other chemicals are handled or toxic chemicals may be present. Safety Shower & Eye
wash units shall meet the requirements of IS: 10592. No. of SS & EW to be provided
for units shall be as per process hazard/safety requirements. Water shall be fed from
drinking water line. If drinking water lines are laid Above Ground (A/G), the same shall
be insulated in such a way that temperature of water shall not exceed 250C. Any
boosting pump required to enhance the drinking water pressure is in Contractors
scope. Discharge from safety shower & eye wash shall be connected to neutralization
pit. Battery waste discharge from building (Control room cum sub-station) and
discharge from EWSS (safety shower & eye wash) is to be connected to Neutralisation
pits by Package contractor with HDPE pipe (refer 7-65-0310). Further, from
Neutralisation pit outlet to storm water drain through RCC pipe. HDPE pipe,
Neutralisation pit, RCC pipe is all in the scope of Package contractor.
2.9