Академический Документы
Профессиональный Документы
Культура Документы
Email:illias.u@gmail.com
Mobile No: 00966-503836147
00966-591539888
CAREER OBJECTIVE:
A result oriented professional with experience in routine as well as shutdown inspection
of static equipments and piping.
Having more than 9 years of hands on experience in the field of Static Inspection in
Refinery/Petrochemical industry.
Extensively involved in inspection of static equipments like Boilers, Heat Exchangers,
Storage Tanks, Pressure Vessels, Columns, etc. using various NDT techniques.
An effective communicator with excellent interpersonal & relationship management
skills.
Excellent analytical and data interpretation ability.
EDUCATION QUALIFICATION:
Completed B.Tech Engineering in 2007 from Royal institute of technology & science
Affiliated to Jawaharlal Nehru Technological University.
PROFESSIONAL EXPERIENCE:
9+ years of experience, well verse with International standards.
SADARA APPROVED QC WELDING INSPECTOR
ARAMCO APPROVED TANK WELDING QC With SAP#70014927(WGP)
ARAMCO APPROVED WELDING QC(MANIFA)
SATORP APPROVED WELDING QC(SATORP)
SATORP APPROVED NDT INSPECTOR(SATORP)
(Good Knowledge of ARAMCO Standards)
CERTIFICATIONS:
Certified CSWIP 3.2.2 Senior Welding Inspector(Level 3)
CSWIP Certification No
: 66312
Expiry Date
: 29 April 2017.
: 67369
: 31 Aug 2019
API-570-Piping Inspector.
Certification No
Expiry Date
: 64785
: 30 Apr 2019
Additional Qualification:
Passed diploma in QA/QC Piping Inspector, as per ASME B31.1 from
MS Welding Institute, Hyderabad- India.
ASNT NDT Level -- II certification in the following methods:
Dye-Penetrate Testing
Magnetic Particle Testing
Radiographic Testing
Ultrasonic Testing
COMPUTER PROFICIENCE:
Operating System
Packages
:
:
EXPERIENCE:
Project
Client
Contractor
Designation
Duration
:
:
:
:
:
PP1314
EXPERIENCE:
Project
Client
Contractor
Designation
Duration
:
:
:
:
:
SADARA HP-LDPE)
SADARA
Tecnimont Arabia Ltd.
Senior QC Welding Inspector
26th April 2014-31st May 2016
Project
Client
Contractor
Designation
Duration
:
:
:
:
:
SAUDI ARAMCO
SKEC
QA/QC TANK INSPECTOR
30 June 2012-14th April 2014.
Review of RT films and PWHT charts as per applicable codes and specifications.
Various NDT tests witnessing like PT, UT & MPI and visual inspection on finished
welds.
Preparation of quality control reports, inspection reports and punch list of storage tanks
Co-ordination with client and third party QA/QC inspectors for approval of jobs.
Audit the storage, temperature and handling of welding consumables as per procedure
Ensure that all the jobs carried out in strict compliance with applicable codes and specs
Monitoring repair percentage, inspection results and regular site activities
Carry out daily check on welder performance, consumables, WPS and welding machines
Review calibration certificates of instruments and welding machines & Maintaining
Records
Inspected the dimensions, fit up, joint preparation & welding as per drawings and specs
Witnessing of Hydro Test for Tanks & piping and Clearance for Mechanical
Completion.
Conducting of vacuum box test , oil Penetrant Leak test on storage tanks
Verticality and dimensions check on tanks like plumpness, roundness, peaking &banding.
Witnessing Pneumatic Test for Reinforcement pads of Nozzles
Review the final settlement of tank foundation as per client specifications
Preparation and maintaining the quality control documents and reports Maintaining
and implementing ISO Standards and Project Specifications
Prepared punch list and verified if rectified of construction prior to test.
To check Calibration Certificates of, Pressure Gauges, PSV, Manifolds
Witnessing of Hydro Test for Tanks & piping and Clearance for Mechanical Completion.
Preparation of test packages and completion of QA/QC Dossiers at project completion time.
Project
Client
Contractor
Designation
Duration
:
:
:
:
:
Project
SATORP
SKEC
QC WELDING INSPECTOR
OCT 2011 to May 2012
Client
Contractor
Designation
Duration
:
:
:
:
SAUDI ARAMCO
SAIPEM
QC WELDING INSPECTOR
April 2011 to Oct 2011
Project
Designation
Duration
Contractor
:
:
:
:
Project
Designation
Duration
Contractor
:
:
:
:
Project
Designation
Duration
:
:
:
Monitored in-process welding parameters such as Amps, Voltage, Travel speed, heat
input, weaving, preheat & inter-pass temperature requirements, post heating.
Inspected various materials such as Carbon Steels, LTCS, Cr-Mo, Stainless Steels
according to QCP, ITP & WPS.
Inspected Consumables, their package, handling and storage and reviewed batch test
results.
Conducted Weld visual inspection and prepared daily welding reports.
Inspected joint Fit-up, diameter, schedule, root gap, internal misalignment, rotation etc
and PMI wherever required.
Reviewed ISO, Spool fabrication drawings, Weld Map.
Inspected various materials such as C-Mn Steels, LTCS, Cr-Mo, Stainless Steels
according to QCP, ITP & WPS.
Inspected Consumables, their package, handling and storage and reviewed batch test
results.
Inspected joint Fit-up, diameter, schedule, root gap, internal misalignment, rotation etc
and PMI wherever required
Monitored in-process welding parameters such as ampere, voltage, travel speed, heat
input, weaving, preheat & inter-pass temperature requirements, post heating
Reviewed calibration of welding machines, baking and holding ovens quivers, and
inspection tools
Inspected root for branch welds like sock-o-lets, weld-o-lets , reinforced branch
connection and other welds wherever accessible
Witnessed NDE wherever applicable
Witness of Hydro & Pneumatic Test as per required specification.
Check and assure that all joints are exposed for examination during pressure test. Ensure
that isolation or disconnection of equipments not to be tested. Check vents are open when
filling and draining lines.
After completion of Hydro-test & Re-instatement arranging all Documents in set Package
and submitting it to client.
Company
Position
Duration
:
:
:
Performing inspection for piping material storage & handling for visible damages. For
conformity to specification (size, scheduling, rating, marking, color code requirements)
mill certificates, packing list material identification and traceability according to material
PERSONAL PROFILE:
Name
Mobile #
Email Id
Nationality
DOB
Marital Status
Language
Iqama Status
Driving License
:
:
:
:
:
:
:
:
: