Вы находитесь на странице: 1из 12

CURRICULUM VITAE

Name
Profession

NARESH KUMAR GOYAL


Civil and Infrastructure, Project Management,
Urban Development, Water and Waste Water
Storm water Drainage and flood Control;
Business Development
Present Designation
Associate (Principal Engineer)
Years with Current Firm
4 Years
Nationality:
Indian
Countries of Work Experience India and Sultanate of Oman, Saudi Arabia
Professional Experience
17 Years
Residential address:
Flat no 202, Tower B2, SRS Residency sector 88, Faridabad, India
Contact no. +91-9911102018 (M) +91-9910009382 (M)
Email: nareshgoyal2001@gmail.com , nareshgoyal2001@yahoo.com
PROFESSIONAL SUMMARY:
I am having 17 years professional experience in the consultancy sector for the feasibility study,
conceptual, detail engineering reports/construction drawing/ Project management for large water
supply, sewerage & storm drainage schemes in municipal and private real estate sectors for residential
Townships, SEZs, and Commercial & Industrial development projects with good experience in
managing, leading design and successful delivery to the clients and directions assigned by US/ UK
based international experts for specific projects related to Waterfront and water management, green
field , utility integration, conceptual strategies and alternatives.
Performed in various activities in various stages of projects i.e. data collection, investigation and
studies, base plan preparation , master planning inputs, existing system evaluation/ assessment and
proposed infrastructure requirements, gap/deficiency analysis , demand projection, design
criteria/design guidelines and baseline strategies formulation.
Leading team in preparation of Concept reports , Preliminary and Detail Engineering Design Reports
and drawings, Strategically assumptions, Design of water transmission system, sewerage system,
storage facilities, water/wastewater pumping stations, rate analysis, Block cost , detail cost
estimation, tenders, Pre-bid meetings, Tender evaluation and client Interaction, stake holder
discussion, Quality and Project/Program Management.
Also involved in projects funded by banks like ADB, WB, and JICA, JBIC etc. and managing business
proposal for private and government sectors clients. New client and repeat work orders to
organization.
KEY SKILLS/ACHIEVEMENTS
Team management, work plan and schedule for team, budget management and tracking overall
Project Program and preparation of reports.
Investigation and studies, Review of data and gap, demand forecast, augmentation, alternative
designs.
Regional infrastructure master plan and concept planning , Infrastructure design for SEZS,
integrated townships, industrial parks
Infrastructure improvement / up gradation for municipal projects.
Conceptual engineering reports, detail project reports
Storm water drainage system ,Rainfall analysis, catchment area demarcation & flood studies and
protection works
Bill of quantity, project cost estimation, analysis of rates, block cost and detail cost estimate ,
Preparation of tender documents
Quality Management and quality Assurance , Design coordination, project management, liaison
with clients , Business Development
Professional Qualification:
M. Tech in Civil Engineering (with specialisation in Environmental Engineering) from Indian Institute
of Technology Roorkee (IITR) 2001-2003
B. E (Civil Engineering) (with Hons) from National Institute of Technology (NIT), Raipur 1995-1999
Scholarship: MHRD Scholarship during Post Graduation
Trainings and Award:
Naresh Kumar Goyal

