BUTADIENE
dagah ren UNIT
e
Ra Be
aa
CHEMICAL CLEANING
PROTOCOL
LOOP 1-2
CC-121CHEMICAL CLEANING REPORT OF BdEU & AU AREA
_ LOOP 1-2 CC- 121
GS Om Es
CHEMICAL CLEANING OF BUTADIENE EXTRACTION
UNITS & AU AREA
PROJECT: OPaL DFCU AND AU UNITS,
CLIENT: ONGC Petro additions Limited
Contractor: SAMSUNG ENGINEERING CO, LTD
Sub — Contractor: ARUDRA ENGINEERS PVT LTD
CHENNAI INDIA
Page 1 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2 CC- 121
A
DESCRIPTION
PAGE
SYSTEM IN OPERATION CIRCUIT LOOP 1-2 CC - 121
ACTIVITY REPORTS
ANALYTICAL REPORT
NEUTRALIZATION TEST REPORT BY THIRD PARTY
10
7
CORROSION RATE
18
CONSUMPTION OF CHEMICALS , WATER& DIESEL,
19
GRAPH — ACID & IRON CHART
20& 24
10
‘TUBE SAMPLE BEFORE CHEMICAL CLEANING
2
TUBE SAMPLE AFTER PASSIVATION
STEEL WOOL TEST - INITIAL STAGE
23
4
1
12
STEEL WOOL TEST - FINAL STAGE
| PROTOCOL
25
26
Page 2 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2 CC- 121
7
EE ~ 130 A to D, EE - 110,
‘COLUMN / VESSELS EE ~111,VV-110,EE = 142
/EXCHANGERS cC-121 A&B, EE - 120 A&B,
EE - 121A&B, EE - 193A&B
PUMPS SUCTION & DISCHARGE
OF PUMPS
13-PC-122
13-PC - 133
13-PC-121
Page 3 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2 CC- 121
SANGIN
ENGINERING
>-
ACTIVITY REPORTS LOOP 1 ~2 CC - 121
DATE & "
"TIME (Hrs) ACTIVITIES
12.04.2016 | PRESSURE TEST O} PORARY PIPING
‘System involved: Supply and Return lines of temporary system up to Loop 1-
1 permanent system hook up points: Suction & discharge of pump 13 PC 122,
PC 133, PC 121.
17.00 | Pump started for filling with fire water.
17.20 __| System filling completed and press raised 12 Kg/ ent
17.55 Hydro test start — 10 Kg/ om’
18.10 | Hydro test end —10 Kg/ em"No leakages found. —
13.04.2016 | COLD WATER FLUSHING
00.55 | System filling started with fire water through 122 Pump discharge line and
suction line full open.
02.00 122 Pump suction valve closed and filling started for VV — 110, EI
—110,
03.50 110, FE— 111 filling completed and flushing started
05.00 | VV—110, EE— 110, EE— 111 isolated and filling started for EE 120 A, EE —
120B
08.00 __| Flushing stopped and filling started. EE 120 A, EE — 120 B valve closed.
12.15 122 Pump return valve 20% open, 121Pump return valve 50% close, EE 120
as A & B 20% open flushing started. Bottom pressure 5.8 Kg/em” -
14.25 _ | Fire water filling stopped and draining started
15.00 _ | Filling started through 133 pump discharge through 130 A, 130 B, 130 C, 130
D, EE 142 A & B, EE 193, BE 131, BE 110, BE 120 A & Ball line taken in
__| the circuit and open flushing started.
20.15 | System filling started with fire water through 122 pump discharge full open,
133 pump discharge 30 % open.
14.04.2016
03.00 | System CC - 121 filling completed and recirculation started. 122 pump
discharge full open, VV ~ 110, EE — 110, EE ~ 111, return 10% open, CC
121 over flow line to EE — 121A, EE — 121B, VV ~ 121 20% open, CC — 121
to EE 120A & EE — 120B line 3” line full open 133 pump supply & return
closed. During the processpH, conductivity, turbidity is tested and results are
tabulated in Annexure — A
Page 4 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2 CC- 121
AW sa
VA AGEING
LL HOT WATER FLUSHING
Steam charged to raise the temperature to bringing 65°C.
Draining started for Exchanger.
Draining completed.
