Department of Education
District Education Office,Palpa
DETAILS OF ESTIMATE
Project :-Construction of School Building(RCC Frame-4 Rooms on Ground Floor)
Site :-Sen Ucha ma Bi
School's Name :-Sen Ucha Ma Bi Tansen,Palpa
Fy :-2067/68
S.N.
Description
Unit No Length(L) Breadth(B) Height(H) Quantity Remarks
E/W in Excavation
E/W in trenches,foundation etc in hard soil including timbering and shoring,pumping out water from trenches if
necessary,dressing of sides,lift up to 1.5mtr,stacking of excavated material at least 3 mtr,clear from edge of
excavation,backfilling stacked soil in 150mm layers by ramming & disposing all surplus excavated materials within
the site all complete
Footing F1
4.0
2.00
2.00
1.75
28.00
Footing F2
2.0
2.30
2.30
1.75
18.52
Footing F3
8.0
2.65
2.65
1.75
98.32
Footing F4
2.0
3.20
3.20
1.75
35.84
Footing F5
2.0
3.65
3.65
1.75
46.63
Wall
Grid 1
1.0
16.60
0.23
0.72
2.75
Grid 2
1.0
12.85
0.23
0.73
2.16
m3
Grid 3
1.0
17.30
0.23
0.73
2.90
Grid A & F
2.0
5.35
0.23
0.73
1.80
Grid B & E
2.0
3.70
0.23
0.73
1.24
Grid C & D
2.0
4.33
0.23
0.73
1.45
Step
1.0
4.80
0.90
0.15
0.65
Ramp including Platform
1.0
6.50
1.30
0.15
1.27
1.0
3.25
1.30
0.15
0.63
Plinth Protection
1.0
73.30
0.50
0.15
5.50
Sub-Total
247.65
Stone Soling Work
Stone Soling in foundation & floor laid in line & level including filling in the joints with sand all complete
Footing F1
4.0
2.00
2.00
0.15
2.40
Footing F2
2.0
2.30
2.30
0.15
1.59
Footing F3
8.0
2.65
2.65
0.15
8.43
Footing F4
2.0
3.20
3.20
0.15
3.07
Footing F5
2.0
3.65
3.65
0.15
4.00
Wall
Grid 1
1.0
16.60
0.23
0.15
0.57
Grid 2
1.0
12.85
0.23
0.15
0.44
m3
Grid 3
1.0
17.30
0.23
0.15
0.60
Grid A & F
2.0
5.35
0.23
0.15
0.37
Grid B & E
2.0
3.70
0.23
0.15
0.26
Grid C & D
2.0
4.33
0.23
0.15
0.30
Step
1.0
4.80
0.90
0.15
0.65
Ramp including Platform
1.0
6.50
1.30
0.15
1.27
1.0
3.25
1.30
0.15
0.63
Plinth Protection
1.0
73.30
0.50
0.15
5.50
Sub-Total
30.07
Prepared By:
Checked By:
Approved By:
4*4/2
4*4/2
2*4/2
2*4/2
2
2
2.3
2.65
3.2
3.65
2
2.3
2.65
3.2
3.65
0.25
0.25
0.25
0.25
0.4
4.00
2.65
14.05
5.12
10.66
4
5.29
7.02
10.24
13.32
0.4
27.2
4.2
27.2
4.2
27.2
3.94
3.08
2.77
1.2
31.2
0.16
0.16
0.16
0.16
0.16
0.4
0.23
0.23
0.3
0.3
0.23
0.23
1.2
1.8
0.3
11.6
Total
0.4
0.4
0.4
0.4
2.77
0.05
0.1
0.15
0.2
0.23
5.38
0.3
0.3
0.5
0.5
0.3
0.3
0.17
0.17
0.15
0.13
0.13
0.17
1.35
0.66
0.98
15.49
11.26
3.48
24.48
7.56
5.63
1.09
2.51
1.70
0.49
94.10
207.53
0.67
1.09
0.72
1.01
3.74
1.4
1.7
1.8
2.1
4.5
Checked By:
0.15
0.2
0.25
0.3
0.15
Approved By:
Total of Deduction
Sub-Total
7.23
200.31
Formwork
Formwork centering & shuttering with approved material such as shuttering plywood,local wood or plain sheet