1|P a g e

CURRICULUM VITAE
Review, project progress monitoring, quality controls and Operations/maintenance procedures
for National highways NH-43, Chhattisgarh
Mike 2011 at KEIP project Kolkata by DHI India Pvt Limited 2006
Trailing on effective communication skills at IIPM Chhatarpur, New Delhi 2009
Bentley water gems, sewer gems and storm CAD at 10 B AECOM head office , Gurgaon 2012
MAP Training by AECOM quality management system Managing AECOM projects- 2014
Quality audits Quality Star performer 2014
EMPLOYMENT RECORD:
Aecom India Private Limited Gurgaon
April 2012 Till date Associate (Principal Engineer)
WSP India, New Delhi
Jan. 2011- April -2012 Dy. General Manager Infrastructure
Kentz Engineering and constructor , KSA Saudi Arabia
October 2009- Dec 2010 - Senior Civil Engineer (Infrastructure)
Voyants Solutions Private Limited, Gurgaon
Jan 2009- Oct 2010 - Senior Manager (Infrastructure)
WSP Engineering Services Limited , Gurgaon
Oct 2007 to Dec 2008 - Manager (Technical) infrastructure
Ramky Infra Consulting Private Limited Gurgaon (Ramky Group, Hyderabad)
May 2006- Oct 2007 - Sr. Manager/Manager (Infrastructure)
Consulting Engineering Services (India) Private Limited, New Delhi
April 2003- April 2006 - Sr. Engineer/Engineer/Assistant Engineer
DAAT (India) Private Limited
July 1999 to July 2001 Site Engineer
PROJECT EXPERIENCE
Consultancy Services for Project Management Services (PMC) & Design of Marine Work Package for
execution of Phase IIA at Naval Base Karwar (Project Seabird)
Year: Dec 2014 to till date
Location: Karwar, Karnataka
Client: Indian Navy, New Delhi
Main project features:
One of Mega project for consultancy in India, total expected Project cost 2.65 billion USD$ by Ministry
of defense Govt of India for Phase IIA of Naval Base at Karwar. The Project involves , Design of Marine
works, cover dry berth, Fleet base buildings , dockyard , residential townships and accommodations,
Naval air station packages including DPR review, Detail Design of civil and infrastructure works
including road works and bridges, building industrial and residential, Environmental park (18 hole golf course), wet and dry utilities infrastructure water, recycled water , sewage collection and disposal
system , storm drainage, Flood protection works, utility coordinations , project sustainability, green
initiatives, project cost estimation and BOQ, Tender documents for Design Bid and Design and Build
basis and broad level utilities costing, tendering, till acceptance of tender activities.
Positions held: Package Manager for trunk infrastructure works
Activities performed: Responsible for leading and managing team for wet and dry utilities drainage
design of the project. DPR Review, Gap analysis, Concept Design, Detail Design, Design Basis, network
modelling and review , RFP for DC , PQ tender documents , coordination for wet and dry utilities,
interacting to client along with internal Team from AECOM US office. Scope of work and tender
document to client for additional for investigation and studies including supervision of venders works,
program and scheduling, manpower managements.
Concept Master plan and infrastructure strategies for Panvel Township
Year: 2015-ongoing
Location: Panvel, Maharashtra
Client: the Wadhwa group Mumbai
Main project features: Detailed Design of Trunk Infrastructure Services for Panvel township spread
across 500 Acres
Positions held: Lead infrastructure Expert and Project Manager
Naresh Kumar Goyal

2|P a g e

CURRICULUM VITAE
Activities performed: Work includes broad level Concept Master planning and infrastructure
strategies for infrastructure schemes, roads, site Grading, water supply, sewerage and storm water,
rainwater harvesting and electrical system, Concept Drawings, block cost estimate and interaction
with CIDCO and NMC.
Detailed Infrastructure Design for 200 acres royal Castle and Trunk Infrastructure Services 8800
acres for Wave City NH24, Ghaziabad
Year: 2014-2015
Location: Ghaziabad, India
Client: Uppal Chadha Hi-tech Developers Pvt Ltd.
Main project features: Detailed Design of Trunk Infrastructure Services for upcoming Wave Hi-tech
and Green Tech City spread across 10000 Acres
Positions held: Lead infrastructure Expert and Project Manager
Activities performed: Work includes planning and designing water supply, sewerage and storm
water trunk services, construction drawings, BOQ and Specifications, Tender preparation and
evaluation.
Program Manager for New Cities- Dholera Special Investment Region (being developed under
Delhi-Mumbai Industrial Corridor (DMICDC)
Client: AECOM PNMC Team DSIRDA, DMICDC and GIDB
Year: 2013- ongoing
Location: Dholera Gujarat
Project Area: 920 sq.km
Positions held: Water Supply Expert for Water transmission main and Drainage Expert
Main Project Feature: Industrial Development
Activities performed: Leading Design team for preliminary Design of water Transmission Main and
Pump house (WTP 150 MLD ), TP level Reservoirs and Pumping stations (3 no 30 MLD each ) ,
Preparation of tender document, review of design consults documents for TP level design consultants
Detail Design and Engineering-Infrastructure Services for Proposed 583 Acres at Krishnagiri SEZ
Client: GMR Group
Year: 2013-2014
Location: Krishnagiri, Tamil Nadu
Project Area: 583 acres
Positions held: Storm Drainage expert
Main Project Feature: Industrial area Development , approximately 3000 acres jointly with
Tamil Nadu Industrial Development Corporation (TIDCO) and In the first phase development
of about 1000 acres, a Manufacturing & Engineering Industrial Investment
Activities performed: Design of storm Drainage system, Catchment area analysis, and preliminary
design report, Detail design of storm drainage system, BOQ and tender document, detail working
drawings
Concept & Detailed Engineering of Infrastructural services for Brahma City, Sector 60, 61, 62, 63 &
65 Gurgaon Manesar Urban complex
Client: Brahma City Private Limited Gurgaon
Year: 2012-2014
Location: Gurgaon, Haryana
Project Area: 183 acres
Positions held: Project Manager
Main Project Feature:
Infrastructure development of Integrated Residential Township having Plotted development, five
independent staggered land parcels, population 16000, Low density developments
Activities performed:
leading the project team in reconnaissance survey, data collection, infrastructure demand analysis,
Concept infrastructure Master plan, Design Basis Report, zoning plan, Services estimate, Technical
inputs EIA approval, Detailed Design & final working drawings for water supply, sewerage system,
drainage system, site Grading, cut /fill analysis, rainwater harvesting, Project Cost Analysis, Cost
estimates, tender document and Periodic Site visit/ Technical assistance during construction
Naresh Kumar Goyal

