DIVISION 15
GENERAL PROVISION
SECTION 15010
-----------------------------------------------------------------------------------------------------------------------------------------
PART 1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.26
GENERAL
General Requirements
Application
Scope of Work
Quality Assurance
Submittals
Work Included
Design Criteria
Permits, Fees and Inspection
Related Work Specified in Other Divisions
Product Delivery Handling, Storage & Installation
Clearance From Electrical Equipment
Contract Drawings and Site Examination
Construction Drawings
Standard of Material & Equipment
Temporary Service
Patents
Equipment Nameplates
Expediting of Equipment
Superintendence
Trial Usage
Cleaning
Warranties
Instructions to the Employer
Testing
Commissioning
System Acceptance
Section 15010
PART 1
1.1
GENERAL REQUIREMENTS
.1
.2
1.2
Conditions of Contract.
.2
Instructions to Tenderers.
.3
Form of Agreement.
.4
.5
Form of Tender.
.6
Appendices.
.7
Applicable Divisions.
It is the Contractors responsibility to be fully aware of and comply with all of the
requirements of the above listed documents, and further assure that all
Subcontractors are equally informed.
APPLICATION
.1
1.3
GENERAL
SCOPE OF WORK
.1
This section establishes the requirements for completing all air conditioning,
ventilation, mechanical services, fire protection, plumbing and drainage systems
including but not limited to the following items. Refer to contract documents for
locations and details.
.2
.3
.4
A complete automatic electronic direct digital control system for air conditioning,
ventilation, plumbing and fire protection systems.
Section 15010
1.4
.5
Complete toilet, kitchen, miscellaneous, servery & tea room and smoke exhaust
systems including: Fan units; duct systems; filters; registers; grilles; diffusers
and all accessories.
.6
A complete sanitary and rain water drainage system including all final
connections to plumbing fixtures and floor trenches, and rainwater collection
points.
.7
.8
.9
.10
All vibration isolation components for each piece of rotating equipment including
necessary seismic restraining devices such as snubbers and sway bracing of
pipework.
.11
.12
Provide LPG bulk storage tanks, all above ground and below ground pipe work,
regulators, gas detector system, sprinkler system including all safety features to
Civil Defence approval, for kitchen and laboratories.
.13
QUALITY ASSURANCE
.1
The manufacturer's of all materials and equipment must have at least ten years
of experience in the design and manufacture of their products.
Section 15010
1.5
SUBMITTALS
.1
.2
.2
.3
.4
.5
.3
.4
.5
.6
.7
Reports of optional factory witness tests as called for in each section and
requested by the Engineer.
.8
.9
.10
Warranties.
.11
Record Drawings.
.12
.13
.14
.15
1.6
1.7
WORK INCLUDED
.1
.2
The work shall include all labour, materials, equipment, permits and tools
required for a complete and working installation as described but not
necessarily limited to the items in Division 15.
DESIGN CRITERIA
- 46oC db 29.4oC wb.
not applicable
.1
External Condition
: Summer
Winter
.2
Internal Conditions
:
: Mall areas
Plant Rooms
HV+LV Switch
Rooms
: Restaurant
.4
Noise Levels
.6
23oC 1oC
26oC 2oC
26oC 2oC
50% 10%
23oC 2oC
50% 10%
Thermal heat gains to the chilled water pipework is offset by maintaining the
chilled water supply temperature leaving air cooled chillers at 5.6oC as
compared to on coil temperature as 6.0oC for AHUs. Similarly, the AHU off coil
temperature (chilled water) shall be 13oC as compared to plant return
temperature of 13.3oC.
.7
Infiltration
All air conditioned spaces.
Summer
Winter
The building (with exception of toilets and kitchens) shall be generally positively
pressurised with respect to outdoor to avoid dust ingress and infiltration
1.8
Apply for, obtain, and pay for all permits, licenses, inspections, examinations,
and fees required for work of Division 15.