[ Fire water filling started.
System filling completed and recirculation established. During the process
pH, conductivity, turbidity and temperature is tested and results are tabulated
in Annexure ~B aot
LLAS Water coming from VV 121 & EE 121 A& B
13.30 Steam charged to raise the temperature. _|
17.00 NOTE:
Visually the water sample appears pale yellow in colour. This is due to the
oxidation of iron which reflects in the slight higher value of turbidity. The
total iron was Analysed was 2.7 ppm. This is agreed upon mutually between
Opal, Samsung and Arudra and Hot water flushing declared completed.
DE-GREASING _
19.50 Caustic soda flakes addition started
20.30 Caustic soda flakes addition completed — 4300 kgs
20.45 Non ionic wetting agent added — 200 kgs.
15.04.2016
00.15 133 pump supply and return closed. co
01.00 ‘Steam charged to raise the temperature. CC — 121 filling completed. 122
pump discharge full open, VV — 110, 110, EE — 111, 10% open CC —
121 over flow line to El 121A & B, VV — 121 40% open, CC — 121 to EE
120 A & B, VV — 181 3” line 10% open.
01.25 Caustic soda flakes addition started
02.00. Caustic soda flakes addition completed — 2700 kgs
02.10 Non ionic wetting agent added — 150 kgs. cet
06.00. VV — 110, BE — 110, BE ~ 111 line closed
06.45 Caustic soda flakes added — 500 kgs.
07.00 VV — 181 3” line closed.
11.00to | All exchanger by pass valve open in circulation, During the process pH, Total
| 11.30 alkalinity as NaOH %, oil and grease and temperature is tested and results
7 are tabulated in Annexure — C
Total chemicals were consumed:
| 1. Caustic soda flakes — 7500 kgs. (For making 1 % solution)
_| 2. Non — ionic wetting agent — 350 kgs.(For making 0.05 % solution)
12.05 System draining started under plant air.(CC ~ 121, VV — 110, EE — 110,111
& EE ~ 121A & B, VV ~ 121)
16.04.2016
00.15 System draining started under plant air (EE — 130 A,B,C,D & EE - 142
A&B, and EE ~ 193, BE ~ 131, EE — 110, EE~— 120 A & B)
Page 5 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2 CC- 121
SAMSUNG
EAGNEEIG
04.30 __ | System draining completed. The spent alkaline solution is neutralized
COLD WATER FLUSHING - 1
05.00 | System CC - 121 filling started with fire water through PC 122 pump
discharge& supply line full open. And flushing started.
[05.40 | Flushing stopped and CC — 121 through PC 122 return Tine
06.00 | VV 110, EE ~ 110,11 filling completed and open flushing started,
06.45 _| Flushing stopped and CC ~ 121 filling started.
08.30 | CC— 121 Bottom pressure 5.0 Kg/em’
10.15 | System filling completed and recirculation established and open flushing
started for CC — 121, BE~121 A&B
EE — 130 A,B,CD open flushing started, CC — 121 main return open &
supply valve close, VV ~ 110 & EE ~ 110, BE ~ 111 return line open to
temporary drain valve in open , PC 121 return close. During the processpH,
conductivity, turbidity,Total alkalinity and oil and grease is tested and results
are tabulated in Annexure ~D
[15.20 Pump stopped and system draining started.
17.04.2016
03.55 _| System draining completed, cH zi
COLD WATER FLUSHING — 2
04.00 | System CC — 121filling started with fire water through PC pump discharge
and supply line full open and flushing started.
05.00 Flushing stopped and CC — 121 filling started 7
05.20 'V — 110, EE ~ 110, FE— 111 flushing started.
05.55__ | VV— 110, EE— 110, EE — 111 flushing stopped and CC — 121 filling started.
09.00 __ | System filling completed and water coming from EE ~ 121 and VV - 121
09.15 ~ 121 and VV — 12Ifilling completed and open flushing started.
10.45 | VV—110,BE — 110, EE — 111 return valve 20% open.
12.15 | Filling started through 131 pump discharge to BE ~ 130 A,B,C,D and 142
A.B, EE~193 and EE - 120 A.& B
13.10 | Filling completed and open flushing started. During the processpH,
conductivity, turbidity,Total alkalinity and oil and grease is tested and results
are tabulated in Annexure ~ E
_[ System draining started
System draining completed.
