Project :-Construction of School Building(RCC Frame-4 Rooms on Ground Floor)
Site :-Sen Ucha ma Bi
School's Name :-Sen Ucha Ma Bi Tansen,Palpa
Fy :-2067/68
S.N.
Description
Unit No Length(L) Breadth(B) Height(H) Quantity Remarks
E/W in Excavation

E/W in trenches,foundation etc in hard soil including timbering and shoring,pumping out water from trenches if
necessary,dressing of sides,lift up to 1.5mtr,stacking of excavated material at least 3 mtr,clear from edge of
excavation,backfilling stacked soil in 150mm layers by ramming & disposing all surplus excavated materials within
the site all complete
Footing F1
4.0
2.00
2.00
1.75
28.00
Footing F2
2.0
2.30
2.30
1.75
18.52
Footing F3
8.0
2.65
2.65
1.75
98.32
Footing F4
2.0
3.20
3.20
1.75
35.84
Footing F5
2.0
3.65
3.65
1.75
46.63
Wall
Grid 1
1.0
16.60
0.23
0.72
2.75
Grid 2
1.0
12.85
0.23
0.73
2.16
m3
Grid 3
1.0
17.30
0.23
0.73
2.90
Grid A & F
2.0
5.35
0.23
0.73
1.80
Grid B & E
2.0
3.70
0.23
0.73
1.24
Grid C & D
2.0
4.33
0.23
0.73
1.45
Step
1.0
4.80
0.90
0.15
0.65
Ramp including Platform
1.0
6.50
1.30
0.15
1.27
1.0
3.25
1.30
0.15
0.63
Plinth Protection
1.0
73.30
0.50
0.15
5.50
Sub-Total
247.65
Stone Soling Work
Stone Soling in foundation & floor laid in line & level including filling in the joints with sand all complete
Footing F1
4.0
2.00
2.00
0.15
2.40
Footing F2
2.0
2.30
2.30
0.15
1.59
Footing F3
8.0
2.65
2.65
0.15
8.43
Footing F4
2.0
3.20
3.20
0.15
3.07
Footing F5
2.0
3.65
3.65
0.15
4.00
Wall
Grid 1
1.0
16.60
0.23
0.15
0.57
Grid 2
1.0
12.85
0.23
0.15
0.44
m3
Grid 3
1.0
17.30
0.23
0.15
0.60
Grid A & F
2.0
5.35
0.23
0.15
0.37
Grid B & E
2.0
3.70
0.23
0.15
0.26
Grid C & D
2.0
4.33
0.23
0.15
0.30
Step
1.0
4.80
0.90
0.15
0.65
Ramp including Platform
1.0
6.50
1.30
0.15
1.27
1.0
3.25
1.30
0.15
0.63
Plinth Protection
1.0
73.30
0.50
0.15
5.50
Sub-Total
30.07

Prepared By:

Checked By:

Approved By:

P.C.C Work(1:3:6)For RCC Work


Plain Cement Concrete 1:1.5:3 blinding concrete under wall,floor & column found n etc including protection of

sides,laying compacting,curing with all complete


Footing F1
4.0
2
2
0.1
1.60
Footing F2
2.0
2.3
2.3
0.1
1.06
Footing F3
8.0
2.65
2.65
0.1
5.62
Footing F4
2.0
3.2
3.2
0.1
2.05
Footing F5
2.0
3.65
3.65
0.1
2.66
Wall
Grid 1
1.0
16.6
0.23
0.1
0.38
Grid 2
1.0
12.85
0.23
0.1
0.30
m3
Grid 3
1.0
17.3
0.23
0.1
0.40
Grid A & F
2.0
5.35
0.23
0.1
0.25
Grid B & E
2.0
3.7
0.23
0.1
0.17
Grid C & D
2.0
4.33
0.23
0.1
0.20
Step
1.0
4.8
0.9
0.1
0.43
Ramp including Platform
1.0
6.5
1.3
0.1
0.85
1.0
3.25
1.3
0.1
0.42
Plinth Protection
1.0
73.3
0.5
0.1
3.67
Sub-Total
20.04
P.C.C Work(1:2:4)For RCC Work
Plain Cement Concrete 1:1.5:3blinding concrete under wall,floor & column found n etc including protection of
sides,laying compacting,curing with all complete
Footing F1
4
Footing F2
2
Footing F3
8
Footing F4
2
Footing F5
2
Slope Protection on Footing
Footing F1
4
Footing F2
2
Footing F3
8
Footing F4
2
Footing F5
2
Column C(50cm up of 1st floor Lvl)
18
Tie Beam
Long wall
3*2
Short wall
6*2
m3
Main Beam
Long wall
3*2
Short wall
6*2
Secondry beam Long wall
3
Short wall
4
Staircase-waist slab Lower one
2*2
Landing Slab
1*2
Step
18*1/2
Slab
2*1
Deduction Opening-Footing F1
Footing F2
Footing F3
Footing F4
Staircase wall
Prepared By:

