments: PAF 1&2; SAF 1&2

detail activities

Cleaning boiler operating floor; coal spillage after preventive pocking


Maintain cleaning equipments: IDF 1&2, CD pump 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1&2
Cleaning coal ex pocking ducting coal feeder
Maintain cleaning equipments: CDT 1&2

done By
GS crew
Group A
Group B
Group C

done By
GS crew
Group D
Group A
Group B

done By
GS crew
Group D
Group A
Group B

done By
GS crew
Group C
Group D

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
2
2
1

1
1
1
1

1
2
2
1

1
total:

2
15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
2
1
2

2
1
1
1

2
2
1
2

1
total:

2
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
2
2
1

2
1
1
1

2
2
2
1

1
total:

2
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
1

1
1
2

2
1
2

Group D
Group A

done By
GS crew
Group C
Group D
Group A

done By

Group B
Group C
Group D

done By

Group B
Group C
Group D

2
2
1

1
1
1
total:

2
2
1
17

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
2
1
2
2
1

1
1
1
1
1
1
total:

2
2
1
2
2
1
17

Man power Duration Total Duration


(persons)
(hours)
(hours)

2
2
2
2
2
2

1
1
1
1
1
1
total:

2
2
2
2
2
2
12

Man power Duration Total Duration


(persons)
(hours)
(hours)

2
2
2
1
2
2

1
1
1
1
1
1
total:

TOTAL WEEK 34:

2
2
2
1
2
2
11

104

Cleaning Record per week


Monday
Date

Shift
GS
Shift 1

29/08/2016
Shift 2
Shift 3

detail activities
Cleaning boiler ground floor area
Cleaning IDFan 1&2; PAFan 1&2
Cleanifng coal ex pocking ducting coal feeder
Cleanifng coal ex pocking ducting coal feeder
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: Slag cooler 1&2

Tuesday
Date

Shift
GS
Shift 1

30/08/2016
Shift 2
Shift 3

detail activities
Cleaning boiler ground floor area
Cleaning IDFan 1&2; PAFan 1&2
Cleanifng coal ex pocking ducting coal feeder
Cleanifng coal ex pocking ducting coal feeder
Cleaning pipa distribution from down comer
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRFan 1&2

Wednesday
Date

Shift
GS
Shift 1

31/08/2016
Shift 2
Shift 3

detail activities
Cleaning boiler ground floor area
Cleaning CDT
Cleanifng coal ex pocking ducting coal feeder
Ccleaning PA Fan 1&2
Cleanifng coal ex pocking ducting coal feeder
Cleanifng coal ex pocking ducting coal feeder
Cleaning pipa distribution from down comer

Thursday
Date

Shift
GS
Shift 1

9/1/2016
Shift 2
Shift 3

detail activities
Cleaning boiler ground floor area
Cleaning CDT&slag cooler both units
Cleanifng coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2
Cleanifng coal ex pocking ducting coal feeder
Maintain cleaning equipments: MRFan 1&2

Friday
Date

Shift

detail activities

GS
Shift 1
Sept 2nd, 2016
Shift 2
Shift 3

Cleaning boiler ground floor area


Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF 1&2; SAF 1&2
Cleaning coal ex pocking ducting coal feeder
Cleaning MR Fan 1&2, CDT & slag cooler both units
Cleanifng coal ex pocking ducting coal feeder
Maintain cleaning equipments: IDF 1&2

Saturday
Date

Shift

detail activities
Of

General
Shift 1
3-Sep-16
Shift 2
Shift 3

Cleaning boiler operating floor; coal spillage after preventive pocking


Maintain cleaning equipments: PAF 1&2
Cleaning coal ex pocking ducting coal feeder
Cleaning MR Fan 1&2,SA Fan 1&2, CDT& slag cooler
Cleanifng coal ex pocking ducting coal feeder
Maintain cleaning equipments: IDF 1&2

Sunday
Date

Shift
GS
Shift 1

4-Sep-16
Shift 2
Shift 3

detail activities
OFF
Cleanifng coal ex pocking ducting coal feeder
Cleaning & bagging sand ex pocking & blowing slag cooler 2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1&2
Cleaning coal ex pocking ducting coal feeder
Cleaning slag cooler

done By
GS crew
Group A
Group B
Group C

done By
GS crew
Group A
Group B
Group C

done By
GS crew
Group D
Group A
Group B

done By
GS crew
Group D
Group A
Group B

done By

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
2
2

1
1
1

2
2
2

2
2

1
1
total:

2
2
17

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
2
2
2
2
1

1
1
1
1
1
1
total:

7
2
2
2
2
2
1
18

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
2
1
3
2
2

1
1
1
1
1
1
total:

2
2
1
3
2
2
19

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
2
3
1
2
1

2
1
1
1
1
1
total:

7
2
2
3
1
2
1
18

Man power Duration Total Duration


(persons)
(hours)
(hours)

GS crew
Group C
Group D
Group A

done By

Group C
Group D
Group A

done By

Group B
Group C
Group D

2
1
2
1
2
1

1
1
1
1
1
1
total:

7
2
1
2
1
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)

2
1
2
1
2
1

1
1
1
1.5
1
1
total:

2
1
2
1.5
2
1
9.5

Man power Duration Total Duration


(persons)
(hours)
(hours)

2
2
2
1
2
1

1
1
1
1
1
0.5
total:

2
2
2
1
2
0.5
9.5

TOTAL WEEK 35:

107

Cleaning Record per wee


Monday
Date

Shift
General
Shift 1

5-Sep-16
Shift-2
Shift 3

Tuesday
Date

Shift
General
Shift 1

6-Sep-16
Shift-2
Shift 3

Wednesday
Date

Shift
General
Shift 1

9/7/2016
Shift-2
Shift 3

Thursday
Date

Shift
General
Shift 1

9/8/2016
Shift 2

9/8/2016
Shift 2
Shift 3

Friday
Date

Shift
General
Shift 1

9/9/2016
Shift 1
Shift 3

Saturday
Date

Shift
General
Shift 1

9/10/2016
Shift 2
Shift 3

Sunday
Date

Shift
GS
Shift 1

9/11/2016
Shift 2
Shift 3

Cleaning Record per week


detail activities
Cleaning boiler ground floor area
Cleaning IDFan 1&2; PAFan 1&2
Cleanifng coal ex pocking ducting coal feeder
Cleanning boiler operating flor; coal spillage after preventive pocking
Maintain cleaning of equipments: MRF 1&2; SAF 1&2
Cleaning coal ex pocking ducting coal feeder
Cleaning slag cooler&CDT both units

detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF 1&2
Cleanning boiler operating flor; coal spillage after preventive pocking
Maintain cleaning of equipments: MRF 1&2; SAF 1&2
Cleaning coal ex pocking ducting coal feeder
Maintain cleaning CD Pump & area

detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: Slag roller 1&2
Cleanning boiler operating flor; coal spillage after preventive pocking
Maintain cleaning of equipments: MRF 1&2; SAF 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: Slag roller 1&2

detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: Slag roller 1&2; CDT #1&2
Cleaning ID Fan & Pa Fan 1&2

