The SKIKDA Combined Cycle Power Plant, shall consist of (2) two modules, each with a single-shaft configuration
which includes a gas turbine, a heat recovery boiler and a steam turbine. Each module shall have approximately a
400 MW power generation.
The scope of the JV supply of equipment includes, but does not limit, the following:
One (1) Condenser (for each module);
One (1) complete 100% by-pass system to steam turbine, including all the necessary elements; (for
each module);
One (1) RMS (Natural gas regulating and metering station);
Feed pumping system to boilers (BFW pumps), (for each module);
One (1) water system plant, including storage tanks, chemical dosers, etc required for the correct
operation of the system;
One (1) primary circulating water circuit; (for each module);
One (1) secondary circulating water circuit; (for each module);
One (1) complete sea water collecting system, water transportation and discharge to sea (including
cleaning system);
One (1) complete sea water desalted unit;
One (1) compressed-air system for service air;
One (1) Fire Protection System (FPS);
One (1) air-conditioning and ventilation system (HVAC);
One (1) fuel gas system including unloading, transfer and injection;
One (1) electromechanical workshop and complete laboratory;

AEC
C. C. C. SKIKDA

C227879
Rev. 0; January 2003

Technical & Economical Bid. First Phase


General Description

Page 2 of 2

Equipment handling systems (bridge cranes, hoisting blocks, etc.) required for the correct
maintenance of the Plant;
Liquid (water, fuel-gas, etc) storage systems;
Process, office, storage, etc., buildings necessary for the correct operation of the Plant;
Electrical supply equipment: Among others: generator main power output transformers (TP),
generator switches, auxiliary group transformers (TAG), medium voltage boards (CMT), medium/low
voltage auxiliary transformers (TA), low voltage distribution system, low voltage essential services
system, power distribution, lighting and grounding, communication system and a 400 kV substation;
All equipment, elements, accessories, piping, instruments, structures, foundations, ducts, etc necessary
for the correct operation of the plant.
In this manner the J.V. shall assure AEC of the following:
Auxiliary consumption;
Noise level at limits of location site.
Net Power guaranteed
The equipment and units which form part of the supply scope of the J.V. are detailed and described in Particular
Requirements below.