building cost per m2 / USD
Iceland
3,319
Sweden
4,127
South Africa
2,495
India
1,222
Canada
5,583
Cost per square metre to build a domestic airport in the given country. A quant
U.S.A
3,620
comparing infrastructure building costs, the most useful and comparative
avail
UK
4,184
factory cost / local currenfactory cost / USD Cost of two laser cutters / USD
54,554,971
491,752
76,000
5,472,962
611,504
76,000
4,994,890
369,718
76,000
12,083,489
181,080
76,000
1,108,594
827,309
76,000
620,000
620,000
76,000
573,277
716,597
Cost of two polishers / USD Cost of (avg) one CVD machine / USD
10,000
350,000
10,000
350,000
10,000
350,000
10,000
350,000
10,000
350,000
10,000
350,000
Initial investment (one CVD machine) /USD cycles till break even
927,752
1,047,504
805,718
617,080
1,263,309
1,056,000
59
70
55
44
89
92
It should be noted that the more machines one acquires the more
personnel would be needed to operate them. It would be sensible to
buy multiple polishers and laser cutters too, so as to reduce risk of the
operation halting due to malfunction and to increase capacity. This
would set back the time frame until profitability somewhat, but not
excessively.
Country
Cost of electricity / US cents/kWh
Iceland
Sweden
South Africa
India
Canada
U.S.A
5.54
6.00
8.46
9.00
10.00
12.00
Methane
Methane with university discount (25%)
Hydrogen
Hydrogen with univeristy discount (25%)
etween
EDP
$180.
e
led.
e) per
e of
H2 per cycle
77.54
1.73
77.54
1.73
77.54
1.73
77.54
1.73
77.54
1.73
77.54
1.73
A high pwer MW reactor typically uses 5 mL of methane and 500 mL
of Hydrogen per minute. Average cycle time = 3.5 days. Therefore
consumption / cycle = 3.5x24x60 x Volume of gas used in 1 minute
= 5040 x 0.5 (Litres)(H2 ) and 0.005 (litres Methane) = 2520 and
25.2.
estimate
ne
le.
850.58
637.94
4,061.87
3,046.40
certifying one batch of diam Total operational cost per cycle pre jewellifying
1,080
3535
1,080
4096
1,080
3033
1,080
1601
1,080
3889
1,080
4428
rs being
The Gemological Institute of
h 4 America (GIA) can certify a
stones
diamond. Research would
e
suggest $64 for a .5 crat
e what
diamond, $120 for a 2 carat
stone. As we would only be
looking to certify larger
ine stones, the higher end price is
)(timewhat
to I am using in this
/ 100calculation. I have included a
n cents)
40% industry discount on this
as the price quoted is for
individuals with individual
stones.
the
venue
old
corporation tax / %
Job title
technician
researcher
security
contracted photographer (Part time)
website curator and manager
goldsmith
laser cutter
marketer
sales executive
total
Country
United Kingdom
Iceland
Sweden
South Africa
India
Canada
U.S.A
42700
54900
21000
10000
35000
42000
38000
27000
28000
298600
3065
2431
3023
1838
295
2724
3263
-17543356
50%
110%
2
at of
ed buy
20% off
discount derived / %
83
To the proportion of
those questioned which
this is relevant, a
discount of 83% the
price of a mined gem
was deduced. Which is
near enough 20%
GBP
ctober 2016
Canadian Dollar
1.62