4*4/2
4*4/2
2*4/2
2*4/2
2

2
2.3
2.65
3.2
3.65

2
2.3
2.65
3.2
3.65

0.25
0.25
0.25
0.25
0.4

4.00
2.65
14.05
5.12
10.66

4
5.29
7.02
10.24
13.32
0.4
27.2
4.2
27.2
4.2
27.2
3.94
3.08
2.77
1.2
31.2

0.16
0.16
0.16
0.16
0.16
0.4
0.23
0.23
0.3
0.3
0.23
0.23
1.2
1.8
0.3
11.6
Total
0.4
0.4
0.4
0.4
2.77

0.05
0.1
0.15
0.2
0.23
5.38
0.3
0.3
0.5
0.5
0.3
0.3
0.17
0.17
0.15
0.13

0.13
0.17
1.35
0.66
0.98
15.49
11.26
3.48
24.48
7.56
5.63
1.09
2.51
1.70
0.49
94.10
207.53
0.67
1.09
0.72
1.01
3.74

1.4
1.7
1.8
2.1
4.5

Checked By:

0.15
0.2
0.25
0.3
0.15

Approved By:

Total of Deduction
Sub-Total

7.23
200.31

Formwork

Formwork centering & shuttering with approved material such as shuttering plywood,local wood or plain sheet
etc.for all RCC works of any shape,size & at any level with necessary
propping,scafolding,staging,supporting,cutting holes for utilization works etc.including providing final sureface and
oil & removal of forms all complete
Footing F1
4*4
1.4
0.2
4.48
Footing F2
4*4
1.7
0.2
5.44
Footing F3
2*4
1.8
0.2
2.88
Footing F4
2*4
2.1
0.2
3.36
4
1.2
10.15
48.72
Column
8
1.2
7.3
70.08
Lower & upper tie beam
1*2
139.8
0.35
97.86
2
Main beam m
1*2
139.8
0.25
69.90
Top
1
27.6
0.25
6.90
Slab 1st floor
1*2
10.2
14.2
289.68
Top
1
6.75
0.15
1.01
Stairecase lower
2*2
3.08
1.2
14.78
Landing
1*2
2.77
1.8
9.97
Deduction stair hall
-2
4.5
2.77
-24.93
Sub-Total

600.14

Reinforcement work
Fixing torsteel reinforcement grade 1 conforming to I.S.1786-1985 in RCC work including
cleaning,cutting,bending,placing in position and binding with no 16 swg annealed binding wire all complete
Bottom mesh of column
Footing F1-12mm dia. bar
4*28
2
224.00
Footing F2-12mm dai. bar

4*32

2.3

294.40

Footing F3-12mm dai. bar

Rm 2*36

2.65

190.80

Footing F4-12mm dai. bar

2*42

3.2

268.80

Footing F5-12mm dai. bar

2*50

3.65

365.00

Sub-Total

1343.00 Rm

1343Rm @ 0.89kg/Rm (A)

1195.27 kgs

Vertical bar in column

C1-20mm dia.bar

4*4

7.65

122.40

25mm dai.bar

4*4

8.15

130.40

8*8

8.15

521.60

C3-25mm dai.bar

2*10

8.15

163.00

C4-25mm dai.bar

2*12

8.15

195.60

Rm

C2-25mm dai.bar

Sub-Total

i-122.40

(122.40 Rm @ 2.45kgs+1010.60 Rm @ 3.83kgs)/Rm (B)

1010.60

4170.48 kgs

Beam
Lower tie beam & Plinth beam
Grid A,B,C&D-16mm dai
Grid 1,3,5,6,8&10-16mm dai

Main beam
1st floor beam
Grid 1-1
Prepared By:

Rm

2*4*6

33.2

2*6*6
12.4
Sub-Total
2486.40 Rm @ 1.58kg/Rm

1593.60
892.80
2486.40
3928.51 kgs

Rm
Checked By:

Approved By:

Rm
Top Bar-25mm dai.through out
3
38.2
114.60 Rm @ 3.83kg/Rm(D)

114.60 Rm
435.48 kgs

At junction of grid A & F


20mm dai
At junction of grid B & E-20mm dai

Rm

At junction of grid C & D-20mm dai

2*3
2*3
2*2

2.9
4.2
3.35

17.40
25.20
13.40
56.00 Rm
137.20 kgs
105.60
258.72 kgs

56 Rm @ 2.45kg/Rm(E)
Bottom bar-20mm dai.throught
3
35.2
105.60Rm @ 2.45kg/Rm(F)
Bottom extra bar
Rm
At junction of grid C & D-16mm dai
2
6.46
12.92 Rm @ 1.57kg/Rm(G)
Grid 2-2
Same As Grid 1-1(I)
Grid 3-3
Same As Grid 1-1(J)
Rm
Grid A-A
Top bar-20mm dai through out
3
13
39 Rm @ 2.45kg/Rm(K)
Top extra bar
At junction of grid 1&3-20mm dai
2*3
2.5
Rm
At junction of grid 2-20mm dai
3*2
3.4
Bottom bar-20mm dai.throught
3
13

Grid B,C,D,E & F


Secondry Beam
Grid 1'-1'

Rm

12
12

15
15

Prepared By:

