J P MUKHERJI & ASSOCIATES PVT LTD

Tendaho Sugar Project

PERFORMANCE PARAMETERS

Section VI-G
Page - 1 / 8

BID DOCUMENT FOR


POWER GENERATION PLANT
1.0

COGENERATION PLANT AND THEIR ACCESSORIES

1.1

Cogeneration Power Plant Turbo-Alternator

OPTION - 1: MILLING
Sr.
No.
1.

2.

Description

Unit

Mode A

Mode B

Mode C

Bar (a)
0
C

64
500 + 0, - 5

64
500 + 0, - 5

- Flow

t/h

205

159

64
500 + 0,
-5
75

First
uncontrolled
extraction
steam at 8.0 bar (a)
- Flow for process
- Flow for steam jet ejector
- Extraction steam temperature

t/h
t/h
0
C

26.5
*
*

15
*
*

0.00
*
*

t/h
0
C

157.5
*

94
*

53.5
*

0.14
32

0.14
32

0.14
32

*
*

*
*

*
*

Inlet live steam at TSV


- Pressure
- Temperature

Second controlled
steam at 2.6 bar (a)

extraction

- Flow for process


- Extraction steam temperature
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.

Power available at alternator


MW
terminal
Condenser operating pressure
Bar (a)
0
Condenser
cooling
water
C
temperature
Condenser sizing
0
Condenser
outlet
water
C
temperature
Economical steam rate at 80-100 Kg/kW
% percentage load
Alternator
Alternator voltage
KV
Power Factor
Parallel operation with grid
Grid voltage
KV
Frequency
Hz
Duty condition
Vibrations
mm/sec

* Bidders to specify

11
0.8 lagging
Required
230
50 5%
Continuous 7000 hrs in a year
Below 2.8

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

PERFORMANCE PARAMETERS

Section VI-G
Page - 2 / 8

BID DOCUMENT FOR


POWER GENERATION PLANT

Sr. No. Description

17.

18.

Unit

Maximum noise level at 1 m


distance for any equipment from
the equipment shall be not more
than
The minimum continuous load at
which the turbo-alternator is
expected
to
operate
as
percentage of MCR load

Mode A

Mode B

[db(A)]

85

15

Mode
C

OPTION 2: DIFFUSER
Sr.
No.
1.

2.

Description

Unit

Mode A

Mode B

Mode C

Bar (a)
0
C

64
500 + 0, - 5

64
500 + 0, - 5

- Flow

t/h

214

166.87

64
500 + 0, 5
69.69

First
uncontrolled
extraction
steam at 8.0 bar (a)
- Flow for process
- Flow for steam jet ejector
- Extraction steam temperature

t/h
t/h
0
C

27.8
*
*

15.75
*
*

0.00
*
*

t/h
0
C

163.45
*

103.16
*

47.16
*

MW

Bar (a)
0
C

0.14
32

0.14
32

0.14
32

*
*

*
*

*
*

Kg/kW

Inlet live steam at TSV


- Pressure
- Temperature

Second controlled
steam at 2.6 bar (a)

extraction

- Flow for process


- Extraction steam temperature
3.
4.
5.
6.
7.
8.

Power available at alternator


terminal
Condenser operating pressure
Condenser
cooling
water
temperature
Condenser sizing
Condenser
outlet
water
temperature
Economical steam rate at 80-100
% percentage load

* Bidders to specify

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

PERFORMANCE PARAMETERS

Section VI-G
Page - 3 / 8

BID DOCUMENT FOR


POWER GENERATION PLANT
OPTION 2: DIFFUSER
Sr.
No.
9.
10.
11.
12.
13.
14.
15.
16.
17.

18.

1.2

Description

Unit

Alternator
Unit
Alternator voltage
KV
Power Factor
Parallel operation with grid
Grid voltage
KV
Frequency
Hz
Duty condition
Vibrations
mm/sec
Maximum noise level at 1 m [db(A)]
distance for any equipment from
the equipment shall be not more
than
The minimum continuous load at
%
which the turbo-alternator is
expected
to
operate
as
percentage of MCR load

Mode A

Mode B

Mode C

11
0.8 lagging
Required
230
50 5%
Continuous 7000 hrs in a year
Below 2.8
85

15

Power Consumption of Auxiliary Equipment - for Both Options


The Bidder to furnish the list of all auxiliary equipment, their installed power,
operating power, etc for both options. The preliminary list is given below:

Sr.
No.

