UNDERPASS PROJECT DEVELOPMENT

ROAD DRAINAGE CALCULATION


Data:
Flow rate , v =
Flow coeffisient, c; Asphalt & concrete
Shoulder
Stone Turfing
Rain Intensity, I
Free board

0.8 - 1.5
m/s
0.7 - 0.95
Breadth =
0.1 - 0.2
Breadth =
0.6 - 0.9
Breadth =
150 mm/hr
0.25
m

16 m
2.7 m
7.15 m

Formula:
Q = c x I x A / 3.6
Where:
Q = Discharge capacity
c = Flow coeffisient
I = Rain intensity
A = Catchment area

LOCATION
STA-A to STA -B
STA-A1 to STA -C
STA-E to STA -C
STA-F to STA -B
STA-B to STA -C
STA-C to STA -D

(m3/m)
(mm/hr)
(km2)

R = F/p
Where:
p = Wetted perimeter

b = Breadth of bottom
d = Water Depth

m
m

Length
(m)
36
40
64
60
20
200

A (km2)
Road
Shoulder
Turfing
0.00058 0.0000972 0.0002574
0.00064 0.000108
0.000286
0.00102 0.0001728 0.0004576
0.00096 0.000162
0.000429
0.00032 0.000054
0.000143
0.0032
0.00054
0.00143

F = Q/v
Where:
F = Wet flow area
(m2)
Q = Discharge capacity(m3/s)
v = Flow rate
(m/s)

v = 1/n x R^(2/3) x i^(1/2)


Where:
v = Flow rate
(m/s)
n = Manning roughnesses coeffisient
i = Bottom slope
R = Hydraulic radius (m)
Q
(m3)
0.041
0.045
0.072
0.068
0.135
0.338

i
2.50E-03
2.50E-03
2.50E-03
2.50E-03
2.50E-03
5.00E-03

b
(m)
0.8
0.8
0.6
0.6
1
1.1

d
(m)
0.35
0.35
0.45
0.45
0.25
0.4

F
(m2)
0.258
0.258
0.304
0.304
0.184
0.44

0.013

P
(m)
1.064
1.064
1.296
1.296
0.833
1.9

R
0.2427
0.2427
0.235
0.235
0.2206
0.2316

v
(m/s)
1.50
1.50
1.46
1.46
1.40
2.05

Qa
0.386
0.386
0.446
0.446
0.258
0.903

Check
Qa > Q
OK
OK
OK
OK
OK
OK

Type
Precast
U
U
Trap
Trap
Box
U

UNDERPASS PROJECT DEVELOPMENT


ROAD DRAINAGE CALCULATION
Data:
Flow rate , v =
Flow coeffisient, c; Asphalt & concrete
Shoulder
Stone Turfing
Rain Intensity, I
Free board

0.8 - 1.5
m/s
0.7 - 0.95
Breadth =
0.1 - 0.2
Breadth =
0.6 - 0.9
Breadth =
150 mm/hr
0.25
m

16 m
2.7 m
7.15 m

Formula:
Q = c x I x A / 3.6
Where:
Q = Discharge capacity
c = Flow coeffisient
I = Rain intensity
A = Catchment area

LOCATION
STA-A to STA -B
STA-B to STA -C
STA-C to STA -D
STA-D to STA -E
STA-E to STA -F
STA-F to STA -G
STA-G to STA -H
STA-H to STA -I
STA-I to STA -J
-

(m3/m)
(mm/hr)
(km2)

R = F/p
Where:
p = Wetted perimeter

b = Breadth of bottom
d = Water Depth

m
m

Length
(m)
Road
25 0.0004
25 0.0004
25 0.0004
25 0.0004
25 0.0004
25 0.0004
25 0.0004
25 0.0004
200 0.0032
0
0
0
0
400 m

A (km2)
Shoulder
0.0000675
0.0000675
0.0000675
0.0000675
0.0000675
0.0000675
0.0000675
0.0000675
0.00054
0
0

Turfing
0.0001788
0.0001788
0.0001788
0.0001788
0.0001788
0.0001788
0.0001788
0.0001788
0.00143
0
0

F = Q/v
Where:
F = Wet flow area
(m2)
Q = Discharge capacity(m3/s)
v = Flow rate
(m/s)

v = 1/n x R^(2/3) x i^(1/2)