INHIBITED CITRIC ACID PICKLING
02.15 | System CC — 121 filling started with DM water through PC pump discharge
and supply line full open and flushing started.
03.30 | VV—110, EE — 110, EE — 111 filling completed.
07.45 | CC—121 to EB — 120 A & B filling completed and open flushing started.
(09.00 | 133 pump supply open automatically filling started
09.45, — 130 A to D and EE - 120 A & B filling completed and open flushing
Page 6 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2 CC- 121
SWUSUNG
ENGINEERING
started H a
10.20 | Open flushing stopped and recirculation established.
10.30 | Loop EE — 130 A to D isolated PC 133 supply closed, CC = 121 taken in
circulation and Steam charged to raise the temperature bringing 70°C
MP steam valve closed due to steam line tripped.
Pump stopped due to steam problem
Pump started for recirculation established.
Steam charged (o raise the temperature
CC=121, VV = 121 and EE — 121 A & B loop return temperature 50.9 °C
Inhibitor Coronil 92 B additions started.
Inhibitor Coronil 92 B additions completed — 1410 k;
133 pump discharge valve closed,
Citric acid addition started
Citric acid addition completed — 17500 kgs and Ammonia 800 kgs added.
‘Ammonium bi fluoride added — 600 kgs.
19.04.2016
01.05 __| Citric acid ~ 1250 kgs and Ammonia ~ 100 kgs added.
04.40 110, EE ~ 111 taken in circulation.
05.50 | Citric acid — 1250 kgs, Ammonia — 100 kgs and Ammonium bi fluoride — 50
kgs added,
06.00__| EE— 130 A,B,C,D to EE — 120 B taken in circulation.
07.30 __| Citric acid — 1250 kgs, Ammonia ~ 100 kgs added,
09.40] VV 110, BE~ 110, EE ~ 111 taken in circulation. During the process Acidity,
pH, Fe**, Fe*’,Total Fe temperature and steel wool test is tested and results
are tabulated in Annexure ~ F
Total chemicals were consumed:
1, Inhibitor Coronil 92 B— 1410 kgs. (For making 0.02 % in solution)
2. Citric acid ~ 21250 kgs (For making 3 % in solution
3. Ammonia — 1100 kgs (For pH boost up in solution)
4, Ammonium bi fluoride ~ 650 kgs.(For making 0.1 % in solution)
11.00 | Pump stopped and system draining started under Nitrogen blanketin;
20.04.2016
02.00 __| System draining completed. The spent acid solution is neutralized.
DM WATER FLUSHING - 1
03.05 | System CC — 121 filling started with DM water through PC pump discharge
__| and supply line full open and flushing started.
04.45 | VV—110, EE — 110, EE — 111 flushing started.
(05.15 | Flushing stopped and CC — 121 filling started. iz
09.20 | Water coming from CC — 121 vent line
09.30 | Water coming from ventEE — 121 A,B and VV — 121 and recirculation , open
flushing started fe
11.45 | Water coming from vent EE — 130 A to D and CC — 121 hold up supply and
Page 7 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2 CC- 121
A
return close. EE — 130 A to D circulation and open flushing started.
results are tabulated in Annexure ~G
During the process Total Fe, pH , conductivity, and turbidityis tested and
21.04.2016
15.50 __ | Pump stopped and system draining started under Nitrogen blanketing.
06.00__| System draining completed.
DM WATER FLUSHING - 2
06.45 | System CC - 121 filling started with DM water through PC pump discharge
and supply line full open and flushing started.
07.45 __| Flushing stopped and filling started.
08.15 | EE — 110 open flushing started
08.45 | EE— 110 open flushing stopped and CC — 121 filling started.
09.50 | Steam charged to raise the temperature brining 55°C
11.45 | CC— 121 filling completed. VV — 121 ,EE — 121 A & B also filling
flushing started.
12,00 | PC 133 supply line 10% open for filling EE ~ 130 A to D.
completed water coming from vent line and recirculation established & open
12.50 | EE—130.A to D filling completed and kept in hold up.