3|P a g e

CURRICULUM VITAE
Concept Master plan & Infrastructure strategies and concept infrastructure plan for Wave Hi-tech
and sun Green tech city at NH-24 City 9000 acres, Ghaziabad
Client: Sun city Hi-tech Infrastructures Private Limited
Uppal Chadha Hi-tech Infrastructures Private Limited
Year: 2012 2013
Location: Ghaziabad, Uttar Pradesh
Project Area: 8800 acres
Positions held: Lead Infrastructure Expert (Wet Utilities)
Main Project Feature: Integrated hi-tech and Sun Green-tech Residential Mix use Development,
population 3.2 Million, high density mix used Developments, concept master planning and
infrastructure strategies
Activities performed: Leading the project team for carrying out data collection, data analysis, Site
Drainage pattern, Population forecast (3.2 million), Infrastructure demand analysis, Concept
infrastructure master plan, ROW planning for utilities identification of wet utility zones, design
Rainfall intensity Comparison NCT Delhi, catchment analysis, freezing design parameters for trunk
infrastructures, zoning plan infrastructure services etc
Concept & Detail Infrastructure Engineering for IREO University of Gurgaon (20 acres)
Client: IREO Pvt limited
Year: 2013- 2014
Location: Gurgaon
Project Area: 20 Acres
Positions held: Project Lead Infrastructure wet Utility services
Main Project Feature: Integrated Institutional campus, 8000 students with a total FAR area of
approximately 81,000sqm. Concept and detail engineering of services, Road network and building
engineering structural and MEP services for buildings.
Activities performed:
Leading the project team for carrying out reconnaissance survey, data collection, demand analysis,
Concept Report, for Water Supply Network, Sewage Network, catchment area analysis, Flood study,
HFL estimation, Storm Water Drainage System, Solid Waste Management, Water & Sewage
Treatment Plant, Concept layout of services, ROW planning, Preliminary design of services,
Preliminary Site Grading, cut /fill analysis, Project budgetary cost estimates, etc.
Wave City Centre Noida
Client: Wave Infratech Limited
Year: 2013- 2014
Location: Noida, Uttar Pradesh
Project Area: 153 acres (22.7 million square feet)
Positions held: Storm Drainage Expert
Main Project Feature: This US$5.40 million project with a total GFA of 31.21 million square- feet is a
mixed- use development located at the heart of the Noida City, with a wealth of facilities including
a five-Star hotel, retail development, SCOs, offices, residential towers, and a convention center.
A key feature of the project is the provision of utilities corridors to save space and facilitate easy
maintenance minimizing road opening for installing new utilities.
Activities performed: Design of storm Drainage system, Catchment area analysis, and preliminary
design report, Detail design of storm drainage system, BOQ and tender document, detail working
drawings
Detailed Engineering Design of Infrastructural services of DLF City Phase Gurgaon
Year: 2012- 2013
Location: Gurgaon, Haryana
Client: DLF limited
Main project features: Urban development, detail design, Site Grading Water supply, Sewerage and
drainage and tender documents good for construction, Design assistance and quality check during
Construction of project Components
Positions held: Project Manager Infrastructure
Urban Planning and Re-Development work for Phase 1 4 of DLF City
Naresh Kumar Goyal