Description

Unit installed

KW per
unit

1.

Auxiliary oil pump


motor (AC)
Emergency
oil
pump motor (DC)
Condensate water
pumps motor
Power house
crane for both
40/20 t
Hoist motor
Cross travel
Long travel
Any other motors
a) Barring gear
b) Oil vapour
extractor
c) Oil centrifuge

2.
3.
4.
5.
6.
7.
8.

* Bidders to specify

Total
Installed
KW

Total
Operating
power KW

No. of
units
normal
operation
*

*
*
*

*
*
*

*
*
*

*
*
*

*
*
*

*
*
*

*
*
*

*
*
*

*
*
*

*
*
*

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

PERFORMANCE PARAMETERS

Section VI-G
Page - 4 / 8

BID DOCUMENT FOR


POWER GENERATION PLANT

Sr.
No.
9.

1.3

Description

Total power
required for all
auxiliary
equipment

KW per
unit

No. of
units
normal
operation
*

Total
Installed
KW

Total
Operating
power KW

Net power output from cogeneration power plant for Both Options
Sr. No.
1.
2.
3.

1.4

Unit installed

Description
Power generated
Captive power
Net output

Unit
KW
KW
KW

Option 1 - Milling
*
*
*

Option 2 - Diffuser
*
*
*

Turbine
Sr.
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

Description
Type of turbine
Model No.
Operating conditions
Speed
Inlet steam pressure
Inlet steam temperature
Uncontrolled extraction at
steam pressure
Steam flow t/h maximum
Steam flow t/h minimum
Controlled
extraction
at
steam pressure
Steam flow t/h maximum
Steam flow t/h minimum
Steam flow condenser at
pressure
Steam flow t/h maximum
Steam flow t/h minimum
Cooling water temperature
(inlet)
Cooling water temperature
(outlet)
Cooling water required t/h
Maximum
Minimum

* Bidders to specify

Unit

rpm
Bar (a)
0
C
Bar (a)

Option-1:
Milling
*
*
*
*
64
500 + 0, - 5
8

Option-2:
Diffuser
*
*
*
*
64
500 + 0, - 5
8

t/h
t/h
Bar (a)

*
*
2.6

*
*
2.6

t/h
t/h
Bar (a)

*
*
0.14

*
*
0.14

t/h
t/h
0
C

*
*
32

*
*
32

*
*

*
*

t/h
t/h

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

PERFORMANCE PARAMETERS

Section VI-G
Page - 5 / 8

BID DOCUMENT FOR


POWER GENERATION PLANT

Sr.
No.
19.
20.
21.
1.5

Description
Thermodynamic
efficiency
per stage
Overall
efficiency
(electromechanical)
Steam rate

Option-1:
Milling
*

Option-2:
Diffuser
*

Kg/KW/
hr

Gear Box
Sr. No.
1.
2.
3.
4.
5.
6.

1.6

Unit

Description
Quantity
Type
Input speed
Output speed
Rated power
Service factor (AGMA)

Option -1: Milling


3 No
*
*
*
*
*

Option-2 : Diffuser
3 No.
*
*
*
*
*

Alternator
Sr.
No.
1.
2.
3.
4.
5.
6.
7.
8.

Description

9.
10.
11.

Quantity
Rating
Pole
Power factor
Supply
Type of machine
Cooling
Enclosure
protection
Mounting
Insulation
Temperature rise

12.

Specification

* Bidders to specify

Unit
Nos
kW/MW
Nos
KV/Hz

Option -1: Milling

Option-2 : Diffuser

3 No.
*
4
0.8
11/50
AC brushless
CACW
IP5X

3 No.
*
4
0.8
11/50
AC brushless
CACW
IP5X

Horizontal foot
Class F
Limited to insulation
Class B. Based on
maxi. Cooling water
temperature 320C
IEC 34 or equivalent

Horizontal foot
Class F
Limited to insulation
Class B. Based on
maxi. Cooling water
temperature 320C
IEC 34 or equivalent

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

PERFORMANCE PARAMETERS

Section VI-G
Page - 6 / 8

BID DOCUMENT FOR


POWER GENERATION PLANT
1.7

Condenser
Sr.
No.
1.