etc.for all RCC works of any shape,size & at any level with necessary
propping,scafolding,staging,supporting,cutting holes for utilization works etc.including providing final sureface and
oil & removal of forms all complete
Footing F1
4*4
1.4
0.2
4.48
Footing F2
4*4
1.7
0.2
5.44
Footing F3
2*4
1.8
0.2
2.88
Footing F4
2*4
2.1
0.2
3.36
4
1.2
10.15
48.72
Column
8
1.2
7.3
70.08
Lower & upper tie beam
1*2
139.8
0.35
97.86
2
Main beam m
1*2
139.8
0.25
69.90
Top
1
27.6
0.25
6.90
Slab 1st floor
1*2
10.2
14.2
289.68
Top
1
6.75
0.15
1.01
Stairecase lower
2*2
3.08
1.2
14.78
Landing
1*2
2.77
1.8
9.97
Deduction stair hall
-2
4.5
2.77
-24.93
Sub-Total
600.14
Reinforcement work
Fixing torsteel reinforcement grade 1 conforming to I.S.1786-1985 in RCC work including
cleaning,cutting,bending,placing in position and binding with no 16 swg annealed binding wire all complete
Bottom mesh of column
Footing F1-12mm dia. bar
4*28
2
224.00
Footing F2-12mm dai. bar
4*32
2.3
294.40
Rm 2*36
2.65
190.80
2*42
3.2
268.80
2*50
3.65
365.00
Sub-Total
1343.00 Rm
1195.27 kgs
C1-20mm dia.bar
4*4
7.65
122.40
25mm dai.bar
4*4
8.15
130.40
8*8
8.15
521.60
C3-25mm dai.bar
2*10
8.15
163.00
C4-25mm dai.bar
2*12
8.15
195.60
Rm
C2-25mm dai.bar
Sub-Total
i-122.40
1010.60
4170.48 kgs
Beam
Lower tie beam & Plinth beam
Grid A,B,C&D-16mm dai
Grid 1,3,5,6,8&10-16mm dai
Main beam
1st floor beam
Grid 1-1
Prepared By:
Rm
2*4*6
33.2
2*6*6
12.4
Sub-Total
2486.40 Rm @ 1.58kg/Rm
1593.60
892.80
2486.40
3928.51 kgs
Rm
Checked By:
Approved By:
Rm
Top Bar-25mm dai.through out
3
38.2
114.60 Rm @ 3.83kg/Rm(D)
114.60 Rm
435.48 kgs
Rm
2*3
2*3
2*2
2.9
4.2
3.35
17.40
25.20
13.40
56.00 Rm
137.20 kgs
105.60
258.72 kgs
56 Rm @ 2.45kg/Rm(E)
Bottom bar-20mm dai.throught
3
35.2
105.60Rm @ 2.45kg/Rm(F)
Bottom extra bar
Rm
At junction of grid C & D-16mm dai
2
6.46
12.92 Rm @ 1.57kg/Rm(G)
Grid 2-2
Same As Grid 1-1(I)
Grid 3-3
Same As Grid 1-1(J)
Rm
Grid A-A
Top bar-20mm dai through out
3
13
39 Rm @ 2.45kg/Rm(K)
Top extra bar
At junction of grid 1&3-20mm dai
2*3
2.5
Rm
At junction of grid 2-20mm dai
3*2
3.4
Bottom bar-20mm dai.throught
3
13
Rm
12
12
15
15
Prepared By:
Rm
4*4
4*2
11.6
12
20*2
30*4
22*2
Rm
10*2
10*2
13*2
5.07
1.2
3.16
0.88
2.45
2.12
896
1060
1184
108
1.8
1.12
1.21
1.21
Checked By:
15.00
20.40
39.00
74.40 Rm
182.28 kgs
1389.15 kgs
180.00
180.00
360.00 Rm
565.20 kgs
Rm
kgs
kgs
kgs
39.00 Rm
95.55 kgs
74.4 Rm @ 2.45kg/Rm(L)
5 Nos @ (95.55+182.28)kg(M)
Grid 2'-2'
12.92
20.28
851.68
851.68
202.80
144.00
139.04
17.60
49.00
55.12
92.8
96
145.70 kgs(O)
235.20 kgs(P)
0.89
0.39
0.39
0.89
0.89
0.89
180.49
56.16
54.23
15.66
43.61
49.06
kgs(Q)
kgs
kgs(S)
kgs(T)
kgs(U)
kgs(V)
1612.80
1187.20
1432.64
130.68
4363.32 Rm
Approved By:
4363.32 Rm @ 0.39kg/Rm(W)
Slab
Long Span-8mm dai bar
Extra top bar
Hook bar
main bar for passage
Main bar for Short Span
Main bar for Passage
6
93
250
560
29
29
Rm
32*2
32*2
10
9
73
31.2
11.6
2
1.55
4.55
5.25
5.93
5.25
4.8
1.875
9*4
9*2
Rm 10*2
8*2
4*2
5.57
14.2
10.2
10.2
4.8
1701.69 kgs
2901.60
2900.00
1120.00
44.95
131.95
336.00
379.52
52.50
43.20
136.88
200.52
255.60
204.00
163.20
38.40
8908.32 Rm
3474.24 kgs
20037.54 kgs
8908.32Rm @ 0.39kg/Rm(X)
Total
Brick work in foundation
First Class Brickwork in sub-structure in(1:4) cement sand mortar with approved quality bricks in perfect line &
level with necessary scaffolding including wetting the bricks,properly packing the joints & curing the works with all
complete
Grid B & D
Grid A, B, C, D, E & F
Step 1st
Ramp wall
Platform wall
Appron
2nd Step
3rd Step
2.0
6.0
1.0
1.0
m3
1.0
1.0
1.0
1.0
Sub-Total
27.2
9.20
3.30
3.65
5.24
40.80
3.30
3.30
0.23
0.23
0.60
0.23
0.23
0.23
0.60
0.30
0.65
0.65
0.20
0.58
0.58
0.13
0.15
0.15
8.13
8.25
0.40
0.49
0.70
1.22
0.30
0.15
19.63
Brickwork in Superstructure
Frist class Brickwork in super structure in (1:4) cement sand mortar with approved quality bricks in perfect line &
level with necessary scaffolding including wetting the bricks,properly packing the joints & curing the works with all
complete
Ground floor
Long wall
2.0
27.20
0.23
2.45
30.65
Short wall
6.0
7.65
0.23
2.45
25.86
m3
Deduction for openings
Door D
-9.0
1.05
0.23
2.10
-4.56
Window W
-14.0
1.50
0.23
1.35
-6.52
Sub-Total
45.43
Sal Wood for D/W frame
Prepared By:
Checked By:
Approved By:
Sal wood for chaukats with fixing size of door & windowcwith necessary fittings all complete
Door D
9
5.25
0.075
0.1
m3
Window W
14
8.4
0.075
0.1
Sub-Total
0.35
0.88
1.24
Panneled shutter
Supplying & fixing of flush door shutter in counter in 38x75mm salwood frame with 4mm thck commercial
plywood on both side & necessary morticelock,hings,towerbolt,handles etc.as per drawing,specification and
10 instruction
Door D
9.00
0.93
2.05
17.16
m2
Window W
14*3
0.43
1.23
22.21
Sub-Total
39.37
Flooring work
a.Earth filling work with compaction
Earthwork in filling under floors with good quality earth in 150 mm thck layers with sprinking water,ramming &
consolidating with all complete
Rooms
4.0
7.65
6.05
0.45
83.31
Stair Hall
1.0
7.23
2.77
0.45
9.01
3
Passage m
1.0
13.07
1.54
0.45
9.06
Ramp
1.0
8.00
1.20
0.23
2.16
Platform
1.0
3.10
1.20
0.60
2.23
Sub-Total
105.77
b.Stone solling in floor laid in line & level including filling in the joints with sand all complete
Rooms
4.0
7.65
6.05
0.15
27.77
Stair Hall
1.0
7.23
2.77
0.15
3.00
3
Passage m
1.0
13.07
1.54
0.15
3.02
Ramp
1.0
8.00
1.20
0.15
1.44
Platform
1.0
3.10
1.20
0.15
0.56