.2
Section 15010
1.9
The installation of fire protection, domestic water and drainage systems must be
carried out to the construction standards established by authorities having
jurisdiction. In no instance should the contractor reduce the standards or scope
of work established by the contract drawings and specifications.
.2
Access doors.
.3
.4
.5
.6
.7
Door louvers.
.8
Undercutting doors.
.9
.10
.11
Flashing.
.12
Gratings.
.13
Electrical Service.
.14
.15
Clean-up.
.16
Painting.
.17
Site Drainage.
.18
Site Utilities.
.19
See Architectural
Section 15010
1.10
.2
Moving of Equipment
.1
Ensure that materials and equipment are delivered to the site at the
proper time and in such assemblies and sizes so as to enter into the
building and to be moved into the spaces where they are to be located
without difficulty.
.2
Storage
.1
.3
1.11
Accessibility
.1
.2
.3
.4
Piping and ductwork shall not pass through the following locations:
.1
.2
.3
.4
.5
.6
.2
.3
Switchboards.
Motor control centers.
Motors, except for branch piping to equipment.
Electrical panels and busway.
When over or within 1.6m (5 ft) is unavoidable provide drip pans under
piping, subject to the approval of the Engineer.
Section 15010
1.12
1.13
.4
Work within these areas to be closely co-ordinated with Division 16 Electrical to avoid the use of drip pans.
.5
.2
.3
Watertight.
.4
Provide 30mm (1-1/4 in.) drain outlet piped to hub floor drain or
janitors sink.
.2
.3
.4
Visit and inspect the site of the work to verify location and elevation of existing
services which may affect the Tender and work of this Division including water,
electrical, sanitary, and storm water mains before submission of tender and
before proceeding with the work.
CONSTRUCTION DRAWINGS
.1
The Contractor shall prepare and submit to the Engineer for approval a
dimensioned layout with required sections of all ductwork and piping for each
floor. These drawings to be used as a co-ordination drawing and be distributed
to all Divisions whose work is affected. Drawings shall be in a larger scale,
usually 1:20 and shall include all duct sections as per planned fabrication, all
pipe and conduit fittings, valves etc., with all dimensions for erection.
.2
In addition to the above layouts and sections prepare drawings indicating sizes
and locations of special details including but not limited to:
Sleeves and openings,
inserts and anchors,
access panel openings,
pits,
Section 15010
1.15
1.16
.2
.3
.4
Assume full responsibility for ensuring that when providing other acceptable
alternative manufacturers all space, weight, connections, power and wiring
requirements, etc. are considered, and costs therefore included in the tender.
Equipment requiring greater than specified energy requirements or unduly
limiting service space requirements will not be accepted.
TEMPORARY SERVICE
.1
.2
.3
The use of permanent facilities for temporary construction service will not affect
in any way the commencement day of the warranty period.
PATENTS
.1
1.17
Pay all royalties and licence fees, and defend all suits or claims for infringement
of any patent rights or copy rights, and save the Employer, Engineer and
Architect harmless of loss or annoyance on account of suit, or claims of any
kind of violation or infringement of any letters patent, patent rights or copy
rights, by this Contractor or anyone directly or indirectly employed by him or by
reason of the use by him or them of any part, machine, manufacture or
composition of matter on the work, in violation or infringement or such letters
patent or rights or copy rights.
EQUIPMENT NAMEPLATES
.1
.2
1.18
1.19
1.20
1.21
1.22
EXPEDITING OF EQUIPMENT
.1
If
.2
Continuously check and expedite the flow of necessary information to and from
all parties involved.
.3
.4
SUPERINTENDENCE
.1
Maintain at the job site, at all times, qualified personnel and supporting staff with
proven experience in erecting, supervising, testing and adjusting mechanical
projects of comparable nature and complexity.
.2
The Contractors site supervisory personnel and their qualifications are subject
to the approval of the Employer and the Engineer.
TRIAL USAGE
.1
The Employer has the privilege of trial usage of Mechanical Systems or parts
thereof for the purpose of testing and learning operational procedures.
