Вы находитесь на странице: 1из 7

CURRICULUM VITAE.

MUHAMMAD ZUBAIR
House No. 53-A, Model Colony near Q-Block, Model Town Lahore, Pakistan.
Mobile No: +92-321-9494797
KSA: 00966-591180554
Email-zubairmughal797@gmail.com
OBJECTIVE:
To pursue in an organization where I can utilize my engineering principle to handle
job responsibilities with total dedication and dynamism, with an opportunity to grow and
to establish myself as an asset for the team I belongs to. I am enthusiastic to work as a key
player in a challenging & inventive environment.

PROPOSAL ENGINEER
Khalid Juffali Industrial Company.
May 2012 Present (2.5 years) Jubail Industrial City, KSA.
Responsibilities as Proposal Engineer:

Complete and thorough understanding of the requirements of tender, scope


and clear limits of work, as explained in the Tender Documents. Specially
related to storage tanks fabrication and erection work.

Compiling a detailed list of queries for clarification on ambiguous and missing


information.
Visit sites and attend pre-bid meetings arranged by Customer, if required.

Clarify all queries from the Customer through written and documented
communication through the Manager Proposal.

Compile and prepare BOQs covering complete scope of work.

Provide necessary help to Manager Proposal for the preparation of technical


proposal.

Run technical proposal to check accuracy of all results and also prepare a
comprehensive and accurate commercial proposal.

Transfer final price into Customers format.(If Any)

Help Manager Proposal in replying to post bid clarifications, if any.

Continuously contribute, in an effective manner, in the development and


improvement of Companys bidding system.

Keep an eye on the authenticity and updating of all costing data / factors
provided by various other departments of the Company

Responsibilities as Project Engineer:


During performing my duty in the department of Proposals (KHALID JUFFALI INDUSTRIAL
COMPANY) I performed also as CONSTRUCTION MANAGER at the site of Azmeel Contracting
Company for the complete erection work of THERMIL ENERGY STORAGE TANK CAP.6000 M
near Jubail Industrial College, Jubail.

Subsequent to the award of the Contract by the customer, receives following


job documents from Project Leader and responsible for carrying out all
subsequent activities necessary for job execution within budget, according to
drawings & delivery schedule.
i. Drawings & Technical specification if any
ii. Contract Copy.
iii. Budget.
iv. B.O.Q
v. Material procurement plan.
vi. Material Issue Requisition.

Receives following documents from welding engineer,


i. Weld matrix (WM),
ii. Welding procedure specifications (WPS),
iii. Qualification of welding procedure specification,
iv. Welding consumables estimation.

Forward the estimated consumables and tooling to Store for arrangement .

Responsible for subcontracting of such jobs which are beyond the scope of
Production or uneconomical to fabricate at shop.

Monitor progress for project on weekly basis.

With Quality control, shop supervisor, third party and the Customer for testing
as per QIP.

Hand over the final move order of the completed job to Project leader for
onward shipment to Customer and afterward arrange loading / packing if any.

Own Companys Core & Operating values and ensures their implementation.

Built up close liaison with Production, Store, Quality Control and Project
Management for smooth execution of Project in line with the Customer
requirement.

PROPOSAL ENGINEER / SITE ENGINEER


Sinsina Corner Co. For Contracting
J/V with Zealcon Engineering (Pvt) Ltd.
April 2011 March 2012 (1 years) Jubail Industrial City, KSA.
Responsibilities:

Estimating & costing for, Structure Work and Storage Tanks Fabrication and Erection
projects.

Review of bid invitations, preliminary analysis on scope of work.

Study Tender conditions, contract conditions, specifications, drawings and tender


forms

Attend the Site visits & pre bid meetings for the projects.

Assisting top management on tender related matters.

Distributes tender to concern sections i.e. Electrical & Mechanical for the
estimations.

Checking of Bill of Quantities issued by the client.

Updating all revised documents by checking and keeps up- to-date with the revision
/addendums received from client.

Preparing of BOQ as per drawings, specifications & scope of work if BOQ not
provided by the client.

Sending inquiry to suppliers/vendors for the materials & services required for the
tender.

Evaluation of quotations received from the Suppliers/Subcontractors and prepares


the comparison sheets.

Prepare the direct cost for the project.

Prepare indirect cost of the project.

Prepare the proposal i.e. Commercial as well Technical Proposal within the
stipulated time frame requested by the client for tender submission.

Compiling and checking all the documents prior to submission of the tender.

as a WORKSHOP INCHARGE in Zealcon Engineering (Pvt) Ltd. Lahore. Perform the following
duties.

Fabrication of Steel Structures, Low Pressure Tanks, Tube Heat Exchanger .


Signage Fabrication.
Cost control.
Scheduling(completion of in hand jobs)
Sub-contracting. (Initiation of work as subcontract)
As an Employee shall also carry out any task that are assigned by management
necessary to fulfill the job requirements.

During performing my duty in the department of Proposals (Sinsina Corner Co, For
Contracting) I performed also as SITE ENGINEER at the site of Dialog Services Co. Ltd
(Commercial Port Jubail) for the complete erection work of DIESEL STORAGE TANK
CAP.5500 M - Qty-02 Nos.