Sub-Total
35.79
c.75mm thck PCC Work
Plain cement concrete 1:2:4 blinding concrete under wall,floor & column foundation etc.including protection of
sides,laying compacting,curing with all complete
Rooms
4.0
7.65
6.05
0.08
14.81
Stair Hall
1.0
7.23
2.77
0.08
1.60
11
3
Passage m
1.0
13.07
1.54
0.08
1.61
Ramp
1.0
8.0
1.2
0.08
0.77
Platform
1.0
3.1
1.2
0.08
0.30
Sub-Total
19.09
d.Plaster work
12.5mm thck cement sand plaster 1:4 on floor in perfect line & level with top quality finish including necessary
wetting the sureface & curing the plastered surefaces with all complete
Rooms
4.0
7.65
6.05
185.13
Stair Hall
1.0
7.23
2.77
20.03
2
Passage m
1.0
13.07
1.54
20.13
Ramp
1.0
8.00
1.20
9.60
Platform
1.0
3.10
1.20
3.72
Sub-Total
238.60
e.Cement Punning Work
3mm thck neat cement sand punning work over cement sand plaster in line & level with throwelling the top sureface
to give a smooth finish on floor,wall & skirting etc in perfect line & level including cleaning,curing with all
complete
Prepared By:
Checked By:
Approved By:
Rooms
4.0
Stair Hall
1.0
2
Passage m
1.0
Ramp
1.0
Platform
1.0
Sub-Total
7.65
7.23
13.07
8.00
3.10
6.05
2.77
1.54
1.20
1.20
185.13
20.03
20.13
9.60
3.72
238.60
Plaster work
12.5mm thck cement sand plaster 1:4 on walls,ceilling etc.in perfect line & level with top quality finish including
necessary scaffolding,,raking the joint,wetting the sureface & curing the plastered surefaces with all complete
Inside wall in rooms
Front and back side wall
4*2
6.05
2.85
137.94
Left and right side wall
4*2
7.65
2.85
174.42
Top Floor wall
1
16.5
2.85
47.03
0.00
Outside wall in room-1st & 2nd floor
12 Front and back side wall
2
29.6
9.6
568.32
Left and right side wall
2
8.45
9.6
162.24
m2
Top Floor wall
1
19.3
2.85
55.01
Step
18*2
1.2
0.3
12.96
Step
18*2
1.2
0.15
6.48
Deduction for openings
Door D
-9.0
1.05
2.1
-19.85
Window W
-14.0
1.5
1.35
-28.35
Sub-Total
1116.20
Snowcem paint
Weathered coat(Apex)Paint,2 coat over one coat primer of approved colour and shade as per specification and
13 instruction all complete
Equivalent to plastering works
m2
1116.20
Enamel Paint
Two coat ready made enamel paint of approved colour & shade over one coat of primer as per specification and
instruction
Door D
9.0
0.9
2.1
17.01
14
2
Window W m
14.0
1.5
1.35
28.35
Ventilation
11.0
1.2
0.6
7.92
Total
53.28
Net-Total(53.28*2.25)
119.88
Prepared By:
Checked By:
Approved By:
Prepared By:
Checked By:
Approved By:
Government of Nepal
Department of Education
District Education Office,Palpa
Abstract of Cost
Project :-Construction of School Building(RCC Frame-4 Rooms on Ground Floor)
Site :-Sen Ucha ma bi
School's Name :-Sen Ucha ma Bi,Tansen,Palpa
Fy :-2067/68
S.N.
