Вы находитесь на странице: 1из 6

JDE:2709712/KAS.

ISOLATION VALVE AND R/C DRAIN LINE INSTALLATION AT STEAM DISTRIBUTION


PIPING OFF PLOT
Install Valve/Control Valve
Install Valve/Control Valve 2" All Class
Install Valve/Control Valve 16" Class 600
Install Valve/Control Valve 20" Class 600
Install Steam Pipe Line
Install Steam Pipe Line 2" All Thickness
Install Steam Pipe Line 18" 0.688
Install Steam Pipe Line 20" 0.75
Install Steam Pipe Line 24" 0.812
Install Elbow Steam Pipe Line
Install Elbow Steam Pipe Line 2" All Thickness
Install Flange Steam Pipe Line
Install Flange Steam Pipe Line 2" All Class
Install Flange Steam Pipe Line 16" Class 600
Install Flange Steam Pipe Line 20" Class 600
Install Reducer Steam Pipe Line
Install Reducer Steam Pipe Line 18" 0.688
Install Reducer Steam Pipe Line 24" 0.812
Install Weldolet/Sockolet/Threadolet Steam Pipe Line
Install Weldolet/Sockolet/Threadolet Steam Pipe Line 2" All Thickness
Install Weldolet/Sockolet/Threadolet Steam Pipe Line 18" 0.688
Install Weldolet/Sockolet/Threadolet Steam Pipe Line 20" 0.594
Install Weldolet/Sockolet/Threadolet Steam Pipe Line 24" 0.812
Install Steam Piping Insulation and Jacketing
Install Steam Piping Insulation and Jacketing 18"
Install Steam Piping Insulation and Jacketing 20"
Install Steam Piping Insulation and Jacketing 24"
PIPE SUPPORT & PILLING
Install Steel Pipe Pile
Install Steel Pipe Pile 12"
EARTHWORK & CIVIL
Earthworks
Dress-up Road & Well Pad
Concrete Works for Off Plot
Supply and Install Lean Concrete

T Spool Installation #151 - #200


PIPING OFF PLOT
Install Valve/Control Valve
Install Valve/Control Valve 2" All Class
Hydrostatic Test for holding time 12 hours
Hydrostatic Test for holding time 12 hours Hydrostatic Test for cummulative length up to
Install Steam Pipe Line

Install Steam Pipe Line 2" All Thickness


Install Elbow Steam Pipe Line
Install Elbow Steam Pipe Line 2" All Thickness
Install Flange Steam Pipe Line
Install Flange Steam Pipe Line 2" All Class
Install Weldolet/Sockolet/Threadolet Steam Pipe Line
Install Weldolet/Sockolet/Threadolet Steam Pipe Line 2" All Thickness
Install Steam Piping Insulation and Jacketing
Install Steam Piping Insulation and Jacketing 2"
Install Steam Piping Insulation and Jacketing 4"
Install Steam Piping Insulation and Jacketing 6"
Install Steam Piping Insulation and Jacketing 8"
Install Steam Piping Insulation and Jacketing 10"
Dismantle Steam Piping Insulation and Jacketing
Dismantle Steam Piping Insulation and Jacketing 4"
Dismantle Steam Piping Insulation and Jacketing 6"
Dismantle Steam Piping Insulation and Jacketing 8"
Dismantle Steam Piping Insulation and Jacketing 10"
Non Pressure tested Clossure Weld (Golden Weld)
Non Pressure tested Clossure Weld (Golden Weld) 2"
PIPE SUPPORT & PILLING
Supply and Install Pre-cast Concrete Pipe Pile
Supply and Install Pre-cast Concrete Pipe Pile 300 mm OD
Fabricate and Install Pipe Support
Fabricate and Install Pipe Support Type I 4"
SUPPORT & TESTING
Scaffolding Work
Supply and Install Steel Pipe/Tubular Tower Scaffolding 1000 Cu.Meter.Days
Additional
PIPING OFF PLOT
Install Blind Flange
Install Blind Flange 2" All Class
Install Cap/Plug (unit measurement is the number of installed Cap/Plug)
Install Cap/Plug 2"All Class
Miscellaneous Work
Install Short Pipe Line (total installed various diameter of pipe, the length < 12M per WR/Aut
EARTHWORK & CIVIL
Concrete Works for Off Plot
Supply and Pouring Concrete - K225
Concrete Formwork
Supply, Fabricate and Install Concrete Reinforcement Steel Bar
SUPPORT & TESTING
Additional NDT (Radiographic Test)
Conduct Additional NDE (Non Destructive Examination/Radiographic Test) dia < 2"

STEAM DISTRIBUTION LINE IN AREA 5,6,7

Each
Each
Each

Rp
Rp
Rp

85,640.00
75,190.00
94,000.00

74.00
1.00
4.00

Meter
Meter
Meter
Meter

Rp
Rp
Rp
Rp

107,700.00
387,700.00
1,292,300.00
258,470.00

120.00
12.00
24.00
36.00

Meter

Rp

644,590.00

100.00

Each
Each
Each

Rp
Rp
Rp

502,830.00
4,022,640.00
1,508,480.00

168.00
2.00
8.00

Each
Each

Rp
Rp

1,357,640.00
905,080.00

2.00
4.00

Each
Each
Each
Each

Rp
Rp
Rp
Rp

322,270.00
905,080.00
502,830.00
603,410.00

2.00
5.00
15.00
42.00

Meter
Meter
Meter

Rp
Rp
Rp

136,980.00
152,190.00
182,620.00

9.00
23.00
16.00

Meter

Rp

125,320.00

84.00

Sq. Meter

Rp

6,860.00

1,000.00

Cu. Meter

Rp

1,342,590.00

115.00

Each

Rp
Rp
Rp
Rp

85,640.00
3,458,090.00
-

Package

Meter
Meter
Each
Each
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Joint

Meter
Meter

Cu.Meter.Day

Each
Each
Each

Cu.Meter
Sq.Meter
Kilogram

joint

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

107,700.00
644,590.00
502,830.00
322,270.00
50,730.00
101,460.00
106,540.00
101,460.00
126,860.00
101,460.00
152,190.00
202,910.00
253,640.00
3,759,460.00

Rp
Rp
Rp
Rp
Rp
Rp

496,860.00
428,620.00
38,110.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

89,920.00
330,470.00
466,300.00
1,520,210.00
1,038,950.00
13,690.00
401,200.00

457,563,680.00

0.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,337,360.00
75,190.00
376,000.00
12,924,000.00
4,652,400.00
31,015,200.00
9,304,920.00
64,459,000.00
84,475,440.00
8,045,280.00
12,067,840.00
2,715,280.00
3,620,320.00
644,540.00
4,525,400.00
7,542,450.00
25,343,220.00
1,232,820.00
3,500,370.00
2,921,920.00
10,526,880.00
6,860,000.00
154,397,850.00

0.00

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Вам также может понравиться