13.00 | CC~ 121 Recirculation established During the process Total Fe, pH,
conductivity, and turbidi
14.20 | CC~ 121 loop temperature 50 °C
14.30 | Citric acid addition started
14.50 _| Citric acid addition completed — 1400 kgs and Ammonia added ~ 150 kgs.
18.00 VV — 110 return line 10% open and PC 133supply line 10% open and EE —
130 A to D return 20% open.
| 22.04.
20.15 Return line temperature 58 °C
20.30 Ammonia addition started to raise the pH 9.5 to 10.0
20.40 _| System CC = 121, VV — 110, VV — 121 circulations taken.
01.30 | Ammonia addition completed ~ 5400 kgs.
02.00 __| pH, Inlet — 9.82 Outlet 9.55
tested and results are tabulated in Annexure ~ HI |
CITRIC ACID RINSE AND NEUTRALIZATION & PASSIVATION
02.15 | Sodium Nitrite addition started.
03.00 Sodium Nitrite addition completed — 6000 Kgs.
13.00 | EE~ 130 A to D supply and return line 20% open, VV — 110, EE~ 110 and
EE — 111 return line 10% open.
13.15 ‘Ammonia added — 600 kgs.
14.00 EE — 130 A to D and VV ~ 110, EE — 110, EE — 111 recirculation started.
14.30 | Sodium Nitrite added — 1000 Kgs.
results are tabulated in Annexure ~I
Total chemicals were consumed:
During the process Acidity, total iron ,pH and temperature is tested and
Page 8 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
A LOOP 1-2 CC- 121
i Om
1. Citric acid — 1400 Kgs (For making 0.2 % in solution)
2. Liquor Ammonia - 6150 Kgs (For pH boost up in solution)
3._Sodium Nitrite — 7000 kgs (For making 1 % in solution)
16.10 Passivation process declared completed and system draining started under
Nitrogen blanketing, (EE ~ 130 A to D and VV ~ 110, EE~ 110, BE~111)
22.45 | CC—121 draining started
23.04.2016
10.10 | System draining completed.
‘The spent alkaline solution is neutralized.
ANALYTICAL REPORT
Page 9 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2 CC-121
SHUSING
ENGINEERING
COLD WATER FLUSHING
Annexure — A
Date /Time | Pump pressure pH | Conductivity | Turbidity | Remarks
(Hrs) Kg/em? (wis) (NTU)
Inlet Outlet
13.04.2016
O15 40 0.0 851 3774 19.1
01.40 4.0 0.0 8.46 362.2 113
02.15 4.0 0.0 8.40 362.1 7.6
02.30 4.0 0.0 8.46 368.2 10.5
04.45 4.0 0.0 8.36 345.3 58
07.00 5.0 0.0 6.73 403.5 45.4
07.30 5.0 0.0 6.79 348.5 16.1
08.00 6.0 0.0 7.04 329.1 144
08.30 65 1.0 7.05 292.5 67
09.00 67 15 7.16 296.8 4
09.30 65 4.0 7.24 296.8 12.2
10.00 65 35 7.21 299.8 118
10.30 65 1.0 7.25 332.4 28.1
11.00 6.7 15 7.25 336.6 271
11.30 65 1.0 7.27 325.7 144
12.00 65 0.0 7.29 321.6 14.9
[12.30 65 18 721 310.5 11.6
13.00 65 2.0 7.27 297.5 17.1
13.30 6.0 1s | 7.23 312.8 14.7 staal
14.00 6.0 15 721 3119 14.1
18.00 3.0 1.0 771 333.7 14
19.00 3.0 1.0 7.69 325.9 42
19.45 3.0 1.0 7.92 334.9 5.8
21.15 40 35 8.22 304.2 6.0
Page 10 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2 CC- 121
A
a
SAMSUNG
FNGNEERNG
HOT WATER FLUSHING