Description of Work
Quantity
Unit
Rate(NRs)
Amount
Remarks
1
E/W Excavation
247.65
m3
185.40
45914.24
Stone Soling
30.07
m3
2295.00
69000.54
20.04
5883.40
117925.28
200.31
m3
7524.00
1507100.03
5
6
600.14
20.04
19.63
m
MT
267.93
80180.50
160795.11
1606817.22
Formwork
Reinforcement work
Brickwork in Foundation(1:4)
m3
6901.75
135498.92
Brickwork in Superstructure(1:4)
45.43
m3
6901.75
313575.49
1.24
m3
75185.40
92957.35
39.37
m2
4302.08
169382.78
105.77
m3
221.25
23401.66
35.79
m3
2295.00
82139.74
19.09
m3
7524.00
143621.06
238.60
m2
133.99
31970.67
238.60
m2
117.62
28064.71
1116.20
m2
133.39
148889.25
13 Snowcem Paint
1116.20
m2
53.00
59158.34
m2
124.96
Total Cost
Supervision & Monitoring Cost @ 2.5% of Total Cost(Contingencies)
Grand Total
14980.20
4751192.59
118779.81
4869972.41
10 Panelled Shutter
Flooring Work a)Earth filling work
b)Stone Filling in Floor
14 Enamel Paint
Prepared By:
119.88
Checked By:
Approved By:
Prepared By:
Checked By:
Approved By:
per
Unskilled
Equipment
3%of labour
Sub-Total
m.d.
1.00
Unskilled
m.d.
soil
cu.m
Equipment 3%of labour
Sub-Total
0.50
1.00
Unskilled
m.d.
Stone
cu.m
Sand
cu.m
Equipment 3%of labour
Sub-Total
2.00
cu.m.
skilled
unskilled
Brick
Cement
Sand
Add.unkill
Scaffolding
Sub-Total
skilled
unskilled
Brick
Cement
Sand
1.10
0.71
m.d.
1.50
m.d.
2.20
nos.
560.00
bags
2.00
cu.m
0.28
m.d.
0.20
3% of add. Unskilled
m.d.
m.d.
nos.
bags
cu.m
1.50
2.20
560.00
1.40
0.30
a) 1:6
Item No.
per
5
1
cu.m.
Norms - 5(1b)3 page 23 & 5(2)a page 24
Brick work in c.m. - 1:6
Add.unkill
Scaffolding
Sub-Total
m.d.
0.20
3% of add. Unskilled
skilled
unskilled
cement
gravel_1
sand
Sub-Total
m.d.
m.d.
bags
cu.m.
cu.m.
1.00
4.00
4.40
0.89
0.47
skilled
unskilled
cement
gravel_1
sand
Sub-Total
m.d.
m.d.
Bags
cu.m.
cu.m.
1.00
4.00
6.40
0.85
0.4450
skilled
unskilled
cement
gravel_1
sand
Sub-Total
m.d.
m.d.
bag
cu.m.
cu.m.
0.80
7.00
8.00
0.86
0.425
skilled
unskilled
iron rod
bind.wire
Sub-Total
m.d.
m.d.
m.t.
kg
0.01
0.01
1.05
0.01
Norms-7( 5) page 33
Iron rod( TOR steel) for RCC
Making wooden form work including supply
and selection of materials fixing, nailing
according to drawings, placing separators, dismantling forms and hauling
upto 30 m distance
Item No.
per
10
10
sq.m.
Norms-8(2)a page 37
Form work
12.5 mm thick cement sand plastering
works
a) Cement sand ratio - 1:4
Item No.
per
11
100
sq.m.
Norms-12(1c) page 67
1/2" cement plaster in c.m. - 1:4
12.5 mm thick cement sand plastering
works
a) Cement sand ratio - 1:6
Item No.
per
12
100
sq.m.
Norms-12(1d) page 67
1/2" cement plaster in c.m. - 1:6
Item No.
