Академический Документы
Профессиональный Документы
Культура Документы
PERFORMANCE PARAMETERS
Section VI-G
Page - 1 / 8
1.1
OPTION - 1: MILLING
Sr.
No.
1.
2.
Description
Unit
Mode A
Mode B
Mode C
Bar (a)
0
C
64
500 + 0, - 5
64
500 + 0, - 5
- Flow
t/h
205
159
64
500 + 0,
-5
75
First
uncontrolled
extraction
steam at 8.0 bar (a)
- Flow for process
- Flow for steam jet ejector
- Extraction steam temperature
t/h
t/h
0
C
26.5
*
*
15
*
*
0.00
*
*
t/h
0
C
157.5
*
94
*
53.5
*
0.14
32
0.14
32
0.14
32
*
*
*
*
*
*
Second controlled
steam at 2.6 bar (a)
extraction
* Bidders to specify
11
0.8 lagging
Required
230
50 5%
Continuous 7000 hrs in a year
Below 2.8
PERFORMANCE PARAMETERS
Section VI-G
Page - 2 / 8
17.
18.
Unit
Mode A
Mode B
[db(A)]
85
15
Mode
C
OPTION 2: DIFFUSER
Sr.
No.
1.
2.
Description
Unit
Mode A
Mode B
Mode C
Bar (a)
0
C
64
500 + 0, - 5
64
500 + 0, - 5
- Flow
t/h
214
166.87
64
500 + 0, 5
69.69
First
uncontrolled
extraction
steam at 8.0 bar (a)
- Flow for process
- Flow for steam jet ejector
- Extraction steam temperature
t/h
t/h
0
C
27.8
*
*
15.75
*
*
0.00
*
*
t/h
0
C
163.45
*
103.16
*
47.16
*
MW
Bar (a)
0
C
0.14
32
0.14
32
0.14
32
*
*
*
*
*
*
Kg/kW
Second controlled
steam at 2.6 bar (a)
extraction
* Bidders to specify
PERFORMANCE PARAMETERS
Section VI-G
Page - 3 / 8
18.
1.2
Description
Unit
Alternator
Unit
Alternator voltage
KV
Power Factor
Parallel operation with grid
Grid voltage
KV
Frequency
Hz
Duty condition
Vibrations
mm/sec
Maximum noise level at 1 m [db(A)]
distance for any equipment from
the equipment shall be not more
than
The minimum continuous load at
%
which the turbo-alternator is
expected
to
operate
as
percentage of MCR load
Mode A
Mode B
Mode C
11
0.8 lagging
Required
230
50 5%
Continuous 7000 hrs in a year
Below 2.8
85
15
Sr.
No.
Description
Unit installed
KW per
unit
1.
2.
3.
4.
5.
6.
7.
8.
* Bidders to specify
Total
Installed
KW
Total
Operating
power KW
No. of
units
normal
operation
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
PERFORMANCE PARAMETERS
Section VI-G
Page - 4 / 8
Sr.
No.
9.
1.3
Description
Total power
required for all
auxiliary
equipment
KW per
unit
No. of
units
normal
operation
*
Total
Installed
KW
Total
Operating
power KW
Net power output from cogeneration power plant for Both Options
Sr. No.
1.
2.
3.
1.4
Unit installed
Description
Power generated
Captive power
Net output
Unit
KW
KW
KW
Option 1 - Milling
*
*
*
Option 2 - Diffuser
*
*
*
Turbine
Sr.
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Description
Type of turbine
Model No.
Operating conditions
Speed
Inlet steam pressure
Inlet steam temperature
Uncontrolled extraction at
steam pressure
Steam flow t/h maximum
Steam flow t/h minimum
Controlled
extraction
at
steam pressure
Steam flow t/h maximum
Steam flow t/h minimum
Steam flow condenser at
pressure
Steam flow t/h maximum
Steam flow t/h minimum
Cooling water temperature
(inlet)
Cooling water temperature
(outlet)
Cooling water required t/h
Maximum
Minimum
* Bidders to specify
Unit
rpm
Bar (a)
0
C
Bar (a)
Option-1:
Milling
*
*
*
*
64
500 + 0, - 5
8
Option-2:
Diffuser
*
*
*
*
64
500 + 0, - 5
8
t/h
t/h
Bar (a)
*
*
2.6
*
*
2.6
t/h
t/h
Bar (a)
*
*
0.14
*
*
0.14
t/h
t/h
0
C
*
*
32
*
*
32
*
*
*
*
t/h
t/h
PERFORMANCE PARAMETERS
Section VI-G
Page - 5 / 8
Sr.
No.
19.
20.
21.
1.5
Description
Thermodynamic
efficiency
per stage
Overall
efficiency
(electromechanical)
Steam rate
Option-1:
Milling
*
Option-2:
Diffuser
*
Kg/KW/
hr
Gear Box
Sr. No.
1.
2.
3.
4.
5.
6.
1.6
Unit
Description
Quantity
Type
Input speed
Output speed
Rated power
Service factor (AGMA)
Option-2 : Diffuser
3 No.
*
*
*
*
*
Alternator
Sr.
No.
1.
2.
3.
4.
5.
6.
7.
8.
Description
9.
10.
11.
Quantity
Rating
Pole
Power factor
Supply
Type of machine
Cooling
Enclosure
protection
Mounting
Insulation
Temperature rise
12.
Specification
* Bidders to specify
Unit
Nos
kW/MW
Nos
KV/Hz
Option-2 : Diffuser
3 No.
*
4
0.8
11/50
AC brushless
CACW
IP5X
3 No.
*
4
0.8
11/50
AC brushless
CACW
IP5X
Horizontal foot
Class F
Limited to insulation
Class B. Based on
maxi. Cooling water
temperature 320C
IEC 34 or equivalent
Horizontal foot
Class F
Limited to insulation
Class B. Based on
maxi. Cooling water
temperature 320C
IEC 34 or equivalent
PERFORMANCE PARAMETERS
Section VI-G
Page - 6 / 8
Condenser
Sr.
No.
1.
Description
Type
2.
3.
4.
5.
6.
7.
8.
9.
10.
1.8
Unit
Bar (a)
t/h
Option-2: Diffuser
t/h
Kcal/Kg
m3/hr
0
C
0
C
*
*
32
*
*
*
32
*
m2
*
*
*
*
*
*
Methods of acceptance testing of industrial type steam turbines. Provides the basis
for acceptance tests for back pressure, mixed pressures, condensing and pass out
steam turbines as in industrial and marine applications.
2.0
* Bidders to specify
Description
Safe working load
Vertical deflection caused by safe
work load and weight of the crab
in the central position shall not
exceed
Unit
Tons
*
1/900 of the span
th
PERFORMANCE PARAMETERS
Section VI-G
Page - 7 / 8
4.0
Description
Pressure
drop
from
steam
distribution header to turbine stop
valve
Temperature drop from steam
distribution header to turbine stop
valve
Unit
kg/cm2 (g)
THERMAL INSULATION
During steady state working conditions, the difference in temperature between the
ambient and the outside surface of insulation shall not be more than 20 0C.
5.0
5.1
Water pumps
The Bidder shall give field performance tests as per pump characteristic curves for
following parameters for the pumps supplied within battery limits :
a)
b)
c)
5.2
Cooling tower
The Bidder shall conduct field tests in accordance with standard procedure for
acceptance test of Cooling Tower Institute-USA (or) equivalent. The performance of
the cooling tower shall be guaranteed over the following range :
a)
b)
Cooling range
c)
In addition to above, tests shall be conducted at the works on fans, speed reducers,
drives, etc for satisfactory performance. Test certificates for these shall be submitted
for Employers approval.
* Bidders to specify
PERFORMANCE PARAMETERS
Section VI-G
Page - 8 / 8
Motor details
Total no. of
units
Units in
operation
1.
Make up water
pumps
CW pumps
ACW pumps
Fans
CEP Pumps
2
4
4
7
2
2.
3.
5.
6.
Power
Rating of
Each Unit
*
Guaranteed
Power
Consumption
*
3
3
6
1
*
*
*
*
*
*
*
*
Total Power
Consumption
Bidder to furnish the details of electrical consumption of each equipment and total
guaranteed power consumption of all consumers within battery limits.
6.0
AIR COMPRESSOR
Air Compressor
-Power consumption
-Outlet air moisture
- Capacity each
KW
M3/h
*
< 1 ppm
*
*
*
*
7.0
7.1
Bidder shall include in his bid for the supply, installation, testing and calibration of all
instruments which require for conducting performance test of the various equipment,
systems within battery limits.
7.2
7.3
* Bidders to specify