7. Time Schedule of the project.

7.1 Project Time schedule with target and Deliverables.


Consider the following table describing the activities of the project and the deliverables of each
activity.
Activity
Number
1

Activity Name

Description

Writing a
Proposal

Requirements
Collection
Requirements
Analysis and
Documentation
System Design

Document to be presented so
as to be granted authority to
develop the system
Collecting the requirements
needed to develop the system
Analyzing requirements and
altering/changing conflicting
requirements
a. Designing system
architecture, modules,
and interfaces
b. Designing the
database to produce a
detailed data model of
the system
Implementation of the voter
registration module.

Voter
registration.

Candidate /
staff
registration.
Voting

7
8

Election
analysis module

System Testing,
Installation and
Maintenances.

Duration Deliverables
(weeks)
1
Proposal Document

Participants

User story

Requirements
Document

All group
members
All group
members

System
specification.

All group
members

Working module
for voter
registration
Working module
for candidate / staff
registration
Working module
for voting system.
Working module
for displaying
results and generate
report.

One
member

Implementation of the
candidate / staff registration
module.
Implementation of the voting
module.
Implementation of the report
and results of the general
election.

a. Debugging the system


to evaluate the
system's compliance
with its specified
requirements
b. System deployment
and retaining it to
specified operable
condition to achieve

2
5

All group
members

One
member
One
member
All group
members

All group
members
and others

10

Preparing Final
Report

its maximum useful


life.
Involves writing final reports
for the project.

Final Report

All group
members