Where:
v = Flow rate
(m/s)
n = Manning roughnesses coeffisient
i = Bottom slope
R = Hydraulic radius (m)
Q
(m3)
0.0281
0.0563
0.0844
0.1125
0.1407
0.1688
0.1969
0.2251
0.4502
0.4502
0.4502

i
2.50E-03
2.50E-03
2.50E-03
2.50E-03
2.50E-03
2.50E-03
2.50E-03
2.50E-03
2.20E-03
2.20E-03
2.20E-03

b
(m)
0.6
0.6
0.6
0.6
0.6
0.8
0.8
1
1.1
1.1
1.1

d
(m)
0.4
0.4
0.4
0.4
0.4
0.6
0.6
0.5
0.5
0.5
0.5

F
(m2)
0.256
0.256
0.256
0.256
0.256
0.48
0.48
0.5
0.55
0.55
0.55

0.013

P
(m)
1.18
1.18
1.18
1.18
1.18
2
2
2
2.1
2.1
2.1

R
0.2173
0.2173
0.2173
0.2173
0.2173
0.24
0.24
0.25
0.2619
0.2619
0.2619

v
(m/s)
1.39
1.39
1.39
1.39
1.39
1.49
1.49
1.53
1.48
1.48
1.48

Qa
0.356
0.356
0.356
0.356
0.356
0.713
0.713
0.763
0.812
0.812
0.812

Check
Qa > Q
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

Type
Precast
Trap
Trap
Trap
Trap
Trap
U
U
Box
Box
-

Soil Excavation 78.173

107.910 111.425 114.941 118.429 121.917 143.995

Back fill

(S.$)

AMOUNT

UNIT RATE

U100
100
120
9

QUANTITY

57
U100
100
120
9

2.55

50
U100
100
120
9

(S.$)

2.668 4.860 STA-12

2.741 4.860 STA-11

2.805 4.860 STA-10

50
U100
100
120
9

2.47

50
U100
100
120
9

2.40

2.12

2.869 4.860 STA-9

1.00

58.153

50
U100
100
120
9

2.33

1.13

59.640

2.933 4.860 STA-8

1.25

65.809

C80B
100
67
5

50
U100
100
120
9

2.26

2.998 4.860 STA-7

55
C80B
100
67
5

2.19

50
C80B
100
67
5

3.062 4.860

3.933 4.860 STA-5

50
C80B
100
67
5

71.978

STA-6

3.815 4.860 STA-4

50
C80B
100
67
5

4.062 4.860

3.698 4.860 STA-3

Area (m2)

1.63

Length (m) 50
Drain Type C80B
b = (cm) 100
h = (cm)
67
t = (cm)
5

1.38

Invert Level (m)

3.580 4.860 STA-2

Top Level (m)

1.50

STATION

3.462 4.860 STA-1

PT SMOE PHASE 2 DEVELOPMENT PROJECT


ROAD DRAINAGE
COST ESTIMATE

1104.99 m3

1.45

1,602.23

441.99 m3

1.45

640.89

Beam Concrete
Beam R/F Steel

0.29
53.40

0.29
53.40

0.29
53.40

0.29
53.40

0.32
58.42

0.29
53.40

0.29
53.40

0.29
53.40

0.29
53.40

0.29
53.40

0.33
61.20

3.24 m3
630.23 kg

78.00
1.20

252.50
756.27

Balustrade Concrete
Balustrade RF/Steel

7.13
304.73

5.71
249.67

4.30
194.60

2.89
140.00

1.54
92.92

0.00

7.20
265.07

7.97
294.93

8.75
325.27

9.52
355.13

10.28
385.00

12.73
475.44

78.03 m3
3236.89 kg

78.00
1.20

6,086.03
3,884.27

Formwork
Concrete Manhole

118.80

95.20

71.70

48.20

25.71

0.00

120.00

132.90

145.80

158.60

171.40

212.12

1365.46 m2
5.33
1 LS 3000.00

7,277.88
3,000.00

Sandfill

80 m3

11.00

880.00

3.00

1,209.00

Precast Drain C80B

255 m3

30.00

7,650.00

Precast Drain U100

310 m

85.00

26,350.00

S$
10%
S$
S$

59,589.06
5,958.91
65,547.97
65,000.00

Lean Concrete

403 m

TOTAL
Others
GRAND TOTAL
ARROUND