4|P a g e

CURRICULUM VITAE
Client: DLF Estate Developers Ltd.
Year: 2012-2013
Location: Gurgaon, Haryana
Project Area: 1776 acres
Positions held: Project Manager
Main Project Feature: Urban Planning Review and Project Coordination, Traffic and Transport
Planning Strategy, Infrastructure Improvement Strategy Carry out study for evaluating the adequacy
of the existing infrastructure within the project area covering utilites and urban improvement for
Traffic and Transportation , Power Supply , Water supply , Waste water & Recycled water and its
usage ,Storm water Drainage and rainwater harvesting, Solid waste management, urban neighhood
improvents including parks and street.
Activities performed:
Leading Infrastructure improvement strategies for neighbour hood, data collection, data analysis,
Stake hold works shop, Identification for improvement of critical and non-Critical infrastructure,
concept infrastructure planning, improvement frame work, population about 3.0 lakhs, Demand
calculation integrated water management plan, Preparation water supply layouts, Sewerage
improvement, Flooding issues and technical Solutions/strategies for water logging, Demand supply
Management, Solid waste Management strategies and improvement of electrical infrastructure,
streetlights, substations and DG power backup options to Residents on mutual consent cost sharing
basis, improvement of signature streets, Demand side management for parks and landscaping work
with MICRO STPs. Rainwater harvesting, budget cost estimate for improvement plan etc.
Master Planning and Detail engineering for the development of 164 Acres ZEUS IT SEZ at Mumbai
Year: 2011-2012
Location: Mumbai
Client: HubTown Limited (Ackurti City Group Mumbai)
Main project features: Urban development, detail design, ITSEZ, Site Grading Water supply, Sewerage
and drainage and tender documents good for construction, Design assistance and quality check
during Construction of project Components
Positions held: Project Manager
Activities Performed: led the Infrastructure team for carrying out reconnaissance survey and data
collection, Demand analysis, detailed design & construction drawings for water supply, sewerage
system, drainage system and flood control schemes along with rain water harvesting and budgetary
cost estimates, tender document and Site visit/assistance during construction
Conceptual Planning and Detail Engineering for Mixed Use Development, Japyee Sports City, greater
Noida, Uttarprdaesh 10000 acres
Year: 2010-2012
Location: Dankaur, Greater Noida India.
Client: Jaypee Infratech Limited, Utttarpradesh
Main project features: Urban development, detail design, Site Grading Water supply, Sewerage and
drainage and tender documents good for construction, Design assistance and quality check during
Construction of project Components
Positions held: Project Manager, Infrastructure
Activities Performed: lead the Infrastructure team for carrying out reconnaissance survey and data
collection, Gap analysis , Demand analysis, integrated Water management balance, Detailed design
for infrastructure for about 1000 acres plotted development i.e. Yamuna vihar ,kais , Country homes,
Crowns , ROW and utility coordination plan, Zoning of trunk infrastructure , Detail design of trunk
infrastructure roads, site Grading , cut fil analysis , water supply and WTP , recycled water , sewerage
system and STPs , drainage system, Trunk supply from YEIDA, lakes and water bodies, sustainable
storm water management plan, Flood risk analysis , earthen dense bund and boundary wall , outfall
disposal , electrical works ,27-hole golf course water management strategies , coordination with
Japyee Design Team and various international consultants such as SOM, HOK, Peter Elise New Cities,
integral Design Consultants , ARCOP, Tilke and Indian Design Consultants for MEP and Road works,
submission of Detail Design Report for trunk infrastructure (about 130 Km trunk for water , sewer and
Drainage) Jaypee Cities at Yamuna Express way (Sport city , jaypee city East and Japyee city west.
Naresh Kumar Goyal

5|P a g e

CURRICULUM VITAE
Environmental submission to Yamuna Expressway development authority (YEIDA), Tender document
for trunk infrastructure and construction Drawings for road , earth Grading , trunk water supply, WTP,
sewerage system STP, drainage system , Lakes and flood control schemes along with rain water
harvesting and budgetary cost estimates, tender document and Site visit/assistance during
construction.
Detailed Engineering Design of Infrastructural services of DLF Cyber City
Year: 2008
Location: Gurgaon, Haryana
Client: DLF limited
Main project features: Infrastructure improvement and Design Development
Positions held: Project Manager, Infrastructure
Activities Performed: lead the Infrastructure team for carrying out reconnaissance survey and data
collection, interaction with HUDA officials, Gap analysis, Demand analysis, Concept infrastructure
improvement plan, Detailed Design Report for water supply, sewerage system, drainage system, rain
water harvesting, outfall Drain to NH-8 form DLF-Phase 3 and electrical system, budgetary cost
estimates.
Design & Detailed Engineering for Infrastructure work of Proposed Residential (Jaipur Greens)
Township at Jaipur (200 Acres)
Year: 2005-2007
Location: Rajasthan, India
Client: Emaar MGF Pvt Limited
Main project features: Residential and Township trunk Internal infrastructure
Positions held: Project Manager Infrastructure
Lead the Infrastructure team for reconnaissance, topographical survey and data collection, Demand
analysis, Concept and detailed design and construction drawings for Site Grading, road works water
supply, Recycled water supply, UGT, OHT and pumping stations ,sewerage system, STP, drainage
system along with rain water harvesting, Nalliah improvement , water bodies and budgetary cost
estimates tender documents in phases, technical evaluation , RFI and good for construction, Technical
assistance during Construction stage for trunk infrastructure Components.
Design & Detailed Engineering for Infrastructure work of Residential Plotted Colony Emerald Hills at
Sector 65, Gurgaon
Year: 2006-2008
Location: Gurgaon (150 acres)
Client: Emaar MGF Pvt Limited
Main project features: Residential and Township trunk Internal infrastructure
Positions held: Project Manager Infrastructure
Activities Performed
Lead the Infrastructure team for reconnaissance, topographical survey and data collection, Demand
analysis, Concept and detailed design and construction drawings for Site Grading, road works water
supply, Recycled water supply, UGT, and pumping stations ,sewerage system, STP, drainage system
along with rain water harvesting, Nalliah improvement , water bodies and budgetary cost estimates
tender documents in phases, technical evaluation , RFI and good for construction, Technical assistance
during Construction stage for trunk infrastructure Components.
Design and Detailed Engineering for JB SEZ (JB Pharma & HBS Relaters) at Panoli (250 acres)
Year: 2008-2010
Location: Gujarat.
Client: JB SEZ limited
Main project features: Urban development, detail design, Pharma SEZ, Site Grading Water supply,
Sewerage and drainage and tender documents good for construction, Design assistance and quality
check during Construction of project Components
Positions held: Project Manager Infrastructure
Activities Performed
Lead the Infrastructure team for reconnaissance, topographical survey and data collection, Demand
analysis, Concept and detailed design and construction drawings for Site Grading, road works water
Naresh Kumar Goyal

6|P a g e

CURRICULUM VITAE
supply, Recycled water supply, UGT, and pumping stations ,sewerage system, STP, drainage system
along with rain water harvesting, Nallah improvement , water bodies and budgetary cost estimates
tender documents in phases, technical evaluation , RFI and good for construction, Technical assistance
during Construction stage for trunk infrastructure Components.
Hydrological & Flood Risk Study Assessment for 2500 Acres Ansal Hi-tech City for Ansal Megapolis
Township Dadri, Ghaziabad, Uttrapradesh
Year: 2011-2012
Location: Dadri Ghaziabad, Uttarpradesh
Client: Ansal properties and Infrastructure limited
Positions held: Project Manager
Main project features: Flood Risk Study and integrated Drainage System, Integrated Residential
Development
Activities Performed
Team lead for carrying out reconnaissance survey, basis water demand analysis, water balance,
sustainable demand analysis, hydrological study and recommended flood control measures,
computation of storm water run-off, preliminary drainage and flood control schemes, and rain water
harvesting concepts and budgetary cost estimates
Detailed Engineering Design of Infrastructural services of DLF Cyber City at Gurgaon, Haryana
Year: 2006-2007
Location: Gurgaon, Haryana
Client: DLF Commercial limited
Positions held: lead infrastructure Expert
Main project features: Commercial offices and IT SEZ
Activities Performed
Worked as a Member of the team responsible for design of water supply scheme, sewerage system
and storm water drainage & flood control management including suggestion for recycling of treated
waste water and rain water harvesting.
Water Resources Management Study for Proposed Waterfront City, Ludhiana
Year: 2006-2007
Location: Ludhiana, Punjab
Client: DLF Home Developer limited
Positions held: lead Drainage expert and Project Manager India Team support to WSP London on data
collection and analysis
Main project features: Residential and integrated Development
Activities Performed
Conducting hydrological study to identify the effect of Satluj river on proposed township, study about
water resources management of proposed township (8000 acres), study about sustainability of
proposed city against possible flood threat and suggesting flood control techniques, costing for water
bodies and flood control measures , block cost estimates
Conceptual Engineering Services for Ramky Discovery City, Hyderabad, Andhra Pradesh, (750 acre)
Year: 2007-2008
Location: Hyderabad, Andhra Pradesh
Client: Ramky Estates and farms Private limited
Positions held: Project Manager and support to HOK for Concept master plan
Main project features: Residential and integrated Development
Activities Performed
As Project Manager Infrastructure, responsible for carrying out reconnaissance survey, water demand
analysis, computation of sewage generation, carried out hydrological study and recommended flood
control measures, computation of storm water run-off, water supply/sewerage/drainage and flood
control schemes, strategy for solid waste management, wastewater recovery & recycling and rain
water harvesting concepts and budgetary cost estimates
Detail Project Report for selected road from NH-8-Shankar Chowk (DLF Cyber City) to sector 55-56
Road improvement Project (Under JV of HUDA and DLF Limited)
Year: 2007-2008
Naresh Kumar Goyal

7|P a g e

CURRICULUM VITAE
Location: Gurgaon
Client: DLF Metro Limited Gurgaon
Positions held: Project Manager Utilitys diversion
Main project features: Road Corridor Improvement project
Activities Performed
Lead Utility Infrastructure, responsible for carrying out reconnaissance survey , data collection ,Data
review , gap analysis , analysis for existing utilities , modification in utility due division and
improvement, Objectives of Infrastructure Review, Identification of potential impacts to the existing/
planned utilities due to proposed traffic improvement works ,schematic improvement plan for utility
due road improvement such as shifting or rerouting of utility, ROW cross section , Cost Estimates and
Rate analysis , Detail Drawings and tender document , interaction with HUDA officials
Concept and Detail Engineering for Ajanta Pharma SEZ at Aurangabad (Maharashtra) -300 acres
Year: 2009-2010
Location: Aurangabad (Maharashtra)
Client: Inspira Infrastructure & SEZ limited, Ajanta Group Companies Mumbai
Positions held: Project Manager
Main project features: SEZ and industrial Development
Activities Performed
Worked for concept plan, Master Planning, preparation of DPR for water supply, water treatment,
sewage collection network, design of CETP, catch area study major storm drainage and Nallah
diversion ,internal Road side drainage systems ,lakes and water bodies , SWM system , Electrical LT
and HT Power system including cost estimate, preparation of Concept design Reports ,detail Design
report , tender documents and good for construction and technical assistance during construction
stage
Concept Master Plan of Multi-Product SEZ at Amravati-2500 acres and Detail Engineering of
infrastructure for phase1 (300 acres)
Year: 2009-2010
Location: Amravati, (Maharashtra)
Client: MIDC -Eldeco infrastructure & SEZ limited, Delhi
Positions held: Project Manager
Main project features: SEZ and industrial Development
Activities Performed
Worked for concept plan, Master Planning, preparation of DPR for water supply, water treatment,
sewerage network design of CETP, storm drainage, SWM & system including cost estimate,
preparation of design and drawings for overall and phase 1 infra development
Design and Detail Engineering services for Infrastructural works of proposed Integrated Township at
Mandhala, Baddi -250 acres and international Mega Educational HUB at Kalujhada (100 acres)
Year: 2005-2006
Location: Baddi, Himachal Pradesh
Client: HIMUDA (Himachal Urban Development Authority
Positions held: Project Manager
Main project features: Residential plotted and Institutional Development
Activities Performed
Worked for concept plan, Master Planning, preparation of DPR for water supply, water treatment,
sewage collection network, design of STP , catch area study major storm drainage and Nallah diversion
,internal Road side drainage systems ,lakes and water bodies , SWM system , Electrical LT and HT
Power system including cost estimate, preparation of Concept design Reports ,detail Design report ,
tender documents and good for construction and technical assistance during construction stage
Design Supervision & Project Management consultancy services for Surat Super Yarn Park limited
(Industrial park), Surat, Gujrat (35 acres)-2005-2006
Year: 2005-2006
Location: Surat, Gujrat
Client: Surat Supper Yarn Private limited and SPV IL&FS cluster development private Limited
Positions held: Project Manager
Naresh Kumar Goyal

8|P a g e

CURRICULUM VITAE
Main project features: Industrial Park and infrastructure development under SITP scheme Ministry of
textile, Govt of India
Activities Performed
Worked for concept plan, Master Planning, preparation of DPR for road works , Site Grading water
supply, water treatment, UGT and OHT , Fire Fighting system , sewage collection network, design of
STP , catch area study of major storm drainage and Nallah diversion ,internal Road side drainage
systems Rainwater harvesting , Electrical LT and HT Power Street light ,system including cost estimate,
preparation of Concept design Reports ,detail Design report , tender documents and good for
construction and technical assistance during construction stage
Design, Supervision & Project Management Consultancy Services For Common Effluent
Management Scheme & CETP (3.0 MLD) For Apparel Park (Parma Park l SEZ Phase II, Pithampur
District Dhar, Madhya Pradesh, India 2005-2006
Year: 2006-2007
Location: Indore, Madhya Pradesh (Pithampur Industrial area)
Client: MPAKVN Indore limited (MPSIDC)
Positions held: Project Manager
Main project features: Industrial Park and infrastructure development up gradation of existing
industrial Park Design build Tender for industrial Waste Water network and CETP
Activities Performed
Worked for concept plan, preparation of Concept design Reports, Preliminary Design Report for
effluent collection system and CETP , Design of waste water collection network, Preliminary Process
and hydraulic Design of CETP for DB tender including cost estimate, tender Specification, employers
requirement , Design guidelines, tender evaluation ,wetting of venders drawings and periodic
technical assistance during construction stage
Detail Project Report For Water Supply, Sewerage & Storm Water Drainage For Muzzaffarpur
Integrated Urban Development Project under UIDSSMT Bihar, India (Jnnurm)-2005-2006
Year: 2006-2008
Location: Muzzaffarpur, Bihar
Client: Municipal corporation muzzafarpur, Bihar
Positions held: Project Manager
Main project features: Municipality infrastructure improvement
Activities Performed
Site investigation, coordination for topographical Survey, Infrastructure Gap analysis , preparation
Base Plans , preparation of DPR for water supply, water treatment, UGT and OHT , sewage collection
network, design of STP , catch area study of major storm drainage and Nallah diversion , preparation
of Concept design Reports ,detail Design report , tender documents and good for construction and
technical assistance during construction stage
Detail Engineering & Project Management consultancy services for Infrastructure & Master Planning
for Foundry Park, at West Bengal, for Foundry Cluster Development Association under IIULS scheme
(area 924 acres)
Year: 2006-2007
Location: Howrah, West Bengal
Client: Foundry cluster Development association and IL& FS CDI, SPV
Positions held: Project Manager
Main project features: Industrial Park and infrastructure development
Activities Performed
Worked for Site investigation, coordination for topographical Survey, Infrastructure Gap analysis,
preparation Base Plans , concept plan, preparation of Concept design Reports, Detail Design Report,
preparation of DPR for water supply, water treatment, UGT and OHT , sewage collection network,
design of STP , catch area study of major storm drainage and Nallah diversion , preparation of Concept
design Reports ,detail Design report, Flood risk study , tender documents , BOQ and Cost Estimate ,
technical assistance for infrastructure in environmental approval stage , Prequalification and RFI, Prebid, Tender evaluation and shortlisting of contractors and good for construction and technical
assistance during construction stage, wetting of venders drawings ,periodic technical assistance during
Naresh Kumar Goyal

