PT.

MITRA BINTANG INDONESIA


Department

Area
Activity

Personnel
participated &
consulted:
Name

Preliminaries Works - Site Clearing

Doc No.

OSH TASK RISK ASSESSMENT


Assessors name

Ref Code / Rev

Prepared by:

1)
2)
3)

Reviewed by:

Name:
Signature:
Date:

Name:
Signature:
Date:

dentification

No.

Control

Sub-Activity

Condition of
assessment

Hazards

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

C, PC, NC

Body injuries / fatality

Enggineering & Admin.


Control - Safety awareness
-Barrier, Traffic
Control, Training, Briefing &
Monitoring

Potential contact with


underground power line

Body injuries / fatality

Enggineering, Admin.
Control & PPE - Safety
awareness
-Isolation, Briefing, Monitoring
and appropriate PPE

Exposure to noise

Chronic hearing
problem

Admin. Control & PPE Safety awareness


-Ear plug/muff &
initial noise monitoring

Enggineering & Admin.


Control - Safety awareness
-Face mask,
Chronic health problem
Servicing, Toolbox Talk,
Monitoring

Struck /crushed by
machine/Collision

Approved by:

Name:
Signature:
Date:

Excavation Of Earth (Excavator, Back Hoe and


Dump Truck)

R/W

Inhalation of heavy smoke /


exhaust fume

Eliminationcontrol

Pest

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide Barricade to Excavate Area.
4.
Appoint a Traffic Controller.

12

II

1. All workers must be inducted before commencing work.


2. All
workers must use proper P.P.E
3. To provide
competent super visor to supervise the activity full time.
4. To organize Tool Box
talk/meeting every time want to start work.
5. To provide Clearance Marking as per
TNB requirement.

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E
3.
To provide competent super visor to supervise the activity full time.
4. To
organize Tool Box talk/meeting every time want to start work.

1. All workers must used proper PPE at work site.


2.
Un-good condition of machinery need to be check and repair as
posible.
3.
Toolbox Talk before start work.

1. Appoint pest control to clear all insect/ mosquito as shown in


Prevention And Control Of Infectious Diseases Act and Regulation

1. Provide water sprinkler/ browser to prevent flying dust.


supply face mask to worker which involved

Mosquito/ insect bites

Dengue/ skin
rash/dermatitis

Inhalation of dust

Irritation of respiratory
tract

Engineering, admin control


& PPE Water
sprinkling/Browser, Dust
mask and training

Slippery & poor


access/egress

Slip, trip & fall - body


injuries

Engineering, Admin Control


Provided proper
access/egress,
training/information

Operation in unsafe mode

Body injuries / fatality

Admin. Control work practice

1. Stop work.
2.Terminate if necessary

Heat stress

Fatigue/ skin rash

12

II

1. Provive Shelter for workers cooling body from direct sun. 2. Brief
workers to drink a lot of plain water.
3.
Advise workers to use a appropriate cloth due to hot weather.

Exposure to welding fume

Irritation of respiratory
tract

Admin control & PPE


Training, Briefing &
Face mask

Exposed to UV & IR ray

permanent eye damage

Admin control & PPE


Training, Briefing &
Face Shield

Exposure to welding spark

Skin burn

Safe

Engineering, admin control


& PPE Shelter,
Briefing & Protective clothing

Admin control & PPE


Training, Briefing, Protective
clothing,
hand glove &
face shield

2.

dentification

No.

Control

Sub-Activity

Condition of
assessment

Hazards

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

C, PC, NC

Installation of Hoarding (Welding Set, Power Tool/Drill)

Silt Trap/Wash Trough 3 (Excavator, Back Hoe, Welding


Set, Cutting Machine/grinder)

Significant
Hazard?
(Y/N)

Risk
Rating

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)
1. Only the competent permitted to carrying out work.
2.
PPE equipment that suitable to be used while working.
3.
Supervise and provide briefing before start work.
4.
Obtain Working Permit from MCB.
5. All
workers must be inducted before commencing of work. 6. All
workers must be briefing before start work.

Electrocution

Fatality /body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

Exposure to sharp object

Hand Injuries

Engineering, admin control


& PPE Guarded,
briefing and Protective
clothing

Flying of particles

Eye or body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

Heat stress

Fatigue

Engineering, admin control


& PPE Shelter,
Briefing & Protective clothing

12

II

1. Provive Shelter for workers cooling body from direct sun. 2. Brief
workers to drink a lot of plain water.
3.
Advise workers to use a appropriate cloth due to hot weather.

Mosquito/ insect bites

Dengue/ skin
rash/dermatitis

Eliminationcontrol

1. Appoint pest control to clear all insect/ mosquito as shown in


Prevention And Control Of Infectious Diseases Act and Regulation

Struck /crushed by
machine/Collision

Body injuries / fatality

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide Barricade to Excavate Area.
4.
Appoint a Traffic Controller.

