LG SCIENCE PARK

CASE STUDY

MASTERPLAN EVOLUTION

INTERIOR
DESIGN

PROJECT COMPONENTS

A F F I L I AT E L A B O R AT O R I E S

LANDSCAPE AND THE


PUBLIC REALM

ADJACENCIES
& FLOWS

ARCHITECTURAL
CHARACTER

S U S TA I N A B L E
DESIGN

MEP
ENGINEERING

Project Size:
Site Area:

LG 6 Affiliates:
133,000m2

GBA:

790,000m2

Staff No:

15,000

Const. Cost:

$2.1 Billion USD

Comparable Projects:
10 x size of Francis Crick Institute
200,000m2 larger than KAUST

PROJECT OVERVIEW

1.
2.
3.
4.
5.
6.

LG Electronics
LG Hausys
LG Chemical
LG Innotek
LG Display
LG Life Science

Other Components:
Integrated Support Centre
Exhibition/Seminar
Support facilities
Sports facilities
VIP
Other
Food Hall/Canteen

LG: SCIENCE PARK

LG SCIENCE PARK

MASTERPLAN EVOLUTION

ISC

LG DISPLAY
LG HAUSYS
LG CHEM
LG LIFE SCIENCES

LG ELECTRONICS

CENTRAL PROMENADE

LG CHEM
SLC

CONCEPT DIAGRAM / ADJACENCIES

LG INNOTEK

MASTERPLAN EVOLUTION

DP2

DP3

LGE

LGE

LGE

LGE

LGE

LGE

SITEPLAN EVOLUTION

ISC

SLC

LGD

LGIT

LGH

LGC

LGC

LGLS

LGE

LGE

LGE

ISC

LGE

LGE

LGE

SLC

2
FINAL SITEPLAN

LGD

LGH

LGIT

LGLS

LGC

LGC

PROJECT CHALLENGES:

FAST TRACK PROGRAMME


PROJECT SIZE / COMPLEXITY
MAJORITY NEW HOK TEAM
COMPLEX BUILDING TYPOLOGIES
CULTURAL DIFFERENCES/LEARNING
ONGOING CHANGE
CONSULTANT TEAM LOCATION

PROJECT CHALLENGES

PROJECT CHALLENGE RESPONSE:


Division of project into manageable
workstreams with defined team
ownership
Workstream definition to promote
communication / coordination
Project Workstream Split

Clarity as to management structure,


responsibility and ownership

Ownership provides responsibility;


promotes leadership
Workstreams defined BIM model
split/Ownership
BIM Model Ownership/Responsibility
TEAM STRUCTURE / MODEL DIVISION

Project Team Structure

MASTERPLAN BUILDING COMPONENTS:

LG Other Affiliates (DP3)

LG Electronics (DP2)

Integrated Support Centre /


Shared Lab Centre (shared
resources for all affiliates)
Campus Restaurant (to cater
for 15,000 staff for lunch)
FM Corridor (service for all
buildings on site)

BIM ESSENTIAL FOR COMPLETING BLOCK AND STACK DIAGRAMS TO MEET CLIENT AREA REQUIREMENTS
TEAM STRUCTURE / MODEL DIVISION

BIM MODEL DIVISON:


Models

16 Models
20 30 BIM Staff in models at any one time
Ownership / Responsibility Key for Success

AR/SS

RG/EB

JE/YY

LG-HOK-AR-BASE
LG-HOK-AR-DOC
LG-HOK-AR-DP2N
LG-HOK-AR-DP2S
LG-HOK-AR-DP3N
LG-HOK-AR-DP3S
LG-HOK-AR-GRID
LG-HOK-AR-ISCN
LG-HOK-AR-ISCS
LG-HOK-AR-M_OPT
LG-HOK-AR-SHELL-ISC

TL/MP

TEAM STRUCTURE / MODEL DIVISION

LG-HOK-AR-SHELL
LG-HOK-ID-DP2N
LG-HOK-ID-DP2S
LG-HOK-EQ-DP3N
LG-HOK-EQ-DP3S
LG-HOK-LA-SITE
TOTALS: 938 MB

GEOMETRY
Building geometry is largely rectilinear
and relatively simple in form
Complexity of project is from the
internal planning/coordination of the
project; Swiss watch analogy

Simple Form Buildings

Rectilinear Building Blocks

Each LG Affiliate had differing S&T


requirements meaning different
grid/core arrangements
Connectivity and flow essential for
operational criteria and to encourage
communication & collaboration

Complex Internal Planning / Flows


GEOMETRY

BIM BOUNDARIES / INTERFACE:


Faade / Envelope

Car Park/Restaurant/Utilities

B1 INTERNAL
CIRCULATION
(DP3)

DP3 CENTRAL DINING ACCESS, FLOWS AND CIRCULATION (OFFSET CORE)

Structures

Cores / VT

Science Planning / Interior Design

Public Realm / Landscape

MEP / Plant

(DP2)

DP2CENTRAL DINING ACCESS, FLOWS AND CIRCULATION (CENTRE CORE)

BIM BOUNDARIES / INTERFACE

MODEL INTERFACE MANAGEMENT


DP2 MODEL
(RG)

SHELL
MODEL (JE)

LEVELS (DS)

VARIABLE SAWTOOTH PANEL (YY)


DP2
(RG)

OFFSETS /
SETTING OUT
(JE)

10 FAADE TYPOLOGIES

DP2 - ID
(MD)

4-6 PANEL TYPES PER FAADE


(BETWEEN 40-60 VARIATIONS ON A THEME)

GEOMETRY MODEL INTERFACE MANAGEMENT

INCREMENTAL
ANGULATION

CUSTOM
SCISSOR
STAIRS (RG)

CONSULTANT BIM COORDINATION

MAJOR CONSULTANTS:

London/Wales: Structure, Civils, Specialist Engineering

Boston, USA: MEP & Sustainability

CONSULTANT BIM COORDINATION

DRAWING REVIEW IMPLEMENTATION


First pass drawing review /
mark up to establish drawing
exemplar
BIM Task Table to identify BIM
model actions required
Define & Assign actions /
ownership
Finished drawing completed to
exemplar standard

TOOLS & TEMPLATES

DRAWING SHEET TOOLS


Sheet template

View template filter

Keyplan template

Department legend template


BIMLINK to translate
room/sheet names into
Korean big timesaver

TOOLS & TEMPLATES

BIM USAGE FOR SUSTAINABILITY:

Sustainable Project Criteria:


Lab Buildings: LEED Silver
ISC Build: LEED Platinum +
BIM model used for sustainable design studies/calcs
(solar/thermal studies, daylight analysis, window to
wall ratios, etc.)

BIM USAGE FOR SUSTAINABILITY

BIM MODEL VISUALISATION USAGE:

Model views set from Navisworks (also used for internal/Client interim reviews)
Model & view then issued to visualisation company for final render

VISUALISATION

LG SCIENCE PARK
Masterplan / Concept Design / Scheme Design of 790,000m2
Completed in 6 months led by HOK London
HOK Team size 42 (at max)

Integration of Design Team/Model Management Process was


Key to Delivering Largest S&T Campus in the World
(at time of design completion)