Annexure ~ B
declared completed
serene aes Temperature | yy Conductivity Turbidity Homans
irs) Kelem? eC) (ws) | TU)
In | Out | In | Out
14.04.2016 =
05.30 7.0 25 54 35 7.72 40.5
06.00 | 7.0 | 4.0 | 5&8 | 35 | 7.74 37.2 _|
06.30 | 7.0 | 35 | 58 | 35 | 7.78 39.4
o7.00 | 7.0 [35 | 58 | 35 | 7.82 40.3 7
0730 | 7.0 [35 | 61 | 38 | 7.81 54.1
08.00, 7.0 0.5 66 44 7.84 62.3
0830 | 7.0 [1.5 | 80 | 46 | 7.86 64.2
is | 67 [2.0 7.45 88.4
12.00 | 6.7 | 2.0 739 94.1
13.00 67 2.0 735 > 100
14.00 | 7.0 | 25 | 65 | 60 | 7.42 > 100
15.00 | 68 | 25 | 70 | 58 | 737 "> 100
16.00 | 65 [3.0 | 76 | 60 | 7.42 100
17.00 | 65 | 40 | 78 | 62 | 738 > 100
18.00 6.5 25 88 7 731 > 100
19.00 | 65 | 25 | 87 | 79 | 739 > 100
NOTE:
Visually the water sample appears pale yellow in colour This is due to the oxidation of iron
which reflects in the slight higher value of turbidity. After removing the interference of iron,
again when checked for the turbidity the value drops to the acceptable limit of < 10 NTU.The |
uults was observed to drop from 100 NTU to 2.5 NTU. Total Iron analyzed was 2.7 ppm
his is agreed upon mutually between Opal, Samsung and Arudra and Hot water flushing
Annexure —C
Page 11 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2 CC- 121
A
a
DE — GREASING
tenho jem Temp Total Ol &
2 co pH Alkalinity as | Grease | Remarks
in) Rote NaOH (%) | (ppm)
In_| Out | In | Out | _
14.04.2016 =
20.45 67 | 28 | 79 | 79 | 1234 1.792 Eee
21.45 67 3.2 71 | 76 12.46 3.04 12.0
22.45 67 32 BB 74 12.60, 2.30 =
23.45 67 3.2 7B 72_| 12.54 2.08 12.4
15.04.2016 :
oo4s | 7.0 | 15 | 53 | 51 | 1239 | 03 Ect
01.45, 7.0 2.0 69 56 | 12.26 0.2 13.2
02.45, 7.0 17 70_ | 58 12.28 0.24
03.45, 70 is 70 58 12.34 0.22 18.0
04.45, 7.0 | 2.5 67 58 12.26 0.14 it
|___ 05.45 7.0. 3.0 67 59 12.54 0.54 oo
06.45 | 60 | 3.3 | 75 | 65 | 12.61 118 19.5
07.45, 7.0 3.0 77 66 12.63 1.22
08.45, 7.0 | 3.0 B 66 12.60 118 19.8
09.30 7.0 3.0 B 66 12.65 1.16 19.6
10.30 7.0 | 3.0 7B 67 12.63 1,024
11.30 7.0 3.0 77 66 12.64 1.04 19.0
Annexure
Page 12 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
: LOOP 1-2CC-121
A MS
las BASEN
COLD WATER FLUSHIN
Pump
a aasial Total | O11&
D came ven pH Sr r ae Alkalinity as | Grease
Ta | Out NaOH (ppm) | (ppm)
16.04.2016 :
40 | 00 | 12.60 | _17380 $100 3040
45 | 00 | 1257| 16354 38.8 2016 | 72
“09.30 | 5.0 | 0.0 | 12.50 | 12800 > 100 2000 8.6
1115 | 70 | 3.5 | 10.45 | 428.9 84 80 Nil
12.15 | 7.0 | 35 | 10.04 | 384.7 10 40
13.50 | 70 | 3.5 | 12.78 | 38580 38.2 6520 96
1515 | 70 | 35 | 12.71] 19850 B2 3680 34
16.15 | 5.0 | 5.0 | 1159 | 1054 17.6 220 08
Annexure —E
COLD WATER FLUSHING - 2
Pump
; i a Total | O&
Date/Time | pressure | yy | Conductivity Twehit | ana a | Grease
In | Out NaOH (ppm) | (ppm)
17.04.2016 E a
[044s | 45 | 20 | 10.01 390 38.1 40 Nil
05.45 | 45 | 21 | 8.79 356 518 2 Nil