Mosquito/ insect bites

Dengue/ skin
rash/dermatitis

1. Appoint pest control to clear all insect/ mosquito as shown in


Prevention And Control Of Infectious Diseases Act and Regulation

Inhalation of dust/Concrette
Dust

Irritation of respiratory
tract

Engineering, admin control


& PPE Water
sprinkling/Browser, Dust
mask and training

1. Provide water sprinkler/ browser to prevent flying dust.


supply face mask to worker which involved

Potential contact with


underground power line

Body injuries / fatality

Enggineering, Admin.
Control & PPE - Safety
awareness
-Isolation, Briefing, Monitoring
and appropriate PPE

12

II

1. All workers must be inducted before commencing work.


2. All
workers must use proper P.P.E
3. To provide
competent super visor to supervise the activity full time.
4. To organize Tool Box
talk/meeting every time want to start work.
5. To provide Clearance Marking as
per TNB requirement. 6. Permit To Work.

Fall into excavated trench

Body injuries

Engineering,Admin controlGuardrail/Barrier, monitoring

Inhalation of dust

Irritation of respiratory
tract

Engineering, admin control


& PPE Water
sprinkling/Browser, Dust
mask and training

1. Provide water sprinkler/ browser to prevent flying dust.


supply face mask to worker which involved

Electrocution

Fatality /body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

1. Only the competent permitted to carrying out work.


2.
PPE equipment that suitable to be used while working.
3.
Supervise and provide briefing before start work.
4.
Obtain Working Permit from MCB.
5. All
workers must be inducted before commencing of work. 6. All
workers must be briefing before start work.

Heat stress

Fatigue

Engineering, admin control


& PPE Shelter,
Briefing & Protective clothing

12

II

NR/W

NR/W

Pest

Enggineering & Admin.


Control - Safety awareness
-Barrier, Traffic
Control, Training, Briefing &
Monitoring

Eliminationcontrol

Pest

1. All moving part of the machine must be fully guarded.


2.
All workers must be inducted before commencing of work. 3. All
workers must be briefing before start work.
4. Proper
PPE must be worn while working.
5. Provide
training to workers which involved.

2.

2.

dentification

No.

Control

Sub-Activity

Condition of
assessment

Hazards

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

12

C, PC, NC

Struck /crushed by
machine/Collision

Potential contact with


underground power line

Inhalation of heavy smoke /


exhaust fume

Stream Diversion 4 (Excavator, Back Hoe, Welding


Set & Cutting Machine)

Body injuries / fatality

Enggineering & Admin.


Control - Safety awareness
-Barrier, Traffic
Control, Training, Briefing &
Monitoring

Body injuries / fatality

Enggineering, Admin.
Control & PPE - Safety
awareness
-Isolation, Briefing, Monitoring
and appropriate PPE

Enggineering & Admin.


Control - Safety awareness
-Face mask,
Chronic health problem
Servicing, Toolbox Talk,
Monitoring

Manual handling

Sprains, strains &


backache

Exposure to welding fume

Irritation of respiratory
tract

Operation in unsafe mode

Body injuries / fatality

Heat stress

Fatigue/ skin rash

R/W

Confined Space

Admin. Control safe


lifting procedure
Admin control & PPE
Training, Briefing &
Face mask
Admin. Control work practice

Safe

Engineering, admin control


& PPE Shelter,
Briefing & Protective clothing

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide Barricade to Excavate Area.
4.
Appoint a Traffic Controller.

12

II

1. All workers must be inducted before commencing work.


2. All
workers must use proper P.P.E
3. To provide
competent super visor to supervise the activity full time.
4. To organize Tool Box
talk/meeting every time want to start work.
5. To provide Clearance Marking as
per TNB requirement. 6. Permit To Work.

1. All workers must used proper PPE at work site.


2.
Un-good condition of machinery need to be check and repair as
posible.
3.
Toolbox Talk before start work.

1. Stop work.
2.Terminate if necessary

12

II

1. Provive Shelter for workers cooling body from direct sun. 2. Brief
workers to drink a lot of plain water.
3.
Advise workers to use a appropriate cloth due to hot weather.

Detail Requirement:
1. Permit
System. 2. Permit to Work. 3. Isolation Requirement. 4.Requirement
to Ensure Safety of Atmosphere. 5. Entry Into Hazardous
Atmosphere.
6. Rescue and Emergency Services.
7.Health Requirements of Person Working in Confined Space. 8.
Training.
9. Additional Precautions During Occupancy of
Confined Space. 10. Record Keeping.