13
10
Norms-11(20) page 66
3mm cement punning
per
skilled
unskilled
wood
killa
m.d.
m.d.
cu.m.
kg
0.17
0.26
0.007
0.25
skilled
unskilled
cement
sand
Sub-Total
m.d.
m.d.
bags
cu.m
0.120
0.160
0.108
0.015
skilled
unskilled
cement
sand
Sub-Total
m.d.
m.d.
m.t.
cu.m
0.120
0.160
0.076
0.016
skilled
unskilled
cement
Sub-Total
m.d.
m.d.
kg
0.10
0.10
5.32
skilled
unskilled
cement
m.d.
m.d.
bags
0.13
0.20
0.34
Sub-Total
sq.m.
per
0.05
0.023
skilled
unskilled
cement
gravel_1
sand
Sub-Total
m.d.
m.d.
bags
cu.m.
cu.m.
0.13
0.30
0.52
0.07
0.034
skilled
unskilled
Salwood
holdfast
screw
Sub-Total
m.d.
m.d.
cu.m.
nos
nos
3.40
3.40
1.10
92.00
184.000
skilled
unskilled
Salwood
100 mm kabja
150 mm chheskini
300 mm chheskini
250 mm locking set
handle
screw
Sub-Total
m.d.
m.d.
cu.m.
nos
nos
nos
nos
nos
ls
0.47
2
0.04
3
0.5
0.5
0.1125
0.5
20
Sqm
cu.m.
cu.m.
Sqm
Item No.
15
10
Norms-11(1)b page 60
PCC (1:2:4) - river gravel
gravel_1
sand
Sub-Total
per
1
Cum
Wood work(Chaukhat)
Sal Wood Shutter of 40mm
Item No.
17
per
1
Sqm
KS
350.00
350.00
10.50
360.50
350.00
150.00
175.00
150.00
5.25
330.25
350.00
2000.00
1589.18
700.00
2200.00
1128.31
21.00
4049.31
550.00
350.00
7.00
550.00
1589.18
350.00
825.00
770.00
3920.00
1100.00
444.97
70.00
23.10
7153.07
550.00
350.00
7.00
550.00
1589.18
825.00
770.00
3920.00
770.00
476.75
dd. Unskilled
S.N.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Items Name
Skilled Mason
Unskilled Mason
Brick
Cement
Sand
Aggregates
MS Rod
Binding Wire
Killa
wood
Stone
holdfast
screw
soil
Units
md
md
Nos
Bags
Cuft
Cuft
kg
kg
Kg
cu.m.
cu.m.
nos
nos
cum
Rate
550.00
350.00
7.00
550.00
45.00
65.00
90.00
110.00
120.00
50000
2000
50
1
150
350.00
70.00
2.10
6833.85
550.00
350.00
550.00
2295.48
1589.18
550.00
1400.00
2420.00
2042.97
746.91
7159.88
550.00
350.00
550.00
2295.48
1589.18
550.00
1400.00
3520.00
1951.15
707.18
8128.33
550.00
350.00
550.00
2295.48
706.00
440.00
2450.00
4400.00
1974.11
300.05
9564.16
550.00
350.00
90.00
110.00
6.60
4.20
94.50
1.10
106.40
dd. Unskilled
550.00
350.00
50000.00
120.00
94.60
89.95
350.00
30.00
564.55
550.00
350.00
550.00
1589.18
66.00
56.00
59.18
23.20
204.38
550.00
350.00
550.00
1589.18
66.00
56.00
42.02
24.95
188.97
550.00
350.00
11.00
55.00
35.00
58.52
148.52
550.00
350.00
550.00
68.75
70.00
187.00
2295.48
1589.18
105.59
36.55
399.14
550.00
350.00
550.00
2295.48
1589.18
68.75
105.00
286.00
156.09
54.03
601.12
550.00
350.00
50000.00
50.00
1.00
1870.00
1190.00
55000.00
4600.00
184.00
60974.00
550.00
350.00
50000.00
50.00
50.00
50.00
50.00
200.00
2.00
258.50
700.00
2000.00
150.00
25.00
25.00
5.63
100.00
40.00
3045.63
Remarks
4
4.1
1.00
485.00
nos
cu.m.
cu.m.