10.15, 65 3.5 9.58 328.6 23.3 24
11.00 | 65 | 3.5 | 957 356 23.2 16
1130 | 65 | 35 | 9.50 317 176 2
1330 | 35 | 35 | 12.19 | 4580 47 696
ais | 35 | 3.5 | 11.28 876 25 120 _|
15.00 | 50 | 25 | 10.12 387 45 40 Nil
1530 | 5.0 | 25 | 9.80 385 72 28
16.00 | 50 | 25 | 950 | 479 88 70
16.30, 5.0 2.5 947 375 5.0 24 | _ Nil
Page 13 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2 CC- 121
Annexure —F
INHIBITED CITRIC ACID PICKLIN
Pump Citric | 5.3 | pe2 | Total Steel
Date /Time | pressure ae acid | S| xe Fe | pH | wool
(Hrs) Kg/em? eo) (%) (ppm) | (ppm) (ppm) test
In | Out | In | Out
18.04.2016 ‘
23.30 | 40 | 77| 69 | 082 | 163 | 593 | 756 | 3.52 | Ok
19.04.2016
00.00 [7.0] 4.0 | 76 | 70 | 3.36 | 163 | 2627 | 2790 | 3.58
00.30 [| 7.0| 40 [77] 71 | 3.32 167 | 2654 | 2817 | 3.55 | Ok
01.00 [7.0 | 4.0 | 77 | 70 | 3.26 167_| 2678 | 2845 | 3.62
01.30 [7.0] 4.0 [77 | 71 | 3.20 167 | 2738 | 2905 | 3.57 | Ok
02.00 | 7.0 | 4.0 | 76 | 71 3.17__|_167 | 2762 | 2929 | 3.55
02.30 [7.0 | 4.0 | 76 | 70 | 3.15 167_| 2790 | 2957 | 3.54 | Ok
03.00 [7.0 | 4.0 | 76 | 70 | 3.22 | 167 | 2804 | 2971 | 3.63
03.30 [7.0 | 4.0 | 75 [70 | 3.23 167 | 2818 | 2985 | 3.60 | Ok
04.00 | 7.0 | 4.0 [75 | 70 [3.23 167 | 2818 | 2985 | 3.61
04.30 [7.0 | 4.0 | 75 | 72 | 3.23 167_| 2818 | 2985 | 3.60 | Ok
05.00 3 [73 | 70 | 2.59 iit_| 1676 | 1787 | 3.26
0530 [65] 35 [73] 70 | 252 1] 1648 | 1759 | 3.23 | Ok
06.30 [5.5/3.5 | 73 | 7 | 2.54 167 | 1116 | 1283 | 3.09
07.00 [5.5 | 3.5 | 73 | 71 2.59 167 | 1283 | 1450 | 3.05 | Ok
08.00 [5.5/3.5 | 74 | 70 | 3.22 | 167 | 2995 | 3162 | 3.59
08.30 [5.5 | 3.5 | 74[ 70 | 3.15 167 | 2904 | 3071 | 3.57 | Ok
09.00 [5.5 | 3.5 | 74 | 71 3.15 167_| 2932 | 3099 | 3.56
0930 [5.5| 3.5 [74] 70 | 3.15 167 | 2932 | 3099 | 3.54 | Ok
1o10 [55] 35 [73 [ 70 | 3.11 167 | 2793 | 2960 | 3.55
10.40 [55/35 [73 | 70 | 3.11 167 | 2793 | 2960 | 3.52 | Ok
Annexure ~G
Page 14 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2 CC - 121
BR Ox, Gs
TS acts | a
DM WATER FLUSHIN' 1
Pump -
Date /Time pressure Conductivity | Turbidity Total Fe
dirs) | _Kgyem’ | PA | (us) @xru) | (pm | Remarks
Tn | Out F
20.04.2016 a
04.10. 40 | 2.0 3.67 867, 23.8 307
05.10 4.0 2.0 3.75 344 15 167
10.15 7.0 2.5 4.26 208 38.6 195
15 | 7.0 25 4.93 138 33.2 125 iz
12.30 5.0 3.0, 3.76 656 30.8 223
|__13.30 5.0 3.0 3.60 976 35.2 335
__ 14.30 5.0 3.0 3.70 869 17.10 268
15.15, 5.0 0 | 3.96 415 1.6 7
Annexure —H
DM WATER FLUSHING - 2
Pump
Date /Time pressure Turbidity Total Fe
(Hrs) Kg/em* pH (NTU) co |
In Out
21.04.2016
0730 | 40 | 15 | 448 46.26 125 i0 :
08.30 40 LS 493 26.41 8.6_ 5.0
12.00 7.0 3.5 5.36 18.0 318 5.5
12.30 7.0 3.0 5.91 M2 21.6 4.18
Annexure I
Page 15 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2 CC-121
A SWuSUNG
las a7
CITRIC ACID RINSE AND NEUTRALIZATION& PASSIVATIO!