Rm

4*4
4*2

11.6
12

20*2

30*4
22*2
Rm
10*2
10*2
13*2

5.07
1.2
3.16
0.88
2.45
2.12

896
1060
1184
108

1.8
1.12
1.21
1.21

Checked By:

15.00
20.40
39.00
74.40 Rm
182.28 kgs
1389.15 kgs

180.00
180.00
360.00 Rm
565.20 kgs

360 Rm @ 1.57 kg/Rm(N)


Grid A'-B',B'-B',D'-D'&E'-E
From grid A to C & D to F
16mm dai through out
20mm dai through out
Staircase
Lower flight-12mm dai bar
8 dai bar
Landing-8mm dai bar
12mm dai bar
12mm dai bar
12mm dai bar
Stirrups
Column-8mm dai
Beam-Lower & Upper Beam
Main Beam 1st & 2nd
Top Beam

Rm
kgs
kgs
kgs

39.00 Rm
95.55 kgs

74.4 Rm @ 2.45kg/Rm(L)
5 Nos @ (95.55+182.28)kg(M)

From grid A to C & D to F-20mm dai

Grid 2'-2'

12.92
20.28
851.68
851.68

202.80
144.00
139.04
17.60
49.00
55.12

92.8
96

145.70 kgs(O)
235.20 kgs(P)

0.89
0.39
0.39
0.89
0.89
0.89

180.49
56.16
54.23
15.66
43.61
49.06

kgs(Q)
kgs
kgs(S)
kgs(T)
kgs(U)
kgs(V)

1612.80
1187.20
1432.64
130.68
4363.32 Rm
Approved By:

4363.32 Rm @ 0.39kg/Rm(W)

Slab
Long Span-8mm dai bar
Extra top bar
Hook bar
main bar for passage
Main bar for Short Span
Main bar for Passage
6

Extra top bar


Distribution Bar
Long Span-8mm @ 200 C/C
Short Span-Out Side
Inside
Passage

93
250
560
29
29
Rm
32*2
32*2
10
9
73

31.2
11.6
2
1.55
4.55
5.25
5.93
5.25
4.8
1.875

9*4
9*2
Rm 10*2
8*2
4*2

5.57
14.2
10.2
10.2
4.8

1701.69 kgs

2901.60
2900.00
1120.00
44.95
131.95
336.00
379.52
52.50
43.20
136.88
200.52
255.60
204.00
163.20
38.40
8908.32 Rm
3474.24 kgs
20037.54 kgs

8908.32Rm @ 0.39kg/Rm(X)
Total
Brick work in foundation

First Class Brickwork in sub-structure in(1:4) cement sand mortar with approved quality bricks in perfect line &
level with necessary scaffolding including wetting the bricks,properly packing the joints & curing the works with all
complete

Grid B & D
Grid A, B, C, D, E & F
Step 1st
Ramp wall
Platform wall
Appron
2nd Step
3rd Step

2.0
6.0
1.0
1.0
m3
1.0
1.0
1.0
1.0
Sub-Total

27.2
9.20
3.30
3.65
5.24
40.80
3.30
3.30

0.23
0.23
0.60
0.23
0.23
0.23
0.60
0.30

0.65
0.65
0.20
0.58
0.58
0.13
0.15
0.15

8.13
8.25
0.40
0.49
0.70
1.22
0.30
0.15
19.63

Brickwork in Superstructure

Frist class Brickwork in super structure in (1:4) cement sand mortar with approved quality bricks in perfect line &
level with necessary scaffolding including wetting the bricks,properly packing the joints & curing the works with all
complete
Ground floor
Long wall
2.0
27.20
0.23
2.45
30.65
Short wall
6.0
7.65
0.23
2.45
25.86
m3
Deduction for openings
Door D
-9.0
1.05
0.23
2.10
-4.56
Window W
-14.0
1.50
0.23
1.35
-6.52
Sub-Total
45.43
Sal Wood for D/W frame
Prepared By:

Checked By:

Approved By:

Sal wood for chaukats with fixing size of door & windowcwith necessary fittings all complete
Door D
9
5.25
0.075
0.1
m3
Window W
14
8.4
0.075
0.1
Sub-Total

0.35
0.88
1.24

Panneled shutter
Supplying & fixing of flush door shutter in counter in 38x75mm salwood frame with 4mm thck commercial
plywood on both side & necessary morticelock,hings,towerbolt,handles etc.as per drawing,specification and
10 instruction
Door D
9.00
0.93
2.05
17.16
m2
Window W
14*3
0.43
1.23
22.21
Sub-Total
39.37
Flooring work
a.Earth filling work with compaction

