Вы находитесь на странице: 1из 2

Documents Submittal

Reference no.:
Date of Submission:
201_Tecom Hotel
Mr Samir Tayeb
MMA projects

Projects:
Client:
I.D. Consultant:
Main Contractor:
Projects Manager:

Stefania Digregorio

201_DS 011
22/03/16

Signature:

WE REQUEST APPROVAL FOR THE FOLLOWING:

Document Type:

Architectural

Fire Fighting

Plumbing

I.D.

Electrical

Mechanical

Structural

Others

Document No.

Rev.

Document Title

Copies qty.

201_ST02-FF

00

TOWER A-STUDIO ST02 furniture and finishes 01-03-04

3+CD

201_ST02-FF

00

TOWER A-STUDIO ST02 BATHROOM furniture and finishes 02

3+CD

201_ST02-FF

00

TOWER A-STUDIO ST02 details 05

3+CD

201_ST02-EP

00

TOWER A-STUDIO ST02 electrical drawings 01-02

3+CD

201_ST02-EP

00

TOWER A-STUDIO ST02 KITCHEN electrical & drainage drawings 03

3+CD

201_ST02-EP

00

TOWER A-STUDIO ST02 drainage drawings 04

3+CD

201_ST04-FF

00

TOWER A-STUDIO ST04 furniture and finishes 01-03-04

3+CD

201_ST04-FF

00

TOWER A-STUDIO ST04 BATHROOM furniture and finishes 02

3+CD

201_ST04-FF

00

TOWER A-STUDIO ST04 details 05

3+CD

201_ST04-EP

00

TOWER A-STUDIO ST04 electrical drawings 01-02

3+CD

201_ST04-EP

00

TOWER A-STUDIO ST04 KITCHEN electrical & drainage drawings 03

3+CD

201_ST04-EP

00

TOWER A-STUDIO ST04 drainage drawings 04

3+CD

201_ST05-FF

00

TOWER A-STUDIO ST05 furniture and finishes 01-03-04

3+CD

201_ST05-FF

00

TOWER A-STUDIO ST05 BATHROOM furniture and finishes 02

3+CD

201_ST05-FF

00

TOWER A-STUDIO ST05 details 05

3+CD

201_ST05-EP

00

TOWER A-STUDIO ST05 electrical drawings 01-02

3+CD

201_ST05-EP

00

TOWER A-STUDIO ST05 KITCHEN electrical & drainage drawings 03

3+CD

201_ST05-EP

00

TOWER A-STUDIO ST05 drainage drawings 04

3+CD

201_ST06-FF

00

TOWER A-STUDIO ST06 furniture and finishes 01-03-04

3+CD

201_ST06-FF

00

TOWER A-STUDIO ST06 BATHROOM furniture and finishes 02

3+CD

201_ST06-FF

00

TOWER A-STUDIO ST06 details 05

3+CD

201_ST06-EP

00

TOWER A-STUDIO ST06 electrical drawings 01-02

3+CD

201_ST06-EP

00

TOWER A-STUDIO ST06 KITCHEN electrical & drainage drawings 03

3+CD

201_ST06-EP

00

TOWER A-STUDIO ST06 drainage drawings 04

3+CD

201_ST10-FF

02

TOWER A-floor 5th MOCKUP STUDIO ST10 furniture and finishes 01-03-04

3+CD

201_ST10-FF

02

TOWER A-floor 5th MOCKUP STUDIO ST10 BATHROOM furniture and finishes 02

3+CD

201_ST10-FF

02

TOWER A-floor 5th MOCKUP STUDIO ST10 details 05

3+CD

201_ST10-EP

05

TOWER A-floor 5th MOCKUP STUDIO ST10 electrical drawings 01-02

3+CD

201_ST10-EP

05 TOWER A-floor 5th MOCKUP STUDIO ST10 KITCHEN electrical & drainage drawings 03 3+CD

201_ST10-EP

05

TOWER A-floor 5th MOCKUP STUDIO ST10 drainage drawings 04

3+CD

Received By Consultant

For Consultant Use:

Date:

Client's/ Representative Comments:

Review Status:
Approved

Approved As Noted, Resubmit

Not Required

Approved As Noted

Not Approved

Additional Information Required

Recipient

Signature

Date

Concerned Engineer
Resident Engineer
Project Manager
Received by Contractor
Note
1. Workshop drawing rejected must be resubmitted for approval
2. Contractor shall be fully responsible of the approval workshop deawing under the Terms and Conditions of the Contract.
3. Contractor's Statement: We certify that the drawing(s) submitted herewith has(have) been receiwed in detail and in compliance with the
Contract/drawings and specifications except as otherwise stated here above.
4. Corrections or comments made relative to submittals during this review do not relieve the Contractor from complicance with the Contract requirements
and specifications.This check is only for review of general conformance with the design concept of the project and general compliance with the information
given in the Contract documents. The Contractor is responsible for confirming and correlating all quantities and dimensions, selecting fabrication processes
and techniques of construction, coordinating his Work with that of the other trades and performing his Work in a safe and satisfactory manner and no time
and/or cost implication shall be granted due to the Engineer' s/PM instruction.

Вам также может понравиться