Вы находитесь на странице: 1из 6

INDUSTRIAL PROJECT MANAGEMENT

SOLUTIONS

Employee
No.:

Name

AJITH VINCENT

Position

FIBER OPTIC ENGINEER JR

Nationality

INDIAN

Date of Birth

22,JANUARY 1991

Marital Status

SINGLE

544

Languages
: ENGLISH,TAMIL
Educational Qualifications
Degree / Diploma
BE

Industrial Project Management solutions

School / Country
Jeppiaar
Engineering
College
Chennai.

Period (From To)


2013

Page 1 of 6

Brief Profile:

3M certified FOC and Copper terminator

Good knowledge in Outside Plant Facilities (OSP) standards and in Splicing, termination
and testing of OSP copper cable.

Fiber and LAN Cable Installation and termination

Fusion Splicing

Installation of Patch Panels.

OTDR and Power Meter/Light source Testing

VFL testing

Live fiber testing.

Trouble shooting.

Fluke Testing for LAN and Fiber

Equipment Used:

OTDR- Optical Time Domain Reflecto Meter ( EXFO FTB400 OTDR, )


Fusion Splicing Machines ( Fujikura /50R/50S/60R Sumitomo )
Power Meter & Light Source (EXFO)
Fujicura Live cable tester
Cable Locater
Optical Microscope
VFL Locater

O t h e r Ac t i v i t i e s & H o b b i e s :
Travelling
Reading books

Su m m ar y o f Wor k E xp e r i e n c e ( F r o m p r e s e n t t o p r e v i o u s )

Industrial Project Management solutions

Page 2 of 6

Name of Company /
Country

Industrial Project Management solutions.

Project / Department

Maaden Phosphate Project

Position Held

Jr.FOC Engineer

Period (From To)

2016 onwards

Installation and termination of fiber optic set up boxes

Preparation of fiber optic cable

Splicing of both single mode and multi mode fiber optic


cables

Fiber and copper cable drum test

OTDR and power meter light source testing of fiber optic


cable after termination

Installation and termination of fiber optic patch panels

Connectorization of fiber optic cable

Set up and troubleshoot fiber networks

Assembling and termination of different types of fiber


optic patch panels

Fiber optic cable drum test

Splicing and termination of both indoor and outdoor fiber


optic cables

Uni-directional and bi-directional OTDR testing of fiber


optic cables before and after termination

Uni-directional and bi-directional power meter and light


source testing of fiber optic cables after termination and
splicing

Industrial Project Management solutions

Inspection during fiber optic cable pulling

Linking of the fiber optic patch cords

Page 3 of 6

Name of Company /
Country
Project / Department
Position Held
Period (From To)
Key Job
Responsibilities

Industrial Project Management solutions.

:
:
:

SABIC/IBN SINA SAMAC Project


Jr.FOC Engineer
2015-2016

Splicing of both single mode and multimode Optical


Fiber Cables.
Testing of both the single mode and multimode fiber
optic.
Making reports of the tests perform at site.
Making different types of connectors such as ST,
LC, and SC.
Arranging the cable in the joint box and as well as in the
panel of FDF.
Designing of Conduit Access plan, Fiber cable
Schematics, Fiber Joint Schematics, route plan,
Floor plan key map using AutoCAD
Connectorization of fiber optic cable
OTDR and power meter light source testing
Installation and termination of fiber optic patch
panels
Linking of different types of fiber optic patch cords

Name of Company /
Country

Project / Department

Position Held

Fiber Optic engineer

Period (From To)

2013-2015

Key Job
Responsibilities

Wiztech Automation Solutions Pvt. Ltd.

Wiztech Automation Solutions Pvt. Ltd.

Installation and termination of fiber optic set up boxes

Preparation of fiber optic cable

Splicing of both single mode and multi mode fiber optic


cables

Industrial Project Management solutions

Fiber and copper cable drum test

Page 4 of 6

OTDR and power meter light source testing of fiber optic


cable after termination

Installation and termination of fiber optic patch panels

Connectorization of fiber optic cable

Set up and troubleshoot popular networks

Work with wires and cables to ensure proper setting up of


complex networks

Diagnose problems using specific tools

Install, test and maintain a variety of personal computing


and network systems

Compile and record all procedures

Ensure complete inventory of related supplies is


maintained

N ote: Add more page s i f re qui re d

Industrial Project Management solutions

Page 5 of 6

Industrial Project Management solutions

Page 6 of 6

Вам также может понравиться