9|P a g e

CURRICULUM VITAE
construction stage and Review of built Drawings by contractor and project completion certificate and
DLP compliance /assistant to SPV.
Industrial Estate at Udyog Vihar, phase VII sector 34-35, Gurgaon, Haryana (area 620 acres)
Year: 2006-2007
Location: Gurgaon Haryana
Client: HSIIDC
Positions held: Project Manager
Main project features: Industrial Park and infrastructure development
Activities Performed
Worked for Site investigation, coordination for topographical Survey, Infrastructure Gap analysis,
preparation Base Plans , concept plan, preparation of Concept design Reports, Detail Design Report,
preparation of DPR for water supply, water treatment, UGT and OHT , waste water collection
network, design of CETP , catch area study of major storm drainage and Nallah diversion , preparation
of Concept design Reports ,detail Design report, tender documents , BOQ and Cost Estimate,
Prequalification and RFI, Pre bid, Tender evaluation and shortlisting of contractors and technical
assistance during construction stage, wetting of venders drawings ,periodic technical assistance during
construction stage.
Industrial Model Town ship, IMT Manesar Phase V area 1154 acres (HSIIDC, Haryana Industrial &
infrastructural Development Corporation)
Year: 2006-2007
Location: Gurgaon Haryana
Client: HSIIDC
Positions held: Project Manager
Main project features: Industrial Park and infrastructure development
Activities Performed
Worked for Site investigation, coordination for topographical Survey, Infrastructure Gap analysis,
preparation Base Plans , concept plan, preparation of Concept design Reports, Detail Design Report,
preparation of DPR for water supply, water treatment, UGT and OHT , waste water collection
network, design of CETP , catch area study of major storm drainage and Nallah diversion , preparation
of Concept design Reports ,detail Design report, tender documents , BOQ and Cost Estimate,
Prequalification and RFI, Pre bid, Tender evaluation and shortlisting of contractors and technical
assistance during construction stage, wetting of venders drawings ,periodic technical assistance during
construction stage.
Industrial Estate at Sitarganj ESIP, Nanital, Uttaranchal.(A Industrial Estate Developed for SIDCUL
and Eldeco Infrastructure & Properties Ltd. in 1,100 acres)
Year: 2005-2007
Location: Sitarganj
Client: ELDECO and SIDCUL JV
Positions held: Project Manager
Main project features: Industrial Park and infrastructure development
Activities Performed
Worked for Site investigation, coordination for topographical Survey, Infrastructure Gap analysis,
preparation Base Plans , concept plan, preparation of Concept design Reports, Detail Design Report,
preparation of DPR for water supply, water treatment, UGT and OHT , waste water collection
network, design of CETP , catch area study of major storm drainage and Nallah diversion , preparation
of Concept design Reports ,Detail Design report, tender documents , BOQ and Cost Estimate,
Prequalification and RFI, Pre bids, Tender evaluation and shortlisting of contractors and technical
assistance during construction stage, vetting of venders drawings ,periodic technical assistance during
construction stage
Consultancy services for 3 Nos. Underground Reservoirs & Booster Pumping Stations at Different
Locations in, Delhi, India, (Kirari 3.5 MGD, Mundka 4.5 MGD, Rohini 5.4 MGD)
Year: 2005-2007
Location: Delhi
Client: Delhi Jal Broad
Naresh Kumar Goyal