.2
Carry out trial usage over a maximum period of time as instructed by the
Engineer.
.3
Carry out the operations only with the express knowledge and under
supervision of the trade specialist who shall not waive any responsibility
because of trail usage.
.4
CLEANING
.1
Vacuum clean and remove debris from the inside of water reservoirs, tanks, air
handling systems, fans, ducts, coils, terminal units, etc., before testing and
operational start-up.
.2
.3
Comb all bent fins to proper configuration on all coils of air handling units, fan
coil units, and air cooled condensers.
WARRANTIES
.1
1.23
.2
.3
.4
.5
The Warranties shall include free preventive maintenance, defects and liability
during the above-mentioned period.
.2
Item
.1
.2
.3
.4
.5
.6
.3
Refer to
Section
15500
15700
15900
15950
15500
15425
Submit to the Engineer at the time of final inspection a complete list of systems
stating for each system:
.1
.2
Duration of instruction.
.3
.4
.4
Signature of the Employer's staff stating that they properly understand the
system installation, operation and maintenance requirements.
.5
Employer's Written Acceptance: The Contractor shall submit for approval three
copies of the following written acceptance by the Employer acknowledging the
Contractor's instruction of the Employer's Representative.
Section 15010
1.24
TESTING
.1
General
.1
Furnish all labour, material, instruments, supplies and services and bear
all costs for the accomplishment of the test as listed, but not limited to
the following and detailed in relevant Sections of the Specifications.
Correct all defects appearing under tests and repeat the tests until no
defects are disclosed; leave the equipment clean and ready for use.
Item
.1
.2
.3
.4
.5
.6
.7
.8
.9
.10
.11
.12
.13
.14
.15
.16
.17
.18
.19
.20
.21
Refer to
Section
15100
15150
15180
15400
15400
15460
15500
15700
15850
15850
15850
15850
15850
15850
15850
15850
15850
15850
15900/15950
15400
15425
.2
.3
.4
.5
Make tests of piping and ducts necessary during the progress of the
work. No work and equipment shall be insulated or concealed until it is
Section 15010
successfully tested.
.2
.6
.7
Carry out final tests at a time suitable to and in the presence of the
Employer and the Engineer.
.8
.2
.3
.3
.4
Where the Contract calls for optional witness tests on the premises of
the manufacturer, the manufacturer shall provide labour, materials,
electricity, water, fuel, stores, apparatus and instruments as may be
required and as may be reasonably demanded to carry out such tests.
.5
.6
The Contractor shall pay for all costs incurred in travelling, and
expenses to witness all the above tests.
.7
After completion of all electrical power and control wiring the Contractor
Section 15010
1.25
.1
.2
COMMISSIONING
.1
.2
.3
.4
General
.1
.2
All systems are to be released to the Engineer certified ready for use
and working in a satisfactory manner to meet the performance
requirements of the Specifications.
.3
All floor traps and traps of plumbing fixtures must be filled with water to
prevent the escape of sewer gases.
.4
All pump sumps are to be filled with water to the minimum level.
.5
.2
.3
Safety valves and pressure reducing valves shall all be set to correct
operating pressures. Fire pumps shall be ready to operate via pressure
switch control, and the jockey pump shall be operational maintaining
design static pressure in pipe systems. All normally open gate valves in
the system shall be opened with valves in bypass lines completely
closed.
.2
.3
All chilled water piping to be flushed clean, degreased and filled with
Section 15010
.5
1.26
.2
.3
.4
Built fuel oil storage to be filled with No.2 diesel fuel oil.
.2
.3
.4
.5
All gate valves in the systems to be left in open position except for drains
and bypass valves.
SYSTEM ACCEPTANCE
.1
Submit original copies of letters from the manufacturers of all systems indicating
that their technical representatives have inspected and tested the respective
systems and are satisfied with the method of installation, connection and
operation.
.2
These letters shall state the names of persons present at testing, the methods
used, and a list of functions performed with location and room numbers where
applicable.
.3
END OF SECTION
Section 15010