Earthwork in filling under floors with good quality earth in 150 mm thck layers with sprinking water,ramming &
consolidating with all complete
Rooms
4.0
7.65
6.05
0.45
83.31
Stair Hall
1.0
7.23
2.77
0.45
9.01
3
Passage m
1.0
13.07
1.54
0.45
9.06
Ramp
1.0
8.00
1.20
0.23
2.16
Platform
1.0
3.10
1.20
0.60
2.23
Sub-Total
105.77
b.Stone solling in floor laid in line & level including filling in the joints with sand all complete
Rooms
4.0
7.65
6.05
0.15
27.77
Stair Hall
1.0
7.23
2.77
0.15
3.00
3
Passage m
1.0
13.07
1.54
0.15
3.02
Ramp
1.0
8.00
1.20
0.15
1.44
Platform
1.0
3.10
1.20
0.15
0.56
Sub-Total
35.79
c.75mm thck PCC Work
Plain cement concrete 1:2:4 blinding concrete under wall,floor & column foundation etc.including protection of
sides,laying compacting,curing with all complete
Rooms
4.0
7.65
6.05
0.08
14.81
Stair Hall
1.0
7.23
2.77
0.08
1.60
11
3
Passage m
1.0
13.07
1.54
0.08
1.61
Ramp
1.0
8.0
1.2
0.08
0.77
Platform
1.0
3.1
1.2
0.08
0.30
Sub-Total
19.09
d.Plaster work
12.5mm thck cement sand plaster 1:4 on floor in perfect line & level with top quality finish including necessary
wetting the sureface & curing the plastered surefaces with all complete
Rooms
4.0
7.65
6.05
185.13
Stair Hall
1.0
7.23
2.77
20.03
2
Passage m
1.0
13.07
1.54
20.13
Ramp
1.0
8.00
1.20
9.60
Platform
1.0
3.10
1.20
3.72
Sub-Total
238.60
e.Cement Punning Work
3mm thck neat cement sand punning work over cement sand plaster in line & level with throwelling the top sureface
to give a smooth finish on floor,wall & skirting etc in perfect line & level including cleaning,curing with all
complete
Prepared By:

Checked By:

Approved By:

Rooms
4.0
Stair Hall
1.0
2
Passage m
1.0
Ramp
1.0
Platform
1.0
Sub-Total

7.65
7.23
13.07
8.00
3.10

6.05
2.77
1.54
1.20
1.20

185.13
20.03
20.13
9.60
3.72
238.60

Plaster work
12.5mm thck cement sand plaster 1:4 on walls,ceilling etc.in perfect line & level with top quality finish including
necessary scaffolding,,raking the joint,wetting the sureface & curing the plastered surefaces with all complete
Inside wall in rooms
Front and back side wall
4*2
6.05
2.85
137.94
Left and right side wall
4*2
7.65
2.85
174.42
Top Floor wall
1
16.5
2.85
47.03
0.00
Outside wall in room-1st & 2nd floor
12 Front and back side wall
2
29.6
9.6
568.32
Left and right side wall
2
8.45
9.6
162.24
m2
Top Floor wall
1
19.3
2.85
55.01
Step
18*2
1.2
0.3
12.96
Step
18*2
1.2
0.15
6.48
Deduction for openings
Door D
-9.0
1.05
2.1
-19.85
Window W
-14.0
1.5
1.35
-28.35
Sub-Total
1116.20
Snowcem paint
Weathered coat(Apex)Paint,2 coat over one coat primer of approved colour and shade as per specification and
13 instruction all complete
Equivalent to plastering works
m2
1116.20
Enamel Paint
Two coat ready made enamel paint of approved colour & shade over one coat of primer as per specification and
instruction
Door D
9.0
0.9
2.1
17.01
14
2
Window W m
14.0
1.5
1.35
28.35
Ventilation
11.0
1.2
0.6
7.92
Total
53.28
Net-Total(53.28*2.25)
119.88

Prepared By:

Checked By:

Approved By:

Prepared By:

Checked By:

Approved By:

Government of Nepal
Department of Education
District Education Office,Palpa

Abstract of Cost
Project :-Construction of School Building(RCC Frame-4 Rooms on Ground Floor)
Site :-Sen Ucha ma bi
School's Name :-Sen Ucha ma Bi,Tansen,Palpa
Fy :-2067/68
S.N.
Description of Work
Quantity
Unit
Rate(NRs)
Amount
Remarks
1

E/W Excavation

247.65

m3

185.40

45914.24

Stone Soling

30.07

m3

2295.00

69000.54

P.C.C(1:3:6) Work for R.C.C

20.04

5883.40

117925.28

P.C.C(1:2:4) Work for R.C.C

200.31

m3

7524.00

1507100.03

5
6

600.14
20.04
19.63

m
MT

267.93
80180.50

160795.11
1606817.22

Formwork
Reinforcement work
Brickwork in Foundation(1:4)

m3

6901.75

135498.92

Brickwork in Superstructure(1:4)

45.43

m3

6901.75

313575.49

Sal Wood for D/W Frame

1.24

m3

75185.40

92957.35

39.37

m2

4302.08

169382.78

105.77

m3

221.25

23401.66

35.79

m3

2295.00

82139.74

11 c)75mm thck P.C.C.(1:2:4) Work

19.09

m3

7524.00

143621.06

d)Plaster Work(1:4) 12.5mm thck

238.60

m2

133.99

31970.67

e)Cement Punning Work

238.60

m2

117.62

28064.71

12 Plaster Work(1:4) for 12.5mm thck

1116.20

m2

133.39

148889.25

13 Snowcem Paint

1116.20

m2

53.00

59158.34

m2
124.96
Total Cost
Supervision & Monitoring Cost @ 2.5% of Total Cost(Contingencies)
Grand Total