10 | P a g e

CURRICULUM VITAE
Positions held: Project Manager
Main project features: Water supply improvement water storage and Pumping stations
Activities Performed
Worked for Site investigation, coordination for topographical Survey, Basic Study and concept Report ,
Detail Design Civil , mechanical and Electrical General Arrangement Drawings and tender document
BOQ and Cost Estimate, Prequalification and RFI, Pre bid, Tender evaluation and shortlisting of
contractors and technical assistance during construction stage, Vetting of venders drawings ,periodic
technical assistance during construction stage
Storm Water Drainage Master Plan for Dehradun City -2003-2005
Year: 2003-2005
Location: Dehradun, Uttaranchal
Client: Uttar Pradesh Pay Jal Shansthan
Positions held: Project Engineer
Main project features: Storm water Drainage Scheme
Activities Performed
Responsible for data collection with necessary site visit, discussion with concerned officials, rainfall
data analysis, calibration of curves etc. from twenty years raw rainfall data, Study of existing drainage
system with inadequacy evaluation, review & assessment of existing data and system components,
identification of deficiencies of existing system, formulation of the proposed system, reconnaissance
survey, and design of drains etc,
Water Transmission System from Bid-Bid, Fannja & Samail Towns to Al Harma & Bahla town, Stage 2
Year: 2003-2005
Location: Muscat, Sultanate of OMAN
Client: Ministry of housing electricity and water (MWHEW)
Positions held: Project Engineer
Main project features: water Transmission Scheme
Activities Performed
Responsible for included data collection, reconnaissance survey, field investigation, formulation of the
proposed system, finalization of design norms, system strategy, selection of transmission main
alignment, population projection and water demand assessment, hydraulic design of system
components, design of storage facilities, etc.
Kolkata Environmental Improvement Project, KEIP, (ADB funded
Year: 2003-2005
Location: Kolkata
Client: Municipal Corporation of Kolkata
Positions held: Project Engineer
Main project features: Drainage canal Improvement, realignment and rehabilitation
Activities Performed
Responsible for data collection, reconnaissance survey, field investigation, discussion with concerned
officials, analysis of rainfall data past 25 years, rainfall Analysis report, , catchment area
characteristics, catchment area calculation, runoff calculations, gap analysis, hydraulic design,
assessment of lining, preparation of modeling reports for four canal basins etc.
Design and Construction Supervision of Sewerage Network System & Treatment Plant for Ibri TownDhahira region, Sultanate of Oman
Location: Muscat, Sultanate of OMAN
Client: Ministry of Regional Municipalities, Environment and Water Resources, (MRME&WR)
Positions held: Project Engineer
Main project features: Sewage collection network and Sewage Treatment plant
Activities Performed
Responsible for planning & design of sewerage system preparation of general arrangement drawings
for project components/treatment units, detailed structural design of treatment units and main
pumping station, preparation of cost estimates, BOQ, technical specification, tender documents,
tender evaluation, reparation of contract document etc.
Consultancy services for 6 Nos. Underground Reservoirs (8 hours storage) & Booster Pumping
Naresh Kumar Goyal

11 | P a g e

CURRICULUM VITAE
Stations (16 hours supply) at Different Locations in Trans Yamuna Area at Delhi, India, (Yamuna
Vihar, Shahdara, Usmanpur, Geeta colony, Chitravihar, Tahirpur) for Delhi Jal Board
Year: 2003-2005
Location: Delhi
Client: Delhi Jal Broad
Positions held: Project Engineer
Main project features: Water supply improvement water storage and Pumping stations
Activities Performed
Worked for Site investigation, coordination for topographical Survey, Basic Study and concept Report,
Detail Design Civil, mechanical and Electrical General Arrangement Drawings and tender document
BOQ and Cost Estimate, Prequalification and RFI, Prebid, Tender evaluation, technical assistance
during construction stage, Vetting of venders drawings
Construction of Sports Complex (Indoor & Multipurpose stadiums) at Raipur
Year: 1999-2001
Location: Raipur
Client: Raipur Municipal Corporation
Positions held: Project Engineer
Main project features: International Cricket stadium and indoor multipurpose sport complex
Activities Performed
Responsible for reconnaissance survey, field investigation, planning: & design preparation of working
drawings, interaction with various authorities, supervision & execution, project Monitoring
M/s Uniparts India Ltd, Noida Phase-II, (Industrial Building Project) Uttar Pradesh, India, 1999-2001
Location: Noida
Client: Uniparts India Pvt limited
Positions held: Project Engineer
Main project features: Industrial Buildings
Activities Performed
Responsible for site survey , layout, planning & design preparation of working drawings, structural
design by STAAD III software, supervision for concreting, shuttering and reinforcement works, quantity
surveying, site management, bar bending schedule, billing, costing and analysis of rates, project
monitoring.
Languages:
Language
Speaking
Reading
Writing
English
Good
Good
Good
Hindi
Good
Good
Good

Naresh Kumar Goyal

12 | P a g e

Вам также может понравиться