DEC. 2016
Item
Description
Unit
Quantity
Unit Rate
Materials
Labor
Others
Total
Amount
CONCRETE
LEAN CONCRETE
Supply and installation of lean concrete
including hoisting, placing, fixing, usage of
necessary tools and equipment, as described
on plans and specifications
(Note: Cement - Owner Supplied Material)
to Hotel Block B
m3
67.59
4,140.00
848.00
4,988.00
337,138.92
to Hotel Block C
m3
38.41
4,140.00
848.00
4,988.00
191,564.14
to Hotel Block D
m3
28.46
4,140.00
848.00
4,988.00
141,981.92
To Collection Php
670,684.98
Prepared by:
_________________________
Engr. Jeyvie Odiame
Asst. Cost & Planning Engr.