Concept of Learning
Human performance show improvement when activities
Learning Curve
Learning Curve is a line displaying the
relationship between unit production time
and the cumulative number of units
produced.
It reflects that as workers repeat task, they
Learning Curve
Three Assumptions
Amount of time to complete a task or unit of
a product will be less each time the task is
undertaken
The unit time will decrease at a decreasing
rate
The reduction in time will follow a predictable
pattern
Learning Curves
By analyzing workers learning situations, we
are able to estimate:
The average number of labor-hours required per
planning
Scheduling
Estimating cost of production
Pricing decisions
Capacity Planning
Learning Curve
Experts agree that learning effect is the result
of other factors in addition to actual worker
learning. Some of the improvement can be
control
Learning Curve
Three approaches to learning curve problem
Arithmetic analysis
Logarithmic analysis
Arithmetic Approach
For 80% learning curve, the second unit takes
80% of the first unit, fourth takes 80% of the
second unit, 8th takes 80% of time of fourth
unit
Time reqd. for nth unit = TLn
T = unit time of the first unit
L = learning curve rate
n = number of times T is doubled
Arithmetic Approach
If the first unit of a particular product takes 10
labour hours, and if a 70% learning curve is
present, the hours the fourth unit will take
1.2000
70%
1.0000
80%
Unit Time
90%
0.8000
0.6000
0.4000
0.2000
0.0000
1
9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45
Unit Num ber
Learning Curve
An 80% learning curve denotes a 20%
decrease in unit (or average) time with
doubling of repetitions
A 90% curve denotes a 10% improvement
rate
A 100% curve would imply no improvement
at all
Example:
Example:
(A)
EZ Machine Shop
118/140
102/118
81/95
68/81
= .8429
= .8644
= .8526
= .8395
Arithmetic Analysis
Arithmetic analysis does not answer labour
hours required for every unit, say 7th unit
To find answer for any unit, we use
logarithmic analysis
Logarithmic Analysis
Tn = T1(nb)
Where, Tn= labour hours required to
produce nth unit
n = nth unit
T1 = labour hours required to
produce 1st unit
b = slope of the learning curve
r = learning rate %
b
-0.515
-0.415
-0.322
-0.234
-0.152
Example:
(C)
EZ Machine Shop
Logarithmic Analysis
Compute, using logarithmic analysis, the
labor-hours required for the 50th turbine
(assuming an 85% learning rate and 140 laborhours required for the 1st unit).
b = log (.85) / log (2) = - 0.234465253
T50 = 140(50-0.234465253)
= 55.96 labour hours
Limitations of Learning
Curve
Varies from company to company, industry to
industry
Estimate should be developed for each orgn.
learning curve
Appropriate in job shop and customer service
operations since batches tend to be small
Inventory Control
Chapter 15
Inventory
Inventory: Stock of any item or resource used
in an organization.
Inventory
Inventory At Successive
Points
Manufacturing Inventory
Manufacturing Inventory: Items that contribute
to or become part of a firms product.
Raw material inventory
Physical inputs at the start of the production process.
(Typically, the stock point at the beginning of the a routing is
termed raw material inventory even though the material may
have already undergone some processing.)
Work-in-process
Inventory between the start and end points of a product
routine
Finished goods
The stock point at the end of a routine
Service Inventory
Inventory: Tangible goods necessary to
administer the services in various types of
service organizations (hospitals, banks)
Hospitals: (medicines, syringes, sutures, glucose
coins
Inventory Costs
Basically two types of costs
Ordering costs (costs associated with placing an order)
Managerial and clerical costs (salaries)
Stationery, postage, telephone and electricity bills
Holding costs
inventory control
C items (low rupee volume): low inventory control
Note: Rupee volume is a measure of importance; an
item low in cost but high in volume can be more
important than a high-cost item with low volume.
% of Total Value
22
95000
40.69
68
75000
32.13
27
25000
10.71
15000
6.43
82
13000
5.57
54
7500
3.21
36
1500
0.64
19
800
0.34
23
425
0.18
41
225
0.1
233,450
100%
Classification
Item No.
% of
Total
22, 68
Rs 170,000
72.90%
27, 03, 82
53,000
22.7
10,450
4.4
Multi-period Inventory
Systems
Two types
Fixed order quantity model (Q Model)
Event or quantity triggered
Inventory on hand
Q
Demand Rate
Avg. Inventory
(Q/2)
R
Reorder Pt.
L
Order Placed
Time
Order Receipt
L = Lead Time
R = Reorder Point
between placing an
order and its receipt
Reorder Point: The
inventory level at
which a new order
should be placed.
throughout
Lead time is constant
Price per unit of product constant
Inventory holding cost is based on avg. inventory
Ordering or set-up costs are constant
Instantaneous replenishment
There are no quantity discounts
TC = DC + (D/Q)S + (Q/2)H
Where, TC = Total annual cost
D = Demand
C = Unit cost
Q = Quantity to be ordered
S = Ordering cost or set-up cost
R = reorder point
L = Lead Time
H = Annual holding or storing cost per unit of average inventory
2DS
H
Reorder Point, R = dL
The square root formula is the EOQ, also referred as economic lot size
Safety Stock
EOQ model assumed deterministic demand
Demand in reality varies from day-to-day
Probability of stock out during lead time
Need to keep safety stock in addition to expected
demand
Safety Stock
Safety Stock
Safety stock
Reorder Point, R = dL + zL
Where d = Average daily demand
L = Lead Time in days
Z = No of standard deviations for
a specified probability
L = Standard dev. of usage
during lead time
TC = DC + (D/Q)S + (Q/2)H
Inventory Turnover
Annual Sales (at cost)