14980.20
4751192.59
118779.81
4869972.41

10 Panelled Shutter
Flooring Work a)Earth filling work
b)Stone Filling in Floor

14 Enamel Paint

Prepared By:

119.88

Checked By:

Approved By:

Prepared By:

Checked By:

Approved By:

RATE ANAYSIS FOR CIVIL WORKS


Excavation of soft soil, disposal upto
10m lead and 1.5m lift
Item No.
per
1
1
cu.m.
Norms - 2(9) page 6
E/W excav.in found.- soft soil
Earth Filling work for flooring with proper
compaction /1 cu.m.
Item No.
2
1
Norms - 2(9) page 6
E/W in filling.- soft soil

per

Unskilled
Equipment
3%of labour
Sub-Total

m.d.

1.00

Unskilled
m.d.
soil
cu.m
Equipment 3%of labour
Sub-Total

0.50
1.00

Unskilled
m.d.
Stone
cu.m
Sand
cu.m
Equipment 3%of labour
Sub-Total

2.00

cu.m.

Boulder solling in foundation in Perfect line


and level for 1 cu.m.
Item No.
per
3
1
cu.m.
Norms - 2(9) page 6
Boulder solling in foundation
Chimney (bhatta) brick masonry works
along with supplying bricks making
cement sand mortar and construction
of brick wall including haulage distance
upto 30m
a) 1:4
Item No.
per
4
1
cu.m.
Norms - 5(1b)3 page 23 & 5(2)a page 24
Brick work in c.m. - 1:4
Chimney (bhatta) brick masonry works
along with supplying bricks making
cement sand mortar and construction
of brick wall including haulage distance
upto 30m

skilled
unskilled
Brick
Cement
Sand
Add.unkill
Scaffolding
Sub-Total

skilled
unskilled
Brick
Cement
Sand

1.10
0.71

m.d.
1.50
m.d.
2.20
nos.
560.00
bags
2.00
cu.m
0.28
m.d.
0.20
3% of add. Unskilled

m.d.
m.d.
nos.
bags
cu.m

1.50
2.20
560.00
1.40
0.30

a) 1:6
Item No.
per
5
1
cu.m.
Norms - 5(1b)3 page 23 & 5(2)a page 24
Brick work in c.m. - 1:6

Add.unkill
Scaffolding
Sub-Total

m.d.
0.20
3% of add. Unskilled

Concreting of foundation, vertical faces


walls (cement concrete) including supply
of materials and haulage distance upto
30 m
a) P.C.C.(1:3:6)
Gravel_2 =20 mm gravel from river
Item No.
per
6
1
cu.m.
Norms-7(2)c page 30
P.C.C. - 1:3:6

skilled
unskilled
cement
gravel_1
sand
Sub-Total

m.d.
m.d.
bags
cu.m.
cu.m.

1.00
4.00
4.40
0.89
0.47

Concreting of foundation, vertical faces


walls (cement concrete) including supply
materials and haulage distance upto 30m
a) P.C.C.(1:2:4)
Gravel_3 =10 mm gravel from river
Item No.
per
7
1
cu.m.
Norms-7(2)d page 31
P.C.C. - 1:2:4 - river gravel

skilled
unskilled
cement
gravel_1
sand
Sub-Total

m.d.
m.d.
Bags
cu.m.
cu.m.

1.00
4.00
6.40
0.85
0.4450

Concreting works of super structure


deck slabs, beams including supply
of materials and haulage distance upto
30 m a) P.C.C. 1:1.5:3
Gravel_3 =10 mm crushed gravel
Item No.
per
8
1
cu.m.
Norms-7(4)a page 46
PCC for RCC (1:1.5:3) - broken gravel

skilled
unskilled
cement
gravel_1
sand
Sub-Total

m.d.
m.d.
bag
cu.m.
cu.m.

0.80
7.00
8.00
0.86
0.425

Cutting, bending, placing in position as


shown in the drawing & binding by GI
wire of reinforcement steel bar for RCC
works incl. haulage dist. upto 30m
Item No.
per
9
1
kg

skilled
unskilled
iron rod
bind.wire
Sub-Total

m.d.
m.d.
m.t.
kg

0.01
0.01
1.05
0.01

Norms-7( 5) page 33
Iron rod( TOR steel) for RCC
Making wooden form work including supply
and selection of materials fixing, nailing
according to drawings, placing separators, dismantling forms and hauling
upto 30 m distance
Item No.
per
10
10
sq.m.
Norms-8(2)a page 37
Form work
12.5 mm thick cement sand plastering
works
a) Cement sand ratio - 1:4
Item No.
per
11
100
sq.m.
Norms-12(1c) page 67
1/2" cement plaster in c.m. - 1:4
12.5 mm thick cement sand plastering
works
a) Cement sand ratio - 1:6
Item No.
per
12
100
sq.m.
Norms-12(1d) page 67
1/2" cement plaster in c.m. - 1:6