Description
Type

2.
3.

Steam inlet pressure


Steam
condensed
maximum
Steam
condensed
minimum
Heat rejected
Circulating water
Water inlet temperature
Water outlet
temperature
Heating surface
Material of construction
- Shell
- Tube
- Tube plate

4.
5.
6.
7.
8.
9.
10.

1.8

Unit

Bar (a)
t/h

Option -1: Milling

Option-2: Diffuser

Horizontal shell & Horizontal shell &


tube divided water tube divided water
box type
box type
0.14
0.14
*
*

t/h

Kcal/Kg
m3/hr
0
C
0
C

*
*
32
*

*
*
32
*

m2

*
*
*

*
*
*

Steam consumption guarantees


Steam consumption figures shall be given as per Bidders specifications.
a)
b)

Guarantee subject to a tolerance to cover instrument errors.


Testing is to confirm to BS: 60953-1996 (Part - 2), ASME PTC 65 DIN 1943
or equivalent.

Methods of acceptance testing of industrial type steam turbines. Provides the basis
for acceptance tests for back pressure, mixed pressures, condensing and pass out
steam turbines as in industrial and marine applications.
2.0

EOT CRANE FOR CO-GENERATION POWER HOUSE


Sr. No.
1.
2.

* Bidders to specify

Description
Safe working load
Vertical deflection caused by safe
work load and weight of the crab
in the central position shall not
exceed

Unit
Tons

*
1/900 of the span
th

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

PERFORMANCE PARAMETERS

Section VI-G
Page - 7 / 8

BID DOCUMENT FOR


POWER GENERATION PLANT
3.0

H.P. STEAM PIPING


Sr. No.
1.
2.

4.0

Description
Pressure
drop
from
steam
distribution header to turbine stop
valve
Temperature drop from steam
distribution header to turbine stop
valve

Unit
kg/cm2 (g)

Not more than *

THERMAL INSULATION
During steady state working conditions, the difference in temperature between the
ambient and the outside surface of insulation shall not be more than 20 0C.

5.0

COOLING TOWER AND PUMPS

5.1

Water pumps
The Bidder shall give field performance tests as per pump characteristic curves for
following parameters for the pumps supplied within battery limits :
a)
b)
c)

5.2

Quantity flow rate Discharge head Power consumption -

Cooling tower
The Bidder shall conduct field tests in accordance with standard procedure for
acceptance test of Cooling Tower Institute-USA (or) equivalent. The performance of
the cooling tower shall be guaranteed over the following range :
a)

Cooling water flow

90 % to 110 % of desired flow

b)

Cooling range

80 % to 120 % of design condition

c)

Wet bulb temperature

+ 1.7 0C to (-) 3.9 0C of design inlet wet bulb


temperature

In addition to above, tests shall be conducted at the works on fans, speed reducers,
drives, etc for satisfactory performance. Test certificates for these shall be submitted
for Employers approval.

* Bidders to specify

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

PERFORMANCE PARAMETERS

Section VI-G
Page - 8 / 8

BID DOCUMENT FOR


POWER GENERATION PLANT
5.3

Motor list and guaranteed power consumption


Sr.
No.

Motor details

Total no. of
units

Units in
operation

1.

Make up water
pumps
CW pumps
ACW pumps
Fans
CEP Pumps

2
4
4
7
2

2.
3.
5.
6.

Power
Rating of
Each Unit
*

Guaranteed
Power
Consumption
*

3
3
6
1

*
*
*
*

*
*
*
*

Total Power
Consumption

Bidder to furnish the details of electrical consumption of each equipment and total
guaranteed power consumption of all consumers within battery limits.
6.0

AIR COMPRESSOR
Air Compressor
-Power consumption
-Outlet air moisture
- Capacity each

KW
M3/h

*
< 1 ppm
*

*
*
*

7.0

INSTRUMENTS FOR CONDUCTING TESTS

7.1

Bidder shall include in his bid for the supply, installation, testing and calibration of all
instruments which require for conducting performance test of the various equipment,
systems within battery limits.

7.2

Any special equipment/instruments which are required and specifically brought by


the Bidder for the purpose of conducting performance test, can be taken back by the
Bidder.

7.3

Instruments/meters shall be calibrated as per relevant ASME or BS or equivalent


standards.

* Bidders to specify