2.00
1.10
0.71
485.00
1430.00
960.00
nos
m/days
m/days
bags
cu.m.
cu.m.
4
1
3.9
0.47
0.85
485.00
660.00
795.00
960.00
1760.00
m/days
m/days
bags
cu.m.
cu.m.
2.50
1.00
6.00
0.445
0.85
485.00
660.00
795.00
960.00
1760.00
0.10
0.05
0.007
0.25
485.00
660.00
50000.00
85.00
4.2 Centering and shuttering with approved wooden planks and post for all kinds of RCC works
including necessary propping,scaffolding,staging all complete in perfect line and level.
unskilled
skilled
timber planks/ board
nails
nos
nos
cu.m.
kg
1 sq.m.
4.3 Straighting,cleaning,cutting and bending of
steel reinforcement bar of different for RCc
works including fixing in position all complete
Unskilled
Skilled
steel
binding wire
m/days
m/days
kg
kg
0.008
0.012
1.030
0.010
485.00
660.00
70.00
93.00
1 kg
m/days
m/days
bags
cu.m.
nos.
1.50
1.50
1.50
0.28
460.00
485.00
660.00
795.00
960.00
13.75
m/days
m/days
cu.m.
nos
nos
3
15.00
1.10
92.00
184.00
485.00
660.00
50000.00
50.00
1.00
Unskilled
Skilled
Cement
Sand
m/days
m/days
bags
cu.m.
0.5
0.1
0.078
0.014
485.00
660.00
795.00
960.00
m/days
m/days
bags
cu.m.
0.50
0.10
0.09
0.01
485.00
660.00
795.00
960.00
Unskilled m/days
cu.m.
0.50
1.00
485.00
150.00
9.2 20 mm thick cement plastering work in 1:4 cement sand mortar of good finishing including
cleaning and wetting one surface and curing
the work all complete.
Unskilled m/days
Skilled m/days
Cement bags
0.10
0.10
0.11
485.00
660.00
795.00
Sand cu.m.
0.02
960.00
m/d
m/d
cu.m.
nos
nos
nos
nos
nos
L.S.
Unskilled
skilled
nos
0.47
2
0.04
3
0.5
0.5
0.1125229
0.5
20
m/d
m/d
liter
liter
Unskilled
skilled
0.09
0.09
0.1
0.23
Punning (1;1)
m/d
0.1
m/d
0.1
cu.m
0.0023
bag
0.0642
485.00
660.00
960.00
795.00
m/d
m/d
kg
m/d
485.00
660.00
42
142
14 Works Description
0.011
0.015
0.22
0.0088
Norms code
:- 13 (4)ka
Unit
:- 1sqm.
Description
Unskilled
Skilled
Unit
no.
no.
Qtty.
0.02
0.02
Rate
485.00
660.00
Materials
Snowcem Paint
16
kg
Works Description
Norms code
:-
Unit
:- 1 cum.
0.30
55.00
Total
Total per sqm.
6 (1)ka 2
Description
Unskilled
Skilled
Materials
Unit
no.
no.
Qtty.
2.00
1.50
Rate
485.00
660.00
Stone
Sand
Cement
cum.
cum.
Bag
1.10
0.47
2
1430.00
960.00
795.00
3.00
15.00
Rate
485.00
660.00
1.050
50000.00
Total
17 Works Description
Norms code
:- 10 (17)
Unit
:- 1 cum.
Description
Unit
no.
no.
Unskilled
Skilled
Qtty.
Materials
Sal wood
Nut bolt
cum.
LS
Total
18 Works Description
Norms code
:-
Unit
:- 10 sqm.
8 (2) ka
Description
Unit
no.
no.
Unskilled
Skilled
Qtty.