3 mm thick fine cement rubbing works

Item No.
13
10
Norms-11(20) page 66
3mm cement punning

per

skilled
unskilled
wood
killa

m.d.
m.d.
cu.m.
kg

0.17
0.26
0.007
0.25

skilled
unskilled
cement
sand
Sub-Total

m.d.
m.d.
bags
cu.m

0.120
0.160
0.108
0.015

skilled
unskilled
cement
sand
Sub-Total

m.d.
m.d.
m.t.
cu.m

0.120
0.160
0.076
0.016

skilled
unskilled
cement
Sub-Total

m.d.
m.d.
kg

0.10
0.10
5.32

skilled
unskilled
cement

m.d.
m.d.
bags

0.13
0.20
0.34

Sub-Total

sq.m.

50mm thick PCC (1:2:4) Concreting Flooring with


cement finished works

Gravel_1 =12 mm gravel from river


Item No.
14
10
Norms-11(1)b page 60
PCC (1:2:4) - river gravel

per

Gravel_1 =12 mm gravel from river


per

0.05
0.023

skilled
unskilled
cement
gravel_1
sand
Sub-Total

m.d.
m.d.
bags
cu.m.
cu.m.

0.13
0.30
0.52
0.07
0.034

skilled
unskilled
Salwood
holdfast
screw
Sub-Total

m.d.
m.d.
cu.m.
nos
nos

3.40
3.40
1.10
92.00
184.000

skilled
unskilled
Salwood
100 mm kabja
150 mm chheskini
300 mm chheskini
250 mm locking set
handle
screw
Sub-Total

m.d.
m.d.
cu.m.
nos
nos
nos
nos
nos
ls

0.47
2
0.04
3
0.5
0.5
0.1125
0.5
20

Sqm

Supplying and fixing sal wood


chaukat frame works for doors and windows
the sal wood matured free from wraps, knots
holes and other defect all complete 1 cu.m.
Item No.
16

cu.m.
cu.m.

Sqm

75mm thick PCC (1:2:4) Concreting Flooring with


cement finished works

Item No.
15
10
Norms-11(1)b page 60
PCC (1:2:4) - river gravel

gravel_1
sand
Sub-Total

per
1

Cum

Wood work(Chaukhat)
Sal Wood Shutter of 40mm

Item No.
17

per
1

Wood work(40mm Shutter)

Sqm

KS
350.00

350.00
10.50
360.50

350.00
150.00

175.00
150.00
5.25
330.25

350.00
2000.00
1589.18

700.00
2200.00
1128.31
21.00
4049.31

550.00
350.00
7.00
550.00
1589.18
350.00

825.00
770.00
3920.00
1100.00
444.97
70.00
23.10
7153.07

550.00
350.00
7.00
550.00
1589.18

825.00
770.00
3920.00
770.00
476.75

dd. Unskilled

S.N.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Items Name
Skilled Mason
Unskilled Mason
Brick
Cement
Sand
Aggregates
MS Rod
Binding Wire
Killa
wood
Stone
holdfast
screw
soil

Units
md
md
Nos
Bags
Cuft
Cuft
kg
kg
Kg
cu.m.
cu.m.
nos
nos
cum

Rate
550.00
350.00
7.00
550.00
45.00
65.00
90.00
110.00
120.00
50000
2000
50
1
150

350.00

70.00
2.10
6833.85

550.00
350.00
550.00
2295.48
1589.18

550.00
1400.00
2420.00
2042.97
746.91
7159.88

550.00
350.00
550.00
2295.48
1589.18

550.00
1400.00
3520.00
1951.15
707.18
8128.33

550.00
350.00
550.00
2295.48
706.00

440.00
2450.00
4400.00
1974.11
300.05
9564.16

550.00
350.00
90.00
110.00

6.60
4.20
94.50
1.10
106.40

dd. Unskilled

550.00
350.00
50000.00
120.00

94.60
89.95
350.00
30.00
564.55

550.00
350.00
550.00
1589.18

66.00
56.00
59.18
23.20
204.38

550.00
350.00
550.00
1589.18

66.00
56.00
42.02
24.95
188.97

550.00
350.00
11.00

55.00
35.00
58.52
148.52

550.00
350.00
550.00

68.75
70.00
187.00

2295.48
1589.18

105.59
36.55
399.14

550.00
350.00
550.00
2295.48
1589.18

68.75
105.00
286.00
156.09
54.03
601.12

550.00
350.00
50000.00
50.00
1.00

1870.00
1190.00
55000.00
4600.00
184.00
60974.00

550.00
350.00
50000.00
50.00
50.00
50.00
50.00
200.00
2.00

258.50
700.00
2000.00
150.00
25.00
25.00
5.63
100.00
40.00
3045.63

Remarks

line and level including 1.5 m lift and 30 m lead.


for 1 cu.m.
Unskilled

4
4.1

1.00

485.00

nos
cu.m.
cu.m.

