1.
2.
SECTION A - A
0.40
PORTAL WALL
WING WALL
LEGEND:
7.40
3.00
0.75
8.09
60" PIPE
FUTURE
60" PIPE
LONGITUDINAL SECTION
ORIGINAL TERRAIN
SEALING SHOTCRETE
PROTECTION OF PORTAL PIT
BACK FILL
CONSTRUCTION CANOPY
DRAINAGE TRENCH
WALL FOUNDATION
8.60
0.50
0.50
0.50
-3.56
PORTAL STRUCTURE
WING WALL
0.40
2.10
BACK FILL
PORTAL STRUCTURE
DRAINAGE TRENCH
PORTAL WALL
+1.00
PLAN VIEW
+1.24
DRAWING No.:
DRAWING TITLE
QP10-Q-6410
SPRING LINE
-0.39
60" PIPE
WING WALL
-2.95
0.50
ENGINEER'S STAMP
TUNNEL DRAINAGE
CONTRACTOR'S STAMP
4.00
MIN. 3.0%
0.50
MIN. 3.0%
0.5
0
0.5
13.60
0
REV
JIRICNY
SABATA
25.03.2016
DESCRIPTION
DRAWN
CHECKED
DATE
WALL FOUNDATION
.50
12
.50
ARAFAT - TAIF
WATER TRANSMISSION SYSTEM
17
2016 i:\atibk_projects\h140\6_cae\66_split of tender\2. arafat - taif wts\dwg\6. pipeline tunnel\andere\qp10-q-6413-000 pipeline tunnel - west portal structure.dwg
REFERENCE DRAWINGS
1.5
0
LOCATION:
DRAWING TITLE:
M 1 : 100
DRAWING No.:
SCALE:
5m
5m
10m
PIPELINE TUNNEL
WEST PORTAL STRUCTURE
MAKKAH
1:100
QP10-Q-6413
SHEET
REV.