Pump Temp
Date/Time | pressure °c) Citric 7 Total Fe | Remarks
(Hrs) Kg/em? i acid (%) | (ppm)
In_| Out | In_| Out
21.04.2016
16.00 | 7.0 | 3.0 | 75 | 53 7
1630 | 7.0 | 3.0| 74 | 58 | 007 | 407 335
1730 | 70 | 3.0 | 75 | 59 | 023 | 351 | 670
18.00__| 7.0 | 3.0 | 75 | @ | 028 | 3.56 89.3
1830 | 7.0 | 35 | 72 | 60 | 025 | 3.61 106
19.00 | 7.035) 70 | 58 | 032 | 3:58 112
1930 | 7.0 | 3.5 | 68 | 58 | 028 | 3.55 122
22.04.2016
02.00 7.0. 68 64 Z _3.55
03.00 | 7.0 ~67_| 64 9.85
04.00 7.0 65 65 10.30 a
05.00__|7.0 65_|_65 10.31
06.00__|7.0 64 | 65 1033 | __
07.00 | 7.0 | 1.0 | 63 | 64 7 10.35
08.00 | 7.0 | 1.0 | 62 | 63 10.17
09.00 | 7.0 | 1.0 | 63 | 62 10.20
10.00 | 7.0 | 3.0 | 63 _| 62 10.20
11.00_|7.0 | 3.0 | 61 | 60 | _ 10.14
12.00 | 7.0 | 3.0 | 60 | 58 10.02
14.00 7.0 3.0 59 57 9.97
1430 7.0 | 3.0 | 58_| 58 10.07
15,00_| 7.0_| 3.0 | 58 | 57 10.04
1530 | 7.0 | 3.0. | 57 | 55 9.97 [
Page 16 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2 CC-121
Sau
ENGINEERING
»-
NEUTRALIZATION TEST REPORT BY THIRD PARTY
Page 17 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2CC- 121
=
‘a
SAMSUNG
ENGINEERING
CORROSION R.
DESCRIPTION COUPON NOT COUPON NO2_
METAL LOss
Initial weight (gm) _ 97.2724 98.9346
Final weight (gm) —97.1519 98.8191
Metal loss (gm) 0.1205 0.1155
AREA 7 7 _|
OD (em) 5.860 5.880
1D (em) 5.145 3.142
H (cm) 1.980 1.972
2n (K+) [h+(R-H] é
‘Area in(cm”) 80.7838 81.0198
Area in (m’) 0.00807838 0.00810198
Corrosion rate (gm/m”) 14.91 14.25
‘Average corrosion rate (gm/m’) _| 14.58
‘Total quantity of oxides removed
‘Total Iron removed from the system Loop I — 2 (Ct
Total volume considered — 700 M'
~ 121) ~ 2960 ppm.