2.00
1.10
0.71

485.00
1430.00
960.00

Boulder solling in foundation in Perfect line


and level for 1 cu.m.
Unskilled
Stone
Sand

nos

Plain cement concrete in foundation with


cement sand and aggregate in 1:3:6 including
mixing, laying, curing, and finishing all
complete work for 1 cu.m.
Unskilled
Skilled
Cement
Sand
Agg.

m/days
m/days
bags
cu.m.
cu.m.

4
1
3.9
0.47
0.85

485.00
660.00
795.00
960.00
1760.00

R.C.C. Works:Plain Cement concrete (PCC) for RCC columns


beams, lintels and all kind of RCC works with
cement,sand and crushed aggregate in 1:2:4
ratio including mixing, laying, curing, and finishing in perfect line and level all complete.
Unskilled
Skilled
cement
sand
Agg.

m/days
m/days
bags
cu.m.
cu.m.

2.50
1.00
6.00
0.445
0.85

485.00
660.00
795.00
960.00
1760.00

0.10
0.05
0.007
0.25

485.00
660.00
50000.00
85.00

4.2 Centering and shuttering with approved wooden planks and post for all kinds of RCC works
including necessary propping,scaffolding,staging all complete in perfect line and level.
unskilled
skilled
timber planks/ board
nails

nos
nos
cu.m.
kg

1 sq.m.
4.3 Straighting,cleaning,cutting and bending of
steel reinforcement bar of different for RCc
works including fixing in position all complete
Unskilled
Skilled
steel
binding wire

m/days
m/days
kg
kg

0.008
0.012
1.030
0.010

485.00
660.00
70.00
93.00
1 kg

5 First class brick work in 1:4 cement sand

mortar with approved quality chimney made


bricks inperfect line and level including wetting
the bricks, pacting the joints and curing all
complete.
Unskilled
Skilled
Cement
Sand
Brick

m/days
m/days
bags
cu.m.
nos.

1.50
1.50
1.50
0.28
460.00

485.00
660.00
795.00
960.00
13.75

m/days
m/days
cu.m.
nos
nos

3
15.00
1.10
92.00
184.00

485.00
660.00
50000.00
50.00
1.00

Unskilled
Skilled
Cement
Sand

m/days
m/days
bags
cu.m.

0.5
0.1
0.078
0.014

485.00
660.00
795.00
960.00

8 12.5 mm thick cement plastering work in 1:4


cement sand mortar on ceiling of good finishing
including cleaning & wetting surface and curing
the all complete work. 1 sq.m.
Unskilled
Skilled
Cement
Sand

m/days
m/days
bags
cu.m.

0.50
0.10
0.09
0.01

485.00
660.00
795.00
960.00

Unskilled m/days
cu.m.

0.50
1.00

485.00
150.00

9.2 20 mm thick cement plastering work in 1:4 cement sand mortar of good finishing including
cleaning and wetting one surface and curing
the work all complete.
Unskilled m/days
Skilled m/days
Cement bags

0.10
0.10
0.11

485.00
660.00
795.00

6 Supplying and fixing sal wood


chaukat frame works for doors and windows
the sal wood matured free from wraps, knots
holes and other defect all complete 1 cu.m.
unskilled
Skilled
Salwood
holdfast
screw

7 12.5 mm thick cement plastering work in 1:6


cement sand mortar on wall of good finishing
including cleaning & wetting surface and curing
the all complete work. 1 sq.m.

9 Flooring works:9.1 Earth Filling work for flooring with proper


compaction /1 cu.m.
Soil for filling /2 km transportation

Sand cu.m.

0.02

960.00

10 Sal Wood Shutter


Labours
Labours
Salwood
100 mm kabja
150 mm chheskini
300 mm chheskini
250 mm locking set
handle
Screw

m/d
m/d
cu.m.
nos
nos
nos
nos
nos
L.S.

Unskilled
skilled
nos

0.47
2
0.04
3
0.5
0.5
0.1125229
0.5
20

11 2 Coat Enamel paint


Labours
Labours
Wood primer
Enamel paint

m/d
m/d
liter
liter

Unskilled
skilled

0.09
0.09
0.1
0.23

12 3 MM Thick cement punning (1;1) 1 sq.m


Unskilled
skilled
Sand
Cement

Punning (1;1)
m/d
0.1
m/d
0.1
cu.m
0.0023
bag
0.0642

485.00
660.00
960.00
795.00

13 2 coat White wash


Unskilled
skilled
White cement
gluw

m/d
m/d
kg
m/d

485.00
660.00
42
142

14 Works Description

0.011
0.015
0.22
0.0088

:- 1 coat snowcem paint for wall

Norms code

:- 13 (4)ka

Unit

:- 1sqm.

Description
Unskilled
Skilled

Unit
no.
no.

Qtty.
0.02
0.02

Rate
485.00
660.00

Materials
Snowcem Paint

16

kg

Works Description

:- Stone masonary work in 1:4 cm

Norms code

:-

Unit

:- 1 cum.

0.30

55.00
Total
Total per sqm.

6 (1)ka 2

Description
Unskilled
Skilled
Materials

Unit
no.
no.