Cleaning coal ex pocking ducting coal feeder


Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1& 2

detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: Slag roller 1&2; CDT #1&2;SAF#1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: IDF 1&2; PAF 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1& 2

detail activities
Cleaning boiler ground floor area
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP#1&2, slag cooler 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: CDPump 1&2; SAF 1&2
Cleaning PA Fan 1&2
Cleaning coal ex pocking ducting coal feeder

detail activities
OFF
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP#3&4
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: CDPump 1&2; Slag roller 1&2
Cleaning PA Fan 1&2
Cleaning coal ex pocking ducting coal feeder

done By
GS crew
Group B
Group C
Group D

done By
GS crew
Group A
Group B
Group C

done By
GS crew
Group A
Group B
Group C

done By
GS crew
Group D
Group A

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
1
1
1
1
1
total:

7
2
1
2
1
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
1
1
1
1
1
total:

7
2
1
2
1
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
1
1
1
1
1
total:

2
1
2
1
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2

1
1
1

2
1
2

Group A
Group B

done By
GS crew
Group D
Group A
Group B

done By
GS crew
Group C
Group D
Group A

done By

Group C
Group D
Group A

1
2
1

1
1
1
total:

1
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
1
1
1
1
1
total:

7
2
1
2
1
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
1
3

1
1
1
1
1
1
total:

4
2
1
2
1
1
3
14

Man power Duration Total Duration


(persons)
(hours)
(hours)

2
1
2
1
1
2

1
1
1
1
1
1
total:

TOTAL WEEK 36:

2
1
2
1
1
2
9

103

Cleaning Record per wee


Monday
Date

Shift
General
Shift 1

12-Sep-16
Shift-2
Shift 3

Tuesday
Date

Shift
General
Shift 1

13-Sep-16
Shift-2
Shift 3

Wednesday
Date

Shift
GS
Shift 1

14/09/2016
Shift-2
Shift-3

Thursday
Date

Shift
GS
Shift 1

15/09/2016
Shift 2

15/09/2016
Shift 2
Shift-3

Friday
Date

Shift
GS
Shift 1

9/16/2016
Shift-2
Shift-3

Saturday
Date

Shift
GS
Shift 1

9/17/2016
Shift-2
Shift-3

Sunday
Date

Shift
General
Shift 1

September 18, 2016

Shift 2
shift 3

Cleaning Record per week


detail activities
Holiday Idul Adha
Cleaning IDFan 1&2; PAFan 1&2
Cleanifng coal ex pocking ducting coal feeder
Cleanning boiler operating flor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1&2; SAF 1&2
Cleanning boiler operating flor; coal spillage after preventive pocking
Maintain cleaning equipment: slag cooler&CDT both units

detail activities
Cleaning boiler ground floor area
Cleaning IDFan 1&2; PAFan 1&2
Cleanifng coal ex pocking ducting coal feeder
Cleanning boiler operating flor; coal spillage after preventive pocking
Maintain cleaning equipments: SA fan 1&2
Cleanning boiler operating flor; coal spillage after preventive pocking
Maintain cleaning equipment: slag cooler&CDT both units

detail activities
Cleaning area slag cooler
Cleaning PA Fan ,ID Fan 1&2
Cleaning coal ex pocking ducting coal feeder
Cleanning boiler operating flor; coal spillage after preventive pocking
Maintain cleaning equipments: SAF 1&2
Cleanning boiler operating flor; coal spillage after preventive pocking
Maintain cleaning equipments: slag roller 1&2; MRFan 1&2

detail activities
Cleaning area slag cooler
Cleaning PA Fan , ID Fan 1&2
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder

Maintain cleaning equipments: Clean drain pump


Cleanning boiler operating flor; coal spillage after preventive pocking
Maintain cleaning equipments: slag roller 1&2; MRFan 1&2

detail activities
Cleaning area slag cooler
Cleaning slag cooler&CDT, SAF , MRF both units
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2
Cleaning coal ex pocking ducting coal feeder
Cleanning boiler operating flor; coal spillage after preventive pocking
Maintain cleaning equipments: MRFan 1&2

detail activities
Cleaning area slag cooler
Cleaning slag cooler&CDT, SAF , both units
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2
Cleaning coal ex pocking ducting coal feeder
Cleanning boiler operating flor; coal spillage after preventive pocking

detail activities
Of
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: Slag roller 1&2
Cleaning slag cooler&CDT both units
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2
Cleaning coal ex pocking ducting coal feeder

done By

Group B
Group C
Group D

done By
GS crew
Group B
Group C
Group D

done By
GS crew
Group A
Group B
Group C

done By
GS crew
Group A
Group B

Man power Duration Total Duration


(persons)
(hours)
(hours)

2
1
2
1
2
1

1
1
1
1
1
1
total:

2
1
2
1
2
1
9

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
1
1
1
1
1
total:

7
2
1
2
1
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
3
2
1
2
1

1
1
1
1
1
1
total:

1
3
2
1
2
1
17

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
3
2

1
1
1

1
3
2

Group B
Group C

done By
GS crew
Group D
Group A
Group B

done By
GS crew
Group D
Group A
Group B

1
2
1

1
1
1
total:

Group C
Group D
Group A

17

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
1
2
1
2
2
1

7
1
1
1
1
1
0.5
total:

7
1
2
1
2
2
0.5
15.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
2
1
2
2

1
1
1
1
1

1
2
1
2
2

total:

done By

1
2
1

15

Man power Duration Total Duration


(persons)
(hours)
(hours)

2
1
1
2
1
2

1
1
1
1
1
1
total:

TOTAL WEEK 37:

2
1
1
2
1
2
9

98.5

Cleaning Record per we


Monday
Date

Shift
General
Shift 1

September 19, 2016


Shift 2
shift 3

Tuesday
Date

Shift
General
Shift 1

September 20, 2016


Shift 2
Shift 3

Wednesday
Date

Shift
General
Shift 1

September 21, 2016


Shift 2
Shift 3

Thursday
Date

Shift
General
Shift 1

September 22, 2016


Shift 2

September 22, 2016


Shift 2
Shift 3

Friday
Date

Shift
General
Shift 1

September 23, 2016


Shift 2
Shift 3

Saturday
Date

Shift

Shift 1
September 24, 2016
Shift 2
Shift 3

Sunday
Date

Shift

Shift 1
September 25, 2016
Shift 2
Shift 3

Cleaning Record per week


detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: IDF 1&2; PAF 1& 2
Cleaning slag cooler&CDT both units
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: SAF
Cleaning slag cooler&CDT both units
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF 1&2
Cleaning slag cooler&CDT both units
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor
Cleaning coal ex pocking ducting coal feeder
Cleaning PA fan 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking

Maintain cleaning equipments: MRF


Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF 1&2

detail activities
Cleaning boiler ground floor
Cleaning coal ex pocking ducting coal feeder
Cleaning PA fan 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: SAF 1, 2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF 1&2; MRF 1&2

detail activities

Cleaning CDT both units


Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning clean drain tank & slac cooler 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments:MRF 1&2

detail activities

Cleaning CDT & Slag cooler both units


Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments:SAF 1 & 2

done By
GS crew
Group C
Group D
Group A

done By
GS crew
Group B
Group C
Group D

done By
GS crew
Group B
Group C
Group D

done By
GS crew
Group A
Group B

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
1
2
1
2

1
1
1
1
1
1
total:

7
2
1
1
2
1
2
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
1
2

1
1
1
1
1
1
total:

7
2
1
2
1
1
2
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
1
1

1
1
1
1
1
1
total:

7
2
1
2
1
1
1
15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2

1
1
1

2
1
2

Group B
Group C

done By
GS crew
Group A
Group B
Group C

done By

Group D
Group A
Group B

done By

Group D
Group A
Group B

1
2
1

1
1
1
total:

1
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
1
1
1
1
1
total:

7
2
1
2
1
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)

1
1
2
1
2
1

1
1
1
1
1
0.5
total:

1
1
2
1
2
0.5
7.5

Man power Duration Total Duration


(persons)
(hours)
(hours)

1
1
2
1
2
1

1
1
1
1
1
1
total:

TOTAL WEEK 38:

1
1
2
1
2
1
8

94.5

Cleaning Record per we


Monday
Date

Shift
General
Shift 1

26-Sep-16
Shift 2
Shift 2

Tuesday
Date

Shift
General
Shift 1

27-Sep-16
Shift 2
Shift 2

Wednesday
Date

Shift
General
Shift 1

28-Sep-16
Shift 2
Shift 3

Thursday
Date

Shift
General
Shift 1

29-Sep-16
Shift 2

29-Sep-16
Shift 2
Shift 3

Friday
Date

Shift
General
Shift 1

30-Sep-16
Shift 2
Shift 3

Saturday
Date

Shift
General
Shift 1

01 Okt 2016
Shift 2
Shift 3

Sunday
Date

Shift
General
Shift 1

02 Okt 2016
Shift 2
Shift 3

Cleaning Record per week


detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 1&3
Cleaning CDT, SAF & Slag cooler both units
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 1&3; SA Fan 1&2
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning slag cooler & clean drain tank

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1, 2, SAF 1, 2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: Slag cooler 1&2
Cleaning CDT & Slag cooler both units
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1, 2, SAF 1, 2
Cleaning boiler operating floor; coal spillage after preventive pocking

Maintain cleaning equipments: Slag cooler 1&2


Cleaning CDT & Slag cooler both units
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAFAN 1,2 & IDFAN 1,2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1, 2,
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: Slag cooler 1&2

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAFAN 1,2 & IDFAN 1,2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1, 2,
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: Slag cooler 1&2

detail activities
Cleaning boiler ground floor
Cleaning CDT & Slag cooler both units
Cleaning coal ex pocking ducting coal feeder
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1, 2,
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: SA FAN 1, 2

done By
GS crew
Group C
Group D
Group A

done By
GS crew
Group C
Group D
Group A

done By
GS crew
Group B
Group C
Group D

done By
GS crew
Group B
Group C

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
1
1
2
1

1
1
1
1
1
1
total:

1
1
1
1
2
1
14

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1

1
1

1
1

1
2
1

1
1
1
total:

1
2
1
13

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
1
1
1
1

1
1
1
1
1
1
total:

7
1
1
1
1
1
1
13

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
1

1
1
1

1
1
1

Group C
Group D

done By
GS crew
Group A
Group B
Group C

done By
GS crew
Group A
Group B
Group C

done By
GS crew
Group D
Group A
Group B

1
1
1

1
1
1
total:

1
1
1
13

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
1
1
1
1

1
1
1
1
1
1
total:

7
1
1
1
1
1
1
13

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
1
1
1
1

1
1
1
1
1
1
total:

7
1
1
1
1
1
1
13

Man power Duration Total Duration


(persons)
(hours)
(hours)
7

1
1
1
1
1
1

1
1
1
1
1
1
total:

1
1
1
1
1
1
13

TOTAL WEEK 39:

92

Cleaning Record per wee


Monday
Date

Shift
General
Shift 1

10/3/2016
Shift 2
Shift 3

Tuesday
Date

Shift
General
Shift 1

10/4/2016
Shift2
Shift 3

Wednesday
Date

Shift
General
Shift 1

10/5/2016
Shift2
Shift 3

Thursday
Date

Shift
General
Shift 1

10/6/2016
Shift 2

10/6/2016
Shift 2
Shift3

Friday
Date

Shift
General
Shift 1

7-Oct-16
Shift 2
Shift3

Saturday
Date

Shift
General
Shift 1

8-Oct-16
Shift 2
Shift 3

Sunday
Date

Shift
General
Shift 1

9-Oct-16
Shift 2
Shift 3

Cleaning Record per week


detail activities
Cleaning boiler ground floor
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning

CDT & Slag cooler both units


coal ex pocking ducting coal feeder
coal ex pocking ducting coal feeder
slag cooler & clean drain tank
coal ex pocking ducting coal feeder
MRF 1, 2

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 2&4; MRFan 1&2
Cleaning CDT & Slag cooler both units
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 1&3; CDPump 1&2
Cleaning CDT & Slag cooler both units
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1, 2
Cleaning boiler operating floor; coal spillage after preventive pocking

Maintain cleaning equipments: BFWP 2&4; SAFan 1&2


Cleaning CDT & Slag cooler both units
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: SAF 1, 2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAFan 1&2; SAFan 1&2
Cleaning CDT & Slag cooler both units
Cleaning coal ex pocking ducting coal feeder

detail activities
GS of
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1, 2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: Slag cooler 1&2

detail activities
GS of
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: SAF 1, 2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: Slag cooler 1&2

done By
GS crew
Group D
Group A
Group B

done By
GS crew
Group C
Group D
Group A

done By
GS crew
Group C
Group D
Group A

done By
GS crew
Group B
Group C

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
1
1
2
1
1
1

7
1
1
1
1
1
0.5
total:

7
1
1
2
1
1
0.5
13.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
1
1
2
1

1
1
1
1
1
1
total:

7
1
1
1
1
2
1
14

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
1
1
2
1

1
1
1
1
1
1
total:

7
1
1
1
1
2
1
14

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
1

1
1
1

1
1
1

Group C
Group D

done By
GS crew
Group B
Group C
Group D

done By

Group A
Group B
Group C

done By

Group A
Group B
Group C

1
1
1

1
1
1
total:

1
1
1
13

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
1
1
1
1

1
1
1
1
1
1
total:

7
1
1
1
1
1
1
13

Man power Duration Total Duration


(persons)
(hours)
(hours)

2
1
1
1
1
1

1
1
1
1
1
1
total:

2
1
1
1
1
1
7

Man power Duration Total Duration


(persons)
(hours)
(hours)

2
1
1
1
1
1

1
1
1
1
1
1
total:

TOTAL WEEK 40:

2
1
1
1
1
1
7

81.5

Cleaning Record per week


Monday
Date

Shift
General
Shift 1

10/10/2016
Shift 2
Shift 3

Tuesday
Date

Shift
General
Shift 1

10/11/2016
Shift 2
Shift 3

Wednesday
Date

Shift
General
Shift 1

10/12/2016
Shift 2
Shift 3

Thursday
Date

Shift
General

10/13/2016

Shift 1
10/13/2016
Shift 2
Shift 3

Friday
Date

Shift
General
Shift 1

10/14/2016
Shift 2
Shift 2

Saturday
Date

Shift
General
Shift 1

10/15/2016
Shift 2
Shift 2

Sunday
Date

Shift
General
Shift1

10/16/2016
Shift 2
Shift 3

Cleaning Record per week


detail activities
Cleaning boiler ground floor

GS crew

Cleaning boiler operating floor; coal spillage after preventive pocking


Maintain cleaning equipments: CDT 1&2;Slag cooler 1& 2
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: SAF 1, 2

detail activities
Cleaning boiler ground floor

Group D
Group A
Group B

done By
GS crew

Cleaning boiler operating floor; coal spillage after preventive pocking


Maintain cleaning equipments: CDT 1&2;Slag cooler 1& 2
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1, 2

detail activities
Cleaning boiler ground floor

Group D
Group A
Group B

done By
GS crew

Cleaning boiler operating floor; coal spillage after preventive pocking


Maintain cleaning equipments: PAFan 1& 2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: CDT 1&2;Slag cooler 1& 2
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2

detail activities
Cleaning boiler ground floor

done By

Group C
Group D
Group A

done By
GS crew

Cleaning boiler operating floor; coal spillage after preventive pocking


Maintain cleaning equipments: BFWP 1&3; slag cooler
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: CDT 1&2;Slag cooler 1& 2
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2

detail activities
Cleaning boiler ground floor

Group C
Group D
Group A

done By
GS crew

Cleaning boiler operating floor; coal spillage after preventive pocking


Maintain cleaning equipments: MRF 1, 2 & SAF 1, 2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 1&3
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: CDT 1&2;Slag cooler 1& 2

detail activities
Cleaning boiler ground floor

Group B
Group C
Group D

done By
GS crew

Cleaning boiler operating floor; coal spillage after preventive pocking


Maintain cleaning equipments: SAF 1, 2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 1&3
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: CDT 1&2;Slag cooler 1& 2

detail activities
Cleaning boiler ground floor
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1, 2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 1&3

Group B
Group C
Group D

done By
GS crew
Group A
Group B
Group C

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
1
1
1
1
1
Total

7
2
1
2
1
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
1
1
1
1
1
Total

7
2
1
2
1
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
2
1
2
1

1
1
1
1
1
1
Total

7
1
1
2
1
2
1
15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
2
1
2
1

1
1
1
1
1
1
Total

1
1
2
1
2
1
15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
1
1
2
1

1
1
1
1
1
1
Total

7
1
1
1
1
2
1
14

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
1
1
2
1

1
1
1
1
1
1
Total

7
1
1
1
1
2
1
14

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
1
1
1
1

1
1
1
1
1
1
Total

7
2
1
1
1
1
1
14

TOTAL WEEK 41:

104

Cleaning Record per wee


Monday
Date

Shift
General
Shift 1

10/17/2016
Shift 2
Shift 3

Tuesday
Date

Shift
General
Shift 1

10/18/2016
Shift 2
Shift 3

Wednesday
Date

Shift
General
Shift 1

10/19/2019

Shift 2
Shift 3

Thursday
Date

Shift
General

10/20/2016

Shift 1
10/20/2016
Shift 2
Shift 3

Friday
Date

Shift
General
Shift 1

10/21/2016
Shift 2
Shift 3

Saturday
Date

Shift
General
Shift 1

10/22/2016
Shift 2
Shift 3

Sunday
Date

Shift
of
Shift 1

10/23/2016
Shift 2
Shift 3

Cleaning Record per week


detail activities
Cleaning boiler ground floor
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan 1&2
Cleaning coal ex pocking ducting coal feeder
Cleaning SA Fan 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: IDF 1, 2

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: CDT 1&2;Slag cooler 1& 2
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan , SA Fan 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: SAF 1, 2