2Fe 112
Fe03160 —1.43(factor)
As Fe 2960 ppm x 700 M*
1000 x 1000
2.072 MT or 2072 kgs as Fe _
As FeO;
2072 kgs as Fe x 1.43
2962.96 kgs as FexO3
‘Amount of iron oxide removed as Fe,Osfrom the Loop 1 — 2 (CC — 121) during chemical
cleaning process=2962.96kgs
Page 18 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
_ LOOP 1-2 CC- 121
SMS
ENGINEER
UANTITY OF CHEMI
SI. | Process ‘Chemicals Purity | Cone | Quantity
No Step_ (%) | (%) used |
[1 Caustic soda flakes - NaOH 98.1 1.0 | 7500 kgs
2_| De -Greasing | Non — Tonic wetting agent 99.4 | 0.05 | 350 kgs
3 ‘Anti-foaming agent 99.0 _| Asrewird | 50 kgs
4 Citric acid — CgHsO7 99.93 | 3.0 | 21250kgs |
5_| Inhibited [Inhibitor Coronil 92 B 99.2 | 02 | 1410kgs
6 | Citric acid [Ammonium bi fluoride—NFGFHF [98.8 | 0.1 | 650 kgs
T pickling [Liquor Ammonia - NH OH 25 pH | 1100 kgs
8 ‘Anti-foaming agent 99.0 | Atewied
9 | Mild Rinse, | Citric acid — CoHyO> 99.93 | 0.2
[10 | Neutralization | Liquor Ammonia - NHy OH 25 pH | 6150 kes
11_| &Passivation | Sodium Nitrite —NaNOo 99.3 | 1.0 | 7000 kgs
FIRE WATER, DM WATER& DIESEL CONSUMPTION FOR THE ENTIRE
PROCESS
SI.No Description Fire water DM water DIESEL
(acu cw) a) (Liters)
1__| Cold water flushing 900 -
~2__| Hot water flushing 900 =
3__| De~Greasing - :
4 _| Cold water flushing - 1 900 =
5__| Cold water flushing - 2 800 =
| 6 Inhibited Citric acid pickling : 800
7__| DM water flushing - 1 Tithe 800
8 | DM water flushing - 2 - 300
9 | Citric acid rinse and passivation ~ =
‘Total quantit: 3500, 2400 4800
Page 19 of 26szsoozates
[se [sve ere enz sz ese] oot |eve lee eve exe sve ave] ce lace wee see wo vmo——|
G06 |0€ 008 007 0€5 [oF |ovs|oev oo ore ove oe aoz ver |oot ceo ovo eee
o
ST :
st F
’
LYWH) ALICGIOV
BOVIS ONT Told GIoV ORAL GALANT
SHAVED IOLA TVNV
Izi-99 7-1 dO0OT Vaud AV 8 NaPa AO LAOdTA ONINVATO TVOINGHDszso weateg
BOVIS ONT DOld lV ONLI) CALIENTE
LYWH NOU!
S 00s oFv oov ore oot ore o0z ort ot oF0 ovo aeez
Lt ¢92T $86z| S262 SB67|TL62 | LS62 6767 SOG SPRZ| LTE OBZ 9SL |19n90——
°
Gz)
Itl-997-TdO0OT
Vay AV 8 1aPa dO LAOdda ONINVAT.
(wid) 03CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2 CC- 121
SANSING
ENGINEERING
BEFORE CHEMICAL CLEANING T
{ SAMPLE
Page 22 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
_LOOP 1-2 CC- 121
SWUNG
ENGINEERING ee
»-
AFTER PASSIVATIONTUBE SAMPLE
Page 23 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2 CC- 121
>>
STEEL WOOLTEST- INITIAL STAGE
Page 24 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1-2 CC-121
A
STEEL WOOL TEST- FINAL STAGE
Page 25 of 26CHEMICAL CLEANING REPORT OF BdEU & AU AREA
LOOP 1~—2 CC - 121
A
@Q oz
PROJECT: OPaL, DUAL FEED CRACKER UNIT & ASSOCIATED UNITS
PROTOCOL: CHEMICAL CLEANING OF BdEU & AU AREA LOOP 1-2
(CC- 121)
COLUMN/EXCHANGERS/ EE- 130 A to D, EE ~ 110,
— aoa ee
121A&B, EE - 193A&B
Suction & discharge of
PUMPS pumps
13-PC- 122
13-PC-133
13-PC- 121
CONCLUT!
‘The Pre— Commissioning Chemical Cleaning of BUTA DIENE EXTRACTION UNIT
(ASSOCIATED UNIT) for LOOP 1 ~ 2 (CC — 121) was successfully declared completed.
‘Test coupon (kept inside pipeline) inspection was done jointly by M/s. OPaL, M/s.
SECL and M/s, Arudra on 25.04.2016, and. Quality of passivation (Magnetite layer)
formation was found uniform and satisfactory.
Mis, Arudra Engineers Mis, Samsung Mis. ONGC Petro
| Pvt Ltd Engineering co, Ltd_| _ additions Limited
wen] Pye | ee? | OF ae
Name | Gt. CHEPHIYAN FZ WCe, leas
Date | 26/64/2616 DL/ou / 266
Page 26 of 26