0.8 - 1.5
m/s
0.7 - 0.95
Breadth =
0.1 - 0.2
Breadth =
0.6 - 0.9
Breadth =
150 mm/hr
0.25
m
16 m
2.7 m
7.15 m
Formula:
Q = c x I x A / 3.6
Where:
Q = Discharge capacity
c = Flow coeffisient
I = Rain intensity
A = Catchment area
LOCATION
STA-A to STA -B
STA-A1 to STA -C
STA-E to STA -C
STA-F to STA -B
STA-B to STA -C
STA-C to STA -D
(m3/m)
(mm/hr)
(km2)
R = F/p
Where:
p = Wetted perimeter
b = Breadth of bottom
d = Water Depth
m
m
Length
(m)
36
40
64
60
20
200
A (km2)
Road
Shoulder
Turfing
0.00058 0.0000972 0.0002574
0.00064 0.000108
0.000286
0.00102 0.0001728 0.0004576
0.00096 0.000162
0.000429
0.00032 0.000054
0.000143
0.0032
0.00054
0.00143
F = Q/v
Where:
F = Wet flow area
(m2)
Q = Discharge capacity(m3/s)
v = Flow rate
(m/s)
i
2.50E-03
2.50E-03
2.50E-03
2.50E-03
2.50E-03
5.00E-03
b
(m)
0.8
0.8
0.6
0.6
1
1.1
d
(m)
0.35
0.35
0.45
0.45
0.25
0.4
F
(m2)
0.258
0.258
0.304
0.304
0.184
0.44
0.013
P
(m)
1.064
1.064
1.296
1.296
0.833
1.9
R
0.2427
0.2427
0.235
0.235
0.2206
0.2316
v
(m/s)
1.50
1.50
1.46
1.46
1.40
2.05
Qa
0.386
0.386
0.446
0.446
0.258
0.903
Check
Qa > Q
OK
OK
OK
OK
OK
OK
Type
Precast
U
U
Trap
Trap
Box
U
0.8 - 1.5
m/s
0.7 - 0.95
Breadth =
0.1 - 0.2
Breadth =
0.6 - 0.9
Breadth =
150 mm/hr
0.25
m
16 m
2.7 m
7.15 m
Formula:
Q = c x I x A / 3.6
Where:
Q = Discharge capacity
c = Flow coeffisient
I = Rain intensity
A = Catchment area
LOCATION
STA-A to STA -B
STA-B to STA -C
STA-C to STA -D
STA-D to STA -E
STA-E to STA -F
STA-F to STA -G
STA-G to STA -H
STA-H to STA -I
STA-I to STA -J
-
(m3/m)
(mm/hr)
(km2)
R = F/p
Where:
p = Wetted perimeter
b = Breadth of bottom
d = Water Depth
m
m
Length
(m)
Road
25 0.0004
25 0.0004
25 0.0004
25 0.0004
25 0.0004
25 0.0004
25 0.0004
25 0.0004
200 0.0032
0
0
0
0
400 m
A (km2)
Shoulder
0.0000675
0.0000675
0.0000675
0.0000675
0.0000675
0.0000675
0.0000675
0.0000675
0.00054
0
0
Turfing
0.0001788
0.0001788
0.0001788
0.0001788
0.0001788
0.0001788
0.0001788
0.0001788
0.00143
0
0
F = Q/v
Where:
F = Wet flow area
(m2)
Q = Discharge capacity(m3/s)
v = Flow rate
(m/s)
i
2.50E-03
2.50E-03
2.50E-03
2.50E-03
2.50E-03
2.50E-03
2.50E-03
2.50E-03
2.20E-03
2.20E-03
2.20E-03
b
(m)
0.6
0.6
0.6
0.6
0.6
0.8
0.8
1
1.1
1.1
1.1
d
(m)
0.4
0.4
0.4
0.4
0.4
0.6
0.6
0.5
0.5
0.5
0.5
F
(m2)
0.256
0.256
0.256
0.256
0.256
0.48
0.48
0.5
0.55
0.55
0.55
0.013
P
(m)
1.18
1.18
1.18
1.18
1.18
2
2
2
2.1
2.1
2.1
R
0.2173
0.2173
0.2173
0.2173
0.2173
0.24
0.24
0.25
0.2619
0.2619
0.2619
v
(m/s)
1.39
1.39
1.39
1.39
1.39
1.49
1.49
1.53
1.48
1.48
1.48
Qa
0.356
0.356
0.356
0.356
0.356
0.713
0.713
0.763
0.812
0.812
0.812
Check
Qa > Q
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
Type
Precast
Trap
Trap
Trap
Trap
Trap
U
U
Box
Box
-
Back fill
(S.$)
AMOUNT
UNIT RATE
U100
100
120
9
QUANTITY
57
U100
100
120
9
2.55
50
U100
100
120
9
(S.$)
50
U100
100
120
9
2.47
50
U100
100
120
9
2.40
2.12
1.00
58.153
50
U100
100
120
9
2.33
1.13
59.640
1.25
65.809
C80B
100
67
5
50
U100
100
120
9
2.26
55
C80B
100
67
5
2.19
50
C80B
100
67
5
3.062 4.860
50
C80B
100
67
5
71.978
STA-6
50
C80B
100
67
5
4.062 4.860
Area (m2)
1.63
Length (m) 50
Drain Type C80B
b = (cm) 100
h = (cm)
67
t = (cm)
5
1.38
1.50
STATION
1104.99 m3
1.45
1,602.23
441.99 m3
1.45
640.89
Beam Concrete
Beam R/F Steel
0.29
53.40
0.29
53.40
0.29
53.40
0.29
53.40
0.32
58.42
0.29
53.40
0.29
53.40
0.29
53.40
0.29
53.40
0.29
53.40
0.33
61.20
3.24 m3
630.23 kg
78.00
1.20
252.50
756.27
Balustrade Concrete
Balustrade RF/Steel
7.13
304.73
5.71
249.67
4.30
194.60
2.89
140.00
1.54
92.92
0.00
7.20
265.07
7.97
294.93
8.75
325.27
9.52
355.13
10.28
385.00
12.73
475.44
78.03 m3
3236.89 kg
78.00
1.20
6,086.03
3,884.27
Formwork
Concrete Manhole
118.80
95.20
71.70
48.20
25.71
0.00
120.00
132.90
145.80
158.60
171.40
212.12
1365.46 m2
5.33
1 LS 3000.00
7,277.88
3,000.00
Sandfill
80 m3
11.00
880.00
3.00
1,209.00
255 m3
30.00
7,650.00
310 m
85.00
26,350.00
S$
10%
S$
S$
59,589.06
5,958.91
65,547.97
65,000.00
Lean Concrete
403 m
TOTAL
Others
GRAND TOTAL
ARROUND