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: CDT 1&2;Slag cooler 1& 2
Cleaning coal ex pocking ducting coal feeder
Cleaning ID Fan 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1, 2

detail activities
Cleaning boiler ground floor (lot of slag spillage ex bed material blowing)

Cleaning boiler operating floor; coal spillage after preventive pocking


Maintain cleaning equipments: BFWP 2 & 4
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: CDT 1&2;Slag cooler 1& 2
Cleaning coal ex pocking ducting coal feeder
Cleaning Clean drain tank & slag cooler area

detail activities
Cleaning boiler ground floor (lot of slag spillage ex bed material blowing)
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 2 & 4 & SAF 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF 1&2; Slag Cooler 1&2
Cleaning coal ex pocking ducting coal feeder
Cleaning Clean drain tank & slag cooler area

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1& 2; SAF 1 & 2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 2&4; Slag Cooler 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: CDT both units

detail activities

Cleaning boiler operating floor; coal spillage after preventive pocking


Maintain cleaning equipments: SAF 1 & 2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 2&4; Slag Cooler 1&2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: CDT both units&slag cooler

done By
GS crew
Group A
Group B
Group C

done By
GS crew
Group D
Group A
Group B

done By
GS crew
Group D
Group A
Group B

done By
GS crew

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
1
1
1
1
1
TOTAL

7
2
1
2
1
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
1
1
1
1
1
TOTAL

7
2
1
2
1
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
2
1

1
1
1
1
1
1
TOTAL

7
2
1
2
1
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
2

14

Group C
Group D
Group A

done By
GS crew
Group C
Group D
Group A

done By
GS crew
Group B
Group C
Group D

done By

Group B
Group C
Group D

1
1
2
1
2
1

1
1
1
1
1
1
TOTAL

1
1
2
1
2
1
22

Man power Duration Total Duration


(persons)
(hours)
(hours)
2

14

1
1
2
1
2
1

1
1
1
1
1
1

1
1
2
1
2
1
22

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
1
1
1
1

1
1
1
1
1
1

1
1
1
1
2
1
14

Man power Duration Total Duration


(persons)
(hours)
(hours)

1
1
1
1
1
1

1
1
1
1
1
1

1
1
1
1
2
1
7

TOTAL WEEK 42:

113

Cleaning Record per wee


Monday
Date

Shift
General
Shift 1

10/24/2016
Shift 2
Shift 3

Tuesday
Date

Shift
General
Shift 1

10/25/2016
Shift 2
Shift 3

Wednesday
Date

Shift
General
Shift1

10/26/2016
Shift 2
Shift 3

Thursday
Date

Shift
General
Shift1

10/27/2016
Shift 2

10/27/2016
Shift 2
Shift 3

Friday
Date

Shift
General
Shift 1

10/28/2016
Shift2
Shift 3

Saturday
Date

Shift
General
Shift 1

10/29/2016
Shift2
Shift 3

Sunday
Date

Shift
General
Shift 1

10/30/2016
Shift 2
Shift3

Cleaning Record per week


detail activities
Cleaning boiler ground floor
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: SAF 1 & 2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 1&3; Slag Cooler 1&2

detail activities
Cleaning boiler ground floor
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1 & 2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 1&3; Slag Cooler 1&2

detail activities
Cleaning boiler ground floor
Cleaning CDT, MRF
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: SAF 1& 2

detail activities
Cleaning boiler ground floor
Cleaning CDT
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder

Cleaning PA Fan & ID Fan


Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1 & 2

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 1&3; SAF 1&2
Cleaning CDT, slag cooler
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 1&3; Slag Cooler 1&2
Cleaning CDT, slag cooler
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan

detail activities
(GS of)
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: SAF 1 & 2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 1&4; SAF 1&2
Cleaning CDT, slag cooler
Cleaning coal ex pocking ducting coal feeder

done By
GS crew
Group A
Group B
Group C

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
1
1
1
1

1
1
1
1
1
1

2
1
1
1
1
1
14

Total

done By
GS crew
Group A
Group B
Group C

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
1
1
1
1

1
1
1
1
1
1

2
1
1
1
1
1
14

Total

done By
GS crew
Group D
Group A
Group B

done By
GS crew
Group D
Group A

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
1
1
2
1
1
1

7
1.5
1
1
1
1
1
Total

7
1.5
1
2
1
1
1
14.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
2

1.5
1
1

1.5
1
2

Group A
Group B

1
1
1

1
1
1
Total

done By
GS crew
Group C
Group D
Group A

done By
GS crew
Group C
Group D
Group A

done By

Group B
Group C
Group D

1
1
1
14.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
1
1
1
1
2
1

1
1
1.5
1
1
1
Total

1
1
1.5
1
2
1
14.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
1
1
1
1
2
1

1
1
1.5
1
1
1
Total

1
1
1.5
1
2
1
14.5

Man power Duration Total Duration


(persons)
(hours)
(hours)

1
1
1
1
1
1

1
1
1
1
1
1
Total

TOTAL WEEK 43:

1
1
1
1
1
1
6

92

Cleaning Record per wee


Monday
Date

Shift
General
Shift 1

10/31/2016
Shift3
Shift 3

Tuesday
Date

Shift
General
Shift 1

11/1/2016
Shift 2
Shift 3

Wednesday
Date

Shift
General
Shift1

11/2/2016
Shift 2
Shift3

Thursday
Date

Shift
General
Shift1

11/3/2016
Shift 2

11/3/2016
Shift 2
Shift 3

Friday
Date

Shift
General
Shift 1

11/4/2016
Shift2
Shift 3

Saturday
Date

Shift
General
Shift 1

11/5/2016
Shift2
Shift 3

Sunday
Date

Shift
General
Shift 1

11/6/2016
Shift 2
Shift3

Cleaning Record per week


detail activities
Cleaning boiler ground floor
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan
Cleaning PAF 1,2
Cleaning coal ex pocking ducting coal feeder
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: Slag cooler 1&2

detail activities
Cleaning boiler ground floor
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan
Cleaning SAF 1, 2
Cleaning coal ex pocking ducting coal feeder
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: Slag cooler 1&2

detail activities
Cleaning boiler ground floor
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning

CDT, slag cooler


coal ex pocking ducting coal feeder
coal ex pocking ducting coal feeder
PA Fan & ID Fan
MRF 1,2
coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor
Cleaning CDT, slag cooler
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder

Cleaning PA Fan & ID Fan


Cleaning coal ex pocking ducting coal feeder
Cleaning MRF 1, 2

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF 1&2; SAF 1&2
Cleaning CDT, slag cooler
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan

detail activities
Cleaning boiler ground floor (limestone silo area)
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF 1&2; SAF 1&2
Cleaning CDT, slag cooler
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan

detail activities
Cleaning boiler ground floor (limestone silo area)
Cleaning coal ex pocking ducting coal feeder
Cleaning SA F 1, 2
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: MRF 1&2
Cleaning CDT, slag cooler
Cleaning coal ex pocking ducting coal feeder

done By
GS crew
Group A
Group B
Group C

done By
GS crew
Group A
Group B
Group C

done By
GS crew
Group D
Group A
Group B

done By
GS crew
Group D
Group A

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
1
1
1
1

1
1
1
1
1
1

2
1
1
1
1
1
14

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
1
1
1
1

1
1
1
1
1
1

2
1
1
1
1
1
14

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
2
1
1
1

1.5
1
1
1
1
1

1.5
1
2
1
1
1
14.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
2

1.5
1
1

1.5
1
2

Group A
Group B

done By
GS crew
Group C
Group D
Group A

done By
GS crew
Group C
Group D
Group A

done By
GS crew
Group B
Group C
Group D

1
2
1

1
1
1

1
2
1
15.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
1
1
2
1

1
1
1.5
1
1
1

1
1
1.5
1
2
1
14.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
1
1
2
1

1
1
1.5
1
1
1

1
1
1.5
1
2
1
14.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
1
1
1
1

1
1
1
1
1.5
1

2
1
1
1
1.5
1
14.5

TOTAL WEEK 44:

101.5

Cleaning Record per wee


Monday
Date

Shift
General
Shift 1

11/7/2016
Shift 2
Shift3

Tuesday
Date

Shift
General
Shift 1

11/8/2016
Shift 2
Shift3

Wednesday
Date

Shift
General
Shift 1

11/9/2016
Shift 2
Shift3

Thursday
Date

Shift
General
Shift 1

11/10/2016
Shift 2

11/10/2016
Shift 2
Shift3

Friday
Date

Shift
General
Shift 1

11/11/2016
Shift 2
Shift3

Saturday
Date

Shift
General
Shift 1

11/12/2016
Shift 2
Shift3

Sunday
Date

Shift
General
Shift 1

11/13/2016
Shift 2
Shift 3

Cleaning Record per week


detail activities
Cleaning boiler ground floor
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning

coal ex pocking ducting coal feeder


PA Fan & ID Fan
coal ex pocking ducting coal feeder
PA Fan & ID Fan
CDT, slag cooler
coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning

coal ex pocking ducting coal feeder


PA Fan & ID Fan
coal ex pocking ducting coal feeder
PA Fan & ID Fan
CDT, slag cooler
coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning

coal ex pocking ducting coal feeder


PA Fan & ID Fan
coal ex pocking ducting coal feeder
PA Fan & ID Fan
CDT, slag cooler
coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan
Cleaning coal ex pocking ducting coal feeder

Cleaning PA Fan & ID Fan


Cleaning CDT, slag cooler
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning

CDT, slag cooler


coal ex pocking ducting coal feeder
coal ex pocking ducting coal feeder
PA Fan & ID Fan
coal ex pocking ducting coal feeder
PA Fan & ID Fan

detail activities
Cleaning boiler ground floor (limestone silo area)
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning

CDT, slag cooler


coal ex pocking ducting coal feeder
coal ex pocking ducting coal feeder
PA Fan & ID Fan
coal ex pocking ducting coal feeder
PA Fan & ID Fan

detail activities
Cleaning boiler ground floor (limestone silo area)
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF 1&2; SAF 1&2
Cleaning CDT, slag cooler
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan

done By
GS crew
Group B
Group C
Group D

done By
GS crew
Group B/A
Group C/A
Group D

done By
GS crew
Group A
Group B/A
Group C/D

done By
GS crew
Group A
Group B/A

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
2
1
2
1
1
1

7
1
1
1
1
1.5
1
TOTAL

7
2
1
2
1
1.5
1
15.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
2
1
2
1
1
1

7
1
1
1
1
1.5
1
TOTAL

7
2
1
2
1
1.5
1
15.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
2
1
2
1
1
1

7
1
1
1
1
1.5
1
TOTAL

7
2
1
2
1
1.5
1
15.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2

1
1
1

2
1
2

Group B/A
Group C/D

done By
GS crew
Group D
Group A
Group B

done By
GS crew
Group D
Group A
Group B

done By
GS crew
Group C
Group D
Group A

1
1
1

1
1.5
1
TOTAL

1
1.5
1
15.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
1
1
2
1
2
1

7
1.5
1
1
1
1
1
TOTAL

7
1.5
1
2
1
2
1
15.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
1
1
2
1
2
1

7
1.5
1
1
1
1
1
TOTAL

7
1.5
1
2
1
2
1
15.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
1
1
1
1
2
1

7
1
1
1.5
1
1
1
TOTAL

TOTAL WEEK 45:

7
1
1
1.5
1
2
1
14.5

107.5

Cleaning Record per week


Monday
Date

Shift
General
Shift 1

11/14/2016
Shift 2
Shift3

Tuesday
Date

Shift
General
Shift 1

11/15/2016
Shift 2
Shift3

Wednesday
Date

Shift
General
Shift 1

11/16/2016
Shift 2
Shift3

Thursday
Date

Shift
General

11/17/2016

Shift 1
11/17/2016
Shift 2
Shift3

Friday
Date

Shift
General
Shift 1

11/18/2016
Shift 2
Shift3

Saturday
Date

Shift
General
Shift 1

11/19/2016
Shift 2
Shift3

Sunday
Date

Shift
General
Shift 1

11/20/2016
Shift 2
Shift3

Cleaning Record per week


detail activities
Cleaning boiler ground floor

GS crew

Cleaning boiler operating floor; coal spillage after preventive pocking


Maintain cleaning equipments: PAF 1&2; SAF 1&2
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan
Cleaning CDT, slag cooler
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor

Group C
Group D
Group A

done By
GS crew

Cleaning coal ex pocking ducting coal feeder


Cleaning PA Fan & ID Fan
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF 1&2; SAF 1&2
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan

detail activities
Cleaning boiler ground floor

Group B
Group C
Group D

done By
GS crew

Cleaning coal ex pocking ducting coal feeder


Cleaning PA Fan & ID Fan
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF 1&2; SAF 1&2
Cleaning CDT, slag cooler
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor

done By

Group B
Group C
Group D

done By
GS crew

Cleaning coal ex pocking ducting coal feeder


Cleaning PA Fan & ID Fan
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF 1&2; SAF 1&2

detail activities
Cleaning boiler ground floor

Group B
Group C

done By
GS crew

Cleaning coal ex pocking ducting coal feeder


Cleaning PA Fan & ID Fan
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF 1&2; SAF 1&2

detail activities
Cleaning boiler ground floor (limestone silo area)
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning

Group A

CDT, slag cooler


coal ex pocking ducting coal feeder
coal ex pocking ducting coal feeder
PA Fan & ID Fan
coal ex pocking ducting coal feeder
PA Fan & ID Fan

detail activities

Group A
Group B
Group C

done By
GS crew
Group D
Group A
Group B

done By

GS OFF
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning

CDT, slag cooler


coal ex pocking ducting coal feeder
coal ex pocking ducting coal feeder
PA Fan & ID Fan
coal ex pocking ducting coal feeder
PA Fan & ID Fan

Group D
Group A
Group B

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
1
1
2
1
1
1

7
1
1
1
1
1.5
1
Total

7
1
1
2
1
1.5
1
14.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
1
1
2
1

1
1
1
1
1
1
Total

7
2
1
1
1
2
1
15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
2
1
2
1
1
1

7
1
1
1
1
1.5
1
Total

7
2
1
2
1
1.5
1
15.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
1
1

1
1
1
1
1
1
Total

2
1
2
1
1
1
15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
2
1
1
1

1
1
1
1
1
1
Total

7
2
1
2
1
1
1
15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1
1
1
2
1
2
1

7
1.5
1
1
1
1
1
Total

7
1.5
1
2
1
2
1
15.5

Man power Duration Total Duration


(persons)
(hours)
(hours)

1
1
2
1
2
1

1.5
1
1
1
1
1
Total

1.5
1
2
1
2
1
8.5

TOTAL WEEK 46:

99

Cleaning Record per wee


Monday
Date

Shift
General
Shift 1

11/21/2016
Shift2
Shift 3

Tuesday
Date

Shift
General
Shift 1

11/22/2016
Shift2
Shift 3

Wednesday
Date

Shift
General
Shift1

11/23/2016
Shift 2
Shift 3

Thursday
Date

Shift
General
Shift1

11/24/2016
Shift 2

11/24/2016
Shift 2
Shift 3

Friday
Date

Shift
General
Shift 1

11/25/2016
Shift2
Shift 3

Saturday
Date

Shift
General
Shift 1

11/26/2016
Shift2
Shift 3

Sunday
Date

Shift

Shift 1
11/27/2016
Shift 2
Shift 3

Cleaning Record per week


detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 1&3; CDPump 1&2
Cleaning CDT, slag cooler
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan

detail activities
Cleaning boiler ground floor
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 1&3; SA Fan 1&2
Cleaning CDT, slag cooler
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan

detail activities
Cleaning boiler ground floor
Cleaning MRF 1, 2
Cleaning coal ex pocking ducting coal feeder
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: Slag cooler 1&2
Cleaning CDT & Slag cooler both units
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor
Cleaning SAF 1, 2
Cleaning coal ex pocking ducting coal feeder
Cleaning boiler operating floor; coal spillage after preventive pocking

Maintain cleaning equipments: Slag cooler 1&2


Cleaning CDT & Slag cooler both units
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan
Cleaning SAF 1, 2
Cleaning coal ex pocking ducting coal feeder
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: IDF (1&2); BFWP (1&3)

detail activities
Cleaning boiler ground floor
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan
Cleaning MRF 1, 2
Cleaning coal ex pocking ducting coal feeder
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: PAF 1&2; BFWP (1&3)

detail activities

Cleaning
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning

CDT & Slag cooler both units


coal ex pocking ducting coal feeder
coal ex pocking ducting coal feeder
PA Fan & ID Fan
MRF 1, 2, DRAIN PUMP
coal ex pocking ducting coal feeder

done By
GS crew
Group C
Group D
Group A

done By
GS crew
Group C
Group D
Group A

done By
GS crew
Group B
Group C
Group D/C

done By
GS crew
Group B
Group C

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
1
1
2
1

1
1
1.5
1
1
1

2
1
1.5
1
2
1
15.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
1
1
2
1

1
1
1.5
1
1
1

2
1
1.5
1
2
1
15.5

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
2
1
2
1

1
1
1
1
1
1

1
1
2
1
2
1
15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

1
1
2

1
1
1

1
1
2

Group C
Group D/C

done By
GS crew
Group A
Group B
Group C

done By
GS crew
Group A
Group B
Group C

done By

Group D
Group A
Group B

1
2
1

1
1
1

1
2
1
15

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
1
2
2
1

1
1
1
1
1
1

2
1
1
2
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
1
2
2
1

1
1
1
1
1
1

2
1
1
2
2
1
16

Man power Duration Total Duration


(persons)
(hours)
(hours)

2
1
2
1
1
2

1
1
1
1
1
1

TOTAL WEEK 47:

2
1
2
1
1
2
9

102

Cleaning Record per wee


Monday
Date

Shift
General
Shift 1

11/28/2016
Shift 2
Shift 3

Tuesday
Date

Shift
General
Shift 1

11/29/2016
Shift 2
Shift 2

Wednesday
Date

Shift
General
Shift 1

11/30/2016
Shift 2
Shift 2

Thursday
Date

Shift
General
Shift 1

12/1/2016
Shift 2

12/1/2016
Shift 2
Shift 3

Friday
Date

Shift
General
Shift 1

12/2/2016
Shift 2
Shift 3

Saturday
Date

Shift
General
Shift 1

12/3/2016
Shift 2
Shift 3

Sunday
Date

Shift
General
Shift 1

12/4/2016
Shift 2

Cleaning Record per week


detail activities
Cleaning boiler ground floor, lot of sand ex pocking bed ash drain pipe
& cleaning boiler operating floor (lot of coal spilage ex pocking feeder)
Cleaning CDT & Slag cooler both units
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan
Cleaning MRF 1, 2
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor, lot of sand ex pocking bed ash drain pipe
& cleaning boiler operating floor (lot of coal spilage ex pocking feeder)
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 2&4; slag cooler 1&2, PAF 1&2
Cleaning CDT & Slag cooler both units
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan

detail activities
Cleaning boiler ground floor, lot of sand ex pocking bed ash drain pipe
& cleaning boiler operating floor (lot of coal spilage ex pocking feeder)
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 2&4; slag cooler 1&2
Cleaning CDT & Slag cooler both units
Cleaning coal ex pocking ducting coal feeder
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan

detail activities
Cleaning boiler ground floor, lot of sand ex pocking bed ash drain pipe
& cleaning boiler operating floor (lot of coal spilage ex pocking feeder)
Cleaning SAF 1, 2
Cleaning coal ex pocking ducting coal feeder
Cleaning boiler operating floor; coal spillage after preventive pocking