0.10
0.10
Rate
485.00
660.00
0.007
0.05
50000.00
85.00
Materials
wood
nails
cum.
kg.
Total
Total per sqm.
Skilled
Unskilled
MaterialsCement
Sand(Coarse)
Stone
20
1.5
3
2
0.47
1.1
md. @ Rs.
md. @ Rs.
bag.@ Rs.
m3. @ Rs.
m3. @ Rs.
660.00
485.00
795.00
960.00
1430.00
Total =
J-Hooks/Nut-bolts 8 mm
Bitumin washer
Quantity
Unit
0.11
0.125
Md
Md
m2
Nos.
Nos.
1.20
3.00
3.00
Total:Contractor Over Head 15%
Sub-total:Rate per sq.m. Rs.
for contract
Rate
600.00
400.00
525.56
38.00
3.33
Quantity
Unit
for contract
Particulars
Lab. Skilled
Lab. Unskilled
Nut-bolt
Unit
0.20
Md
0.30
Md
1.20
Rm
0.10
LS
Total:Contractor Over Head 15%
Sub-total
Rate per Rm. Rs.
Item No.
3.1
Norms - 6(5) page 27
Quantity
per
1
Rate
600.00
400.00
300.30
100.00
unskilled
m.d.
stone
cu.m
bond st.
"
Sub-Total
cu.m. Contract Rate(1.15)
Contract U.Rate
per
485.00
485.00
970.00
1573.00
681.60
3224.60
1940.00
660.00
3100.5
451.20
1496.00
7647.20
1212.50
660.00
4770.00
427.20
1496.00
8565.68
48.50
33.00
330.00
21.25
432.75
432.75
3.88
7.92
72.10
0.93
84.83
Unskilled
Skilled
Cement
Sand
Agg.
Stone
nails
Brick
Wood primer
Enamel paint
White cement
gluw
soil
steel
binding wire
m/days
485
m/days
660
bags
795
cu.m.
960
cu.m.
1760
cu.m.
1430
kg
85
nos.
13.75
liter
290
liter
520
kg
42
liter
142
cu.m.
150
kg
70.00
kg
93.00
Snowcem Paint kg
55.00
timber planks/ board cu.m.
50000.00
727.50
990.00
1,192.50
268.80
6,325.00
9,504
1455.00
9900.00
55000.00
4600.00
184.00
71139.00
242.50
66.00
62.01
13.44
383.95
242.50
66.00
71.55
13.44
393.44
242.50
150.00
392.50
48.50
66.00
90.63
23.04
228.17
485.00
660.00
50,000.00
30.00
40.00
60.00
124.00
80.00
1.00
total
227.95
1,320.00
2,000.00
90.00
20.00
30.00
13.95
40.00
20.00
3761.85
485.00
660.00
290
520
Total
43.65
59.4
29
121
253.05
Total
48.50
66.00
2.21
51.04
167.75
Total
5.335
9.9
9.24
1.2496
25.73
Amount
8.25
11.22
16.50
37.41
37.41
Amount
970.00
990.00
Remarks
14.d
Remarks
1,573.00
451.20
1,590.00
5,574.20
Amount
1455.00
9900.00
8.a
Remarks
52500.00
63855.00
Amount
48.50
66.00
328.75
4.25
447.50
447.50
13.h
Remarks
10.d
990.00
1455.00
1590.00
451.20
1573.00
6059.20
for contract
Amount
66.00
50.00
630.67
114.00
9.99
870.66
130.60
1001.26
1001.26
for contract
for UC
Rate
Amount
600.00
66.00
400.00
50.00
593.88
42.94
3.76
712.66
128.81
11.29
968.76
968.76
for UC
Amount
120.00
120.00
360.36
10.00
610.36
91.55
701.91
701.91
Rate
600.00
400.00
339.34
113.00
1.50
1.10
0.20
485.00
1430.00
960.00
cu.m.
cft
Amount
120.00
120.00
407.21
11.30
658.51
658.51
727.50
1573.00
192.00
2492.50
2866.38
2866.38
81.17