SR.PROPOSAL ENGINEER / DIPUTY PRODUCTION MANAGER


Micro Tech Engineering Services Lahore Pakistan
April 2006 Fab 2011 (5 years)
Responsibilities:

Fabrication of Steel Structures, Low Pressure Stainless Steel Tanks, and Telecom
tower Structure.
Fabrication of Stainless Steel Piping, Stainless Steel Structure for Nestle Pakistan.
Preparation of Quotations & Their Submission.
Budget on Proposal Stage.
Sub-contracting.
Pre-Bid Tender evaluation.
Attend Job explanation / site visits.
Floating RFQs to prospective suppliers.
Preparation of Proposal Costing.
Preparation of technical offers.
Liaison with Customers and suppliers.
Preparing bid submittals.
Responsible for post bid clarifications.
Responsible for Proposal data base updating.

PRODUCTION INCHARGE

Cool Industries (Pvt) Ltd., Lahore Pakistan. (WAVES)


April 2002 Jan 2006 (4 years)
Responsibilities:

Fabrication of Steel Structures, related to in house activates .


Fabrication of Stainless Steel Piping, Stainless Steel Structure for foaming
machines.
Pre-Bid Tender evaluation.
Preparation of Quotations & Their Submission.
Budget on Proposal Stage.
Sub-contracting.
Attend Job explanation.
Floating RFQs to prospective suppliers.
Preparation of Proposal Costing.
Preparation of technical offers.
Preparing bid submittals.
Responsible for post bid clarifications.
Proposal data base updating Preparation of Proposal regarding Plastic Parts of AC &
Refrigeration units
Preparation of Proposals & Estimation.
To Participate in Molds designing activities.
To check the Piping work during Commissioning and Installation of Washing Machine
unit
To Monitor & Control the Production Progress according to the requirements against
the Assembly Schedule.
Research and development related to refrigeration parts.

PRODUCTION ENGINEER (WORKSHOP)/ PROPOSAL ENGINEER


INDUSTRIAL ENGINEERING & TRADING (PVT) LTD.
April 1994 Jan 2002 (8 years)
Responsibilities:

After the award of the Contract by the customer, receives the detailed job
documents from Project Leader and responsible for carrying out all subsequent
activities necessary for job execution within budget, according to drawings &
delivery schedule.

Forward the estimated consumables and tooling to Store for arrangement .

Responsible for subcontracting of such jobs which are beyond the scope of
Production or uneconomical to fabricate at shop.

Monitor progress for project on weekly basis.

With Quality control, shop supervisor, third party and the Customer for testing
as per QIP.

Hand over the final move order of the completed job to Project leader for
onward shipment to Customer and afterward arrange loading / packing if any.

Own Companys Core & Operating values and ensures their implementation.

Built up close liaison with Production, Store, Quality Control and Project
Management for smooth execution of Project in line with the Customer
requirement.

Fabrication and erection of piping regarding CNG stations, Pharmaceutical Plants .


To help in Preparation of Layout Plans, Fabrication Plans, Final Inspection
Plans.
Estimation & Proposal preparation.
Scheduling To control completion period of jobs in hand.
Sub-contraction. (Initiation of work as subcontract).
Supervision of Mechanical Installation & Erection Work
Commissioning of Equipment and Machinery, especially in Pharmaceutical Units
(I.V Solution & Infusion Set).
To guide in Procurement schedule of materials from local source.

SENIOR TECHNICIAN
DESCON ENGINEERING WORKS LAHORE, PAKISTAN
April 1990 Jan 1994 (4 years)
Responsibilities:

Preparation of Bill of Quantities of Pressure Vessels, Storage Tanks, Frame


Structures, and cement plants ducts & related accessories.
Preparation of Layout Plans, Quality Control and Final Inspection Plans.
Preparation & Supervision of Layout of Cement Plant Ducts and other parts in
Layout Department.
Supervision during Layout & Cutting of Boiler related materials.
Fabrication of Steel Structures.

ACADEMIC QUALIFICATION:

1985

Metric (Secondary School Certificate)


From the Board of Intermediate & Secondary
Education, Gujranwala, Punjab, Pakistan.

1988

F.A (Higher Secondary School certificate)


From the Board of Intermediate & Secondary
Education, Gujranwala. Punjab, Pakistan.

TECHNICAL QUALIFICATION:
03 Years Diploma in Associate Mechanical
Engineering (1st Division)
Government Polytechnic institute Sialkot.
From the Punjab Board of Technical
Education, Lahore, Pakistan.

1987---1989

PROFESSIONAL TRANINGS:

1- 06 Weeks

Advance Drafting Techniques Grade A From (PITAC)


Pakistan Industrial Technical Assistance Centre Punjab,
Pakistan.

2- 10 Weeks

Press Tool & Mould Design


Grade A From (PITAC)
Pakistan Industrial Technical Assistance Centre Punjab,
Pakistan.

3-

Plastic Mold Design from PITAC organized by SMEDA.

4-

Plastic Application in Light Engineering Industry


At Lahore Chamber of Commerce organized by SMEDA.

5-

Plastic Materials PET & PVC


At Lahore Chamber of Commerce organized by SMEDA.

6-

Proportional Hydraulic Control


At Staff Training Institute, Lahore organized by TEVTA.

7-

Computer Skills (MS Office)

PERSONAL DATA:
Father Name
Date Of Birth
Marital Status
Nationality
Religion
Language Known
Computer
Hobbies

:
:
:
:
:
:
:
:

Muhammad Hanif
11-04-1968
Married
Pakistani
Islam
Urdu, English.
Literate.
Cricket, Book Reading.

Вам также может понравиться