Maintain cleaning equipments: BFWP 2&4; IDF 1&2


Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor, lot of sand ex pocking bed ash drain pipe
& cleaning boiler operating floor (lot of coal spilage ex pocking feeder)
Cleaning MRF 1, 2
Cleaning coal ex pocking ducting coal feeder
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 2&4; SAF 1&2
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor, lot of sand ex pocking bed ash drain pipe
& cleaning boiler operating floor (lot of coal spilage ex pocking feeder)
Cleaning coal ex pocking ducting coal feeder
Cleaning PA Fan & ID Fan
Cleaning SAF 1, 2
Cleaning coal ex pocking ducting coal feeder
Cleaning boiler operating floor; coal spillage after preventive pocking
Maintain cleaning equipments: BFWP 2&4; Slag coller 1&2

detail activities
OFF
Cleaning
Cleaning
Cleaning
Cleaning

coal ex pocking ducting coal feeder


PA Fan & ID Fan
MRF 1, 2
coal ex pocking ducting coal feeder

done By
GS crew
Group D
Group A
Group B

done By
GS crew
Group C
Group D
Group A

done By
GS crew
Group C
Group D
Group A

done By
GS crew
Group B
Group C

Man power Duration Total Duration


(persons)
(hours)
(hours)
3

21

2
1
2
1
1
1

1
1
1
1
1
1

2
1
2
1
1
1
29

Man power Duration Total Duration


(persons)
(hours)
(hours)
3

21

2
2
2
1
2
1

1
1
1
1
1
1

2
2
2
1
2
1
31

Man power Duration Total Duration


(persons)
(hours)
(hours)
3

21

2
2
2
1
2
1

1
1
1
1
1
1

2
2
2
1
2
1
31

Man power Duration Total Duration


(persons)
(hours)
(hours)
2

14

1
1
2

1
1
1

1
1
2

Group C
Group D

done By
GS crew
Group B
Group C
Group D

done By
GS crew
Group A
Group B
Group C

done By

Group A
Group B

1
20

Man power Duration Total Duration


(persons)
(hours)
(hours)
2

14

1
1
2
1

1
1
1
1

1
1
2
1

1
20

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

2
1
1
1
1
1

1
1
1
1
1
1

2
1
1
1
1
1
14

Man power Duration Total Duration


(persons)
(hours)
(hours)

2
1
1
1

1
1
1
1

2
1
1
1

TOTAL WEEK 48:

150

Cleaning Record per wee


Monday
Date

Shift
General
Shift 1

12/5/2016

Shift 3

Tuesday
Date

Shift
General
Shift 1

12/6/2016

Shift 3

Wednesday
Date

Shift

12/7/2016

Shift 3

Thursday
Date

Shift

Friday
Date

Shift

Saturday
Date

Shift

Sunday
Date

Shift

Cleaning Record per week


detail activities
Cleaning boiler ground floor, lot of sand ex pocking bed ash drain pipe
& cleaning boiler operating floor (lot of coal spilage ex pocking feeder)
Cleaning CDT & Slag cooler both units
Cleaning coal ex pocking ducting coal feeder

Cleaning SAF 1, 2
Cleaning coal ex pocking ducting coal feeder

detail activities
Cleaning boiler ground floor, lot of sand ex pocking bed ash drain pipe
& cleaning boiler operating floor (lot of coal spilage ex pocking feeder)
Cleaning CDT & Slag cooler both units
Cleaning coal ex pocking ducting coal feeder

Cleaning MRF 1, 2
Cleaning coal ex pocking ducting coal feeder

detail activities

Cleaning coal ex pocking ducting coal feeder

detail activities

detail activities

detail activities

detail activities

done By

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

Group D

2
1

1
1

2
1

Group B

1
1

1
2

1
2
13

GS crew

done By

Man power Duration Total Duration


(persons)
(hours)
(hours)
1

Group D

2
1

1
1

2
1

Group B

1
1

1
2

1
2
13

GS crew

done By

Group A

done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

1
1

Man power Duration Total Duration


(persons)
(hours)
(hours)

0
done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

0
done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

0
done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

TOTAL WEEK 49:

27

Cleaning Record per wee


Monday
Date

Shift

Tuesday
Date

Shift

Wednesday
Date

Shift

Thursday
Date

Shift

Friday
Date

Shift

Saturday
Date

Shift

Sunday
Date

Shift

Cleaning Record per week


detail activities

detail activities

detail activities

detail activities

detail activities

detail activities

detail activities

done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

0
done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

0
done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

0
done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

0
done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

TOTAL WEEK 50:

Cleaning Record per wee


Monday
Date

Shift

Tuesday
Date

Shift

Wednesday
Date

Shift

Thursday
Date

Shift

Friday
Date

Shift

Saturday
Date

Shift

Sunday
Date

Shift

Cleaning Record per week


detail activities

detail activities

detail activities

detail activities

detail activities

detail activities

detail activities

done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

0
done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

0
done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

0
done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

0
done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

TOTAL WEEK 51:

Cleaning Record per wee


Monday
Date

Shift

Tuesday
Date

Shift

Wednesday
Date

Shift

Thursday
Date

Shift

Friday
Date

Shift

Saturday
Date

Shift

Sunday
Date

Shift

Cleaning Record per week


detail activities

detail activities

detail activities

detail activities

detail activities

detail activities

detail activities

done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

0
done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

0
done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

0
done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

0
done By

Man power Duration Total Duration


(persons)
(hours)
(hours)

TOTAL WEEK 52: