Building contractors in bangalore Item rate Quotation sample for Construction of a House in Bangalore

Giving a contract to a Building contractors in Bangalore on Item rates is only advisable under Architects
/ Engineer s supervision, as one has to Bill frequently based on the Item rates given below. Sample Item
rate Quotations proposed by Building
contractors for the Cost for construction of a houseis mentioned
below.

Sl . No.

DESCRIPTION OF WORK

Unit

Rate

Excavation in hard/ soft soil for

foundation, and removing the


excavated earth to a distance not
exceeding 50 m and with a lift up
to 1. 5 m in hard soil.

Cft

8.00

Providing and laying granite jelly


concrete using 40 mm down size
jelly for
foundation and well
compacted curing etc.
complete in
cement concrete ( 1 : 4
: 8 ).

Cft

70.00

Providing and constructing


granite
or trap size stone masonry with
bond stones 2m apart in each

course including curing etc


complete as per specification in
cement mortar ( 1 : 8).

Cft

90.00

Providing and laying granite or trap

jelly cement concrete using 20 mm


down size including curing
etc.
complete in cement concrete ( 1 : 3
: 6 )for plinth beam.

Cft

150.00

Providing and laying cement


concrete (1:11/2:3) for R.C.C.

Column footing using 20mm and


down size granite jelly with
necessary centering and
shuttering
including machine mixing lifting
laying tamping finishing exposed

faces in cement mortar (1:3)


curing etc , complete (Exclusive of
cost of
steel and fabrication
charges).

Cft

150.00

Providing and laying cement


concrete (1:2:4) for R.C.C. Column
using 20mm and down size
granite jelly with necessary

Cft

150.00

http://architects4design.com/item-rates-construction/[2016/12/8 13:56:06]

Building contractors in bangalore Item rate Quotation sample for Construction of a House in Bangalore

centering and shuttering including


machine mixing lifting laying
tamping finishing exposed faces in
cement mortar (1:3) curing etc ,
complete (Exclusive of cost of
steel and fabrication charges).

Providing and laying cement


concrete (1:2:4) for R.C.C. Beam

using 20mm and down size


granite jelly with necessary
centering and shuttering including
machine mixing lifting laying
tamping finishing exposed faces in
cement mortar (1:3) curing etc ,
complete (Exclusive of cost of
steel and fabrication charges).

Cft

150.00

Providing and constructing


brick
masonry with approved quality of
table moulded modular Bricks of
standard size with necessary
scaffolding and curing etc, in cement
mortar(1:6).(9 thick wall).

Cft

100.00

Providing and constructing brick

masonry with approved quality of


table moulded modular Bricks of
standard size with necessary
scaffolding and curing etc, in cement
mortar(1:6)(4 1/2 thick wall).

Sft

70.00

10

Providing and laying cement


concrete (1:2:4) for R.C.C. Lintels
using
20mm and down size granite
jelly including vibrating, curing and
with, complete. (Exclusive of cost of
steel and fabrication charges).

Cft

150.00

11

Providing and laying cement


concrete for R.C.C Chajja and loft

as per design in cement concrete

(1:2:4) in granite of 20 mm and

down size along with plastering in


cement mortar (1:3) including
plastering complete (Excluding cost
of steel and fabrication charges) .

Sft

120.00

12

Providing and laying cement


concrete (1:2:4) for R.C.C. Stair

case using 20 mm and down size

granite jelly including vibrating


curing and with necessary centering
and form work , including smooth
finish in cement mortar (1:3) etc,
complete (Exclusive of cost of
steel and fabrication charges).

Cft

200.00

13

Providing and laying cement

Cft

150.00

http://architects4design.com/item-rates-construction/[2016/12/8 13:56:06]

Building contractors in bangalore Item rate Quotation sample for Construction of a House in Bangalore

concrete (1:2:4) for R.C.C. Roof


slab using 20mm and down size
granite jelly with necessary

centering and shuttering including


machine
mixing lifting laying
tamping finishing exposed faces in
cement mortar (1:3)
curing etc ,
complete (Exclusive of cost of
steel and fabrication charges).

14

Providing and fabricating

mild/HYSD steel reinforcement


including straightening , cutting,

bending ,hooking ,lapping ,tieing,


with binding wire and anchoring
to
the adjoining members wherever
etc , complete as per design and

specification .

Tons

45000.00

15

Providing & Laying P.C.C (1:4:8) For


Portico with 40mm and down size
jelly including tamping, curing,

finishing etc, complete.

Sft

30.00

16

Providing plain plastering for

external walls of burnt brick


masonry in cement mortar (1:6)
including providing
and removing
scaffolding smooth rendering ,

curing etc, complete.

Sft

30.00

17

Providing plain plastering


for
internal walls of burnt brick
masonry in cement mortar (1:6)
including providing and removing

scaffolding, lime rendering curing


etc , complete.

Sft

35.00

18

Providing plastering to ceiling with


cement mortar (1:3) with necessary
scaffolding and curing , complete .

Sft

40.00

19

Providing and fixing doors with Sal


wood frames & Skin doors fixed in
the masonry with flat iron hold
fasts embedded in cement concrete
(1:3:6:) with fully paneled
shutters including fixing the
fittings. etc, complete.(Skin Doors)

Sft

400.00

20

Providing and fixing


windows &
Ventilators of sal & Honne wood
frames fixed in the masonry with
iron hold fasts embedded in
cement concrete (1:3:6) with fully
paneled Honne wood shutters as
per design and drawing including
fixing the fittings . etc , complete.

Sft

800.00

http://architects4design.com/item-rates-construction/[2016/12/8 13:56:06]

Building contractors in bangalore Item rate Quotation sample for Construction of a House in Bangalore

21

Providing and fixing Main door with


Teak wood, including fixing &
fittings etc, complete.

Sft

1500.00

22

Providing flooring with Vertified


tiles, including finishing etc,
complete.(Basic price =80/-)

Sft

130.00

23

Skirting(Vetrified tiles):

Rft

70.00

24

Providing & laying Antiskid flooring


for Toilet.)

Sft

80.00

25

Glazed tiles Dadooding for toilet &

kitchen walls in cement mortar in


clading, oxalic acid wash, finishing
etc, complete.(basic rate Rs. 70/- per
Sft)

Sft

120.00

26

Providing emulsion painting to


internal walls over the primer
coat of approved make and
colour and finishing as per

specification and directions.

Sft

14.00

27

Providing Distemper painting to


ceiling over the primer coat of
approved make and colour and
finishing as per specification and
directions.

Sft

10.00

28

Providing Asian Apex Matte


painting for External walls over the
primer coat of approved make

and colour and finishing as per

specification and directions.

Sft

12.00

29

Providing and laying weather proof


course to the required
slope as
per detailed specification and
directions etc., complete.

Sft

30.00

30

Providing parapet wall of 4


thick and 2 6 high with approved
quality of modular bricks
including plastering in cement

mortar (1:6).etc , complete.

Rft

300.00

31

Providing and fixing of M.S. grill for


windows and fixing of all fittings,
finishing etc., complete, as per design
& specification.

Sft

120.00

32

Providing Enamel painting for Grills/

Sft

12.00

http://architects4design.com/item-rates-construction/[2016/12/8 13:56:06]

Building contractors in bangalore Item rate Quotation sample for Construction of a House in Bangalore

Staircase Railing & Balcony Railing


etc, complete.

33

Providing & construction of Sump


tank with burnt brick maonry walls &
providing & laying of RCC Roof slab
including plastering etc.,complete
along with sump cover.

34

Providing & construction of 4 1/2


Compound wall upto a height of 46
including foundation, plastering,
painting etc, complete.

Rft

750.00

35

Providing & fixing of M.S.Gate as per


design & specification, etc.,
complete.

Sft

200.00

36

Providing & fixing of M.S.Railing as


per design & specification for
balcony railings.

Sft

150.00

Note:
Items not mention will be charged at market rates.
Quantities are as per the work executed at site.