Qtty.
2.00
1.50

Rate
485.00
660.00

Stone
Sand
Cement

cum.
cum.
Bag

1.10
0.47
2

1430.00
960.00
795.00

3.00
15.00

Rate
485.00
660.00

1.050

50000.00

Total

17 Works Description

:- Sal wood beam, post, dalin etc.

Norms code

:- 10 (17)

Unit

:- 1 cum.

Description

Unit
no.
no.

Unskilled
Skilled

Qtty.

Materials
Sal wood
Nut bolt

cum.
LS
Total

18 Works Description

:- Wooden Sheet for Class Room

Norms code

:-

Unit

:- 10 sqm.

8 (2) ka

Description

Unit
no.
no.

Unskilled
Skilled

Qtty.
0.10
0.10

Rate
485.00
660.00

0.007
0.05

50000.00
85.00

Materials
wood
nails

cum.
kg.
Total
Total per sqm.

19 Stone Masonary in 1:6


Labours-

Skilled
Unskilled
MaterialsCement
Sand(Coarse)
Stone

20

1.5
3
2
0.47
1.1

md. @ Rs.
md. @ Rs.
bag.@ Rs.
m3. @ Rs.
m3. @ Rs.

660.00
485.00
795.00
960.00
1430.00
Total =

24 gauge CGI sheet roofing works - per sq.m.


Particulars
Lab. Skilled
Lab. Unskilled
CGI sheet (Medium), (8800/180*10.75)

J-Hooks/Nut-bolts 8 mm
Bitumin washer

Quantity

Unit

0.11
0.125

Md
Md
m2
Nos.
Nos.

1.20
3.00
3.00
Total:Contractor Over Head 15%
Sub-total:Rate per sq.m. Rs.

for contract
Rate
600.00
400.00
525.56
38.00
3.33

GI Plain sheet Coloured ridge roofing works - per 1 Rm.


Particulars

Quantity

Unit

for contract

Particulars
Lab. Skilled
Lab. Unskilled
Nut-bolt

Dry stone laying (soling) in sand

Stone soling in sand

Unit

0.20
Md
0.30
Md
1.20
Rm
0.10
LS
Total:Contractor Over Head 15%
Sub-total
Rate per Rm. Rs.

28 gauge CGI sheet (6592/72*3.28)

Item No.
3.1
Norms - 6(5) page 27

Quantity

per
1

Rate
600.00
400.00
300.30
100.00

unskilled
m.d.
stone
cu.m
bond st.
"
Sub-Total
cu.m. Contract Rate(1.15)
Contract U.Rate
per

485.00
485.00

970.00
1573.00
681.60
3224.60

1940.00
660.00
3100.5
451.20
1496.00
7647.20

1212.50
660.00
4770.00
427.20
1496.00
8565.68

48.50
33.00
330.00
21.25
432.75
432.75

3.88
7.92
72.10
0.93
84.83

Unskilled
Skilled
Cement
Sand
Agg.
Stone
nails
Brick
Wood primer
Enamel paint
White cement
gluw
soil
steel
binding wire

m/days
485
m/days
660
bags
795
cu.m.
960
cu.m.
1760
cu.m.
1430
kg
85
nos.
13.75
liter
290
liter
520
kg
42
liter
142
cu.m.
150
kg
70.00
kg
93.00
Snowcem Paint kg
55.00
timber planks/ board cu.m.
50000.00

727.50
990.00
1,192.50
268.80
6,325.00
9,504

1455.00
9900.00
55000.00
4600.00
184.00
71139.00

242.50
66.00
62.01
13.44
383.95

242.50
66.00
71.55
13.44
393.44

242.50
150.00
392.50

48.50
66.00
90.63

23.04
228.17

485.00
660.00
50,000.00
30.00
40.00
60.00
124.00
80.00
1.00
total

227.95
1,320.00
2,000.00
90.00
20.00
30.00
13.95
40.00
20.00
3761.85

485.00
660.00
290
520
Total

43.65
59.4
29
121
253.05

Total

48.50
66.00
2.21
51.04
167.75

Total

5.335
9.9
9.24
1.2496
25.73

Amount
8.25
11.22
16.50
37.41
37.41

Amount
970.00
990.00

Remarks

14.d

Remarks

1,573.00
451.20
1,590.00
5,574.20

Amount
1455.00
9900.00

8.a

Remarks

52500.00
63855.00

Amount
48.50
66.00
328.75
4.25
447.50
447.50

13.h

Remarks

10.d

990.00
1455.00
1590.00
451.20
1573.00
6059.20

for contract
Amount
66.00
50.00
630.67
114.00
9.99
870.66
130.60
1001.26
1001.26
for contract

for UC
Rate
Amount
600.00
66.00
400.00
50.00
593.88
42.94
3.76

712.66
128.81
11.29
968.76

968.76
for UC

Amount
120.00
120.00
360.36
10.00
610.36
91.55
701.91
701.91

Rate
600.00
400.00
339.34
113.00

1.50
1.10
0.20

485.00
1430.00
960.00

cu.m.
cft

Amount
120.00
120.00
407.21
11.30
658.51

658.51

727.50
1573.00
192.00
2492.50
2866.38
2866.38
81.17