Engineering, admin control


Harzadous Atmosphere & PPE Guidelines in
Industrial Code Of Practice
2010 (ICOP)

12

II

Fall into excavated trench

Body injuries

Engineering,Admin controlGuardrail/Barrier, monitoring

Soil collapse into


trench/Cave in

Body injuries / fatality

Engineering controlShoring/ safe work practice,


Supervising

12

II

Exposed to UV & IR ray

Permanent eye damage

Exposure to welding spark

Skin burn

Admin control & PPE


Training, Briefing &
Face Shield
Admin control & PPE
Training, Briefing, Protective
clothing,
hand glove &
face shield

1. Permit To Work Required before excavation.


Supervise at all potential area in full time.
Briefing/Toolbox Talk before start work.
Training.

2.
3.
4.

dentification

No.

Control

Sub-Activity

Condition of
assessment

Hazards

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

12

C, PC, NC

Earth Work - (Excavator, Back


Hoe, Back Pusher, Roller
Compactor, Dump Truck)

1. Permit to Work Required for Hot Job.


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
4. Competent/Training.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide Barricade to Excavate Area.
4.
Appoint a Traffic Controller.

12

II

1. All workers must be inducted before commencing work.


2. All
workers must use proper P.P.E
3. To provide
competent super visor to supervise the activity full time.
4. To organize Tool Box
talk/meeting every time want to start work.
5. To provide Clearance Marking as
per TNB requirement. 6. Permit To Work.

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E
3.
To provide competent super visor to supervise the activity full time.
4. To
organize Tool Box talk/meeting every time want to start work.

1. All workers must used proper PPE at work site.


2.
Un-good condition of machinery need to be check and repair as
posible.
3.
Toolbox Talk before start work.

1. Provide water sprinkler/ browser to prevent flying dust.


supply face mask to worker which involved

1. Stop work.
2.Terminate if necessary

12

II

1. Provive Shelter for workers cooling body from direct sun. 2. Brief
workers to drink a lot of plain water.
3.
Advise workers to use a appropriate cloth due to hot weather.

Admin control & PPE


Training, Briefing, Protective
clothing,
hand glove &
face shield

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

12

II

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

Body injuries / fatality

Enggineering & Admin.


Control - Safety awareness
-Barrier, Traffic
Control, Training, Briefing &
Monitoring

Potential contact with


underground power line

Body injuries / fatality

Enggineering, Admin.
Control & PPE - Safety
awareness
-Isolation, Briefing, Monitoring
and appropriate PPE

Exposure to noise

Chronic hearing
problem

Admin. Control & PPE Safety awareness


-Ear plug/muff &
initial noise monitoring

Inhalation of heavy smoke /


exhaust fume

Chronic health problem

Enggineering & Admin.


Control - Safety awareness
-Face mask,
Servicing, Toolbox Talk,
Monitoring

Inhalation of dust/Concrette
Dust

Irritation of respiratory
tract

Engineering, admin control


& PPE Water
sprinkling/Browser, Dust
mask and training

Operation in unsafe mode

Body injuries / fatality

Admin. Control work practice

Heat stress

Fatigue/ skin rash

Engineering, admin control


& PPE Shelter,
Briefing & Protective clothing

Slippery & poor


access/egress

Slip, trip & fall - body


injuries

Engineering, Admin Control


Provided proper
access/egress,
training/information

Exposed to UV & IR ray

permanent eye damage

Exposure to welding spark

Skin burn

Electrocution

Fatality /body injuries

Struck /crushed by
machine/Collision

II

Fatality /body injuries

Electrocution

R/W

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

Safe

Admin control & PPE


Training, Briefing &
Face Shield

1. Permit to Work Required for Hot Job.


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
4. Kompetent/Training.

2.

dentification

No.

Control

Sub-Activity

Condition of
assessment

Hazards

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

C, PC, NC

Exposure to welding fume

Confined Space

Box Culvert and Sump (Excavator/Back Hoe, Mobile


Crane, Hacker, Oxy-Cutting,
Cutting Machine/Grinder)

Irritation of respiratory
tract

Admin control & PPE


Training, Briefing &
Face mask

Engineering, admin control


Harzadous Atmosphere & PPE Guidelines in
Industrial Code Of Practice
2010 (ICOP)

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

12

II

Detail Requirement:
1. Permit
System. 2. Permit to Work. 3. Isolation Requirement. 4.Requirement
to Ensure Safety of Atmosphere. 5. Entry Into Hazardous
Atmosphere.
6. Rescue and Emergency Services.
7.Health Requirements of Person Working in Confined Space. 8.
Training.
9. Additional Precautions During Occupancy of
Confined Space. 10. Record Keeping.

Minor fire accident/ Contact


with Hot Part

Skin burn

Admin Control & PPE Briefing,Protective clothing,


hand glove & face shield

12

II

1. Permit To Work Required for Hot Job.


2. Flashback Arrestor is compulsory.
3. Briefing/Toolbox Talk before start work.
Competent/Training.

Leakage of oxy-acetylene
hose- fire or explosion

Fatality /body injuries

Engineering & Admin.


Control - Flash Back
Arrestor, Training, Briefing &
Hot work permit

1. Permit Ro Work Required for Hot Job.


2. Flashback Arrestor is compulsory.
3. Briefing/Toolbox Talk before start work.
Competent/Training.

Inhalation of dust/Concrette
Dust

Irritation of respiratory
tract

Engineering, admin control


& PPE Water
sprinkling/Browser, Dust
mask and training

1. Provide water sprinkler/ browser to prevent flying dust.


supply face mask to worker which involved

Flying of particles

Eye or body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

Body vibration

Body injuries

Admin. Control Training, Briefing, Job


Rotation & Safe work practice

Ergonomic- awkward position


& repetitive motion

Body strain

Admin. Control Training, Briefing, Job


Rotation & Safe work practice

Exposure to noise

Chronic hearing
problem

Admin. Control & PPE Safety awareness


-Ear plug/muff &
initial noise monitoring

Hand-arm vibration

Carpal tunnel syndrome

Admin. Control Training, Briefing, Job


Rotation & Safe work practice

Exposure to sharp object

Hand Injuries

Engineering, admin control


& PPE Guarded,
briefing and Protective
clothing

1. All moving part of the machine must be fully guarded.


2.
All workers must be inducted before commencing of work. 3. All
workers must be briefing before start work.
4. Proper
PPE must be worn while working.
5. Provide
training to workers which involved.

Falling of materials

Fatality /body injuries

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

12

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide Barricade to Excavate Area.
4.
Appoint a signalman with a good communication to operator.

R/W

4.

4.

2.

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E
3.
To provide competent super visor to supervise the activity full time.
4. To
organize Tool Box talk/meeting every time want to start work.

dentification

No.

Control

Sub-Activity

Condition of
assessment

Hazards

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

C, PC, NC

Fatality /body injuries

Admin. Control - Safe


working load/procedure

Slippery & poor


access/egress

Slip, trip & fall - body


injuries

Engineering, Admin Control


Provided proper
access/egress,
training/information

Operation of Power Tools

Hand injuries/Body
Injury

Engin. & Admin control Mechanical guard, Safe Work


Practice training & Briefing

Heat stress

Fatigue/ skin rash

Engineering, admin control


& PPE Shelter,
Briefing & Protective clothing

Soil collapse into


trench/Cave in

Body injuries / fatality

Engineering controlShoring/ safe work practice,


Supervising

12

II

Flying of particles

Eye or body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

Inhalation of dust/Concrette
Dust

Irritation of respiratory
tract

Engineering, admin control


& PPE Water
sprinkling/Browser, Dust
mask and training

Minor fire accident/


Contact with Hot Part

Skin burn

Admin Control & PPE Briefing,Protective clothing,


hand glove & face shield

Hand Injuries

Engineering, admin control


& PPE Guarded,
briefing and Protective
clothing

Body injuries

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

Falling of material

R/W

Risk
Rating

Toppling of crane

Exposure to sharp object

Piling Works - (Jack-In


Machine, Mobile Crane,
Welding Set, Generator, Drop
Hammer)

Significant
Hazard?
(Y/N)

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

Toppling of crane

Body injuries / fatality

Operation in unsafe mode

Body injuries / fatality

Admin. Control - Safe


working load/procedure

Admin. Control work practice

Safe

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Competent/license operator only can operate machine
4. Appoint a signalman with a good communication to
operator.
5. Supervise by the experience person.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. Training
workers only can operate machine.
4.
Supervise by the experience person.

1. Permit To Work Required before excavation.


Supervise at all potential area in full time.
Briefing/Toolbox Talk before start work.
Training.

2.
3.
4.

1. Permit To Work Required before excavation.


Supervise at all potential area in full time.
Briefing/Toolbox Talk before start work.
Training.

2.
3.
4.

1. All moving part of the machine must be fully guarded.


2.
All workers must be inducted before commencing of work. 3. All
workers must be briefing before start work.
4. Proper
PPE must be worn while working.
5. Provide
training to workers which involved.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide Barricade to Excavate Area.
4.
Appoint a signalman with a good communication to license machine
operator.

12

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Competent/license operator only can operate machine
4. Appoint a signalman with a good communication to
operator.
5. Supervise by the experience person.

1. Stop work.
2.Terminate if necessary

dentification

No.
7

Control

Sub-Activity
Piling Works - (Jack-In
Machine, Mobile Crane,
Welding Set, Generator, Drop
Hammer)

Load Test - (Mobile Crane,


Jack-In Machine)

Condition of
assessment

Hazards

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

C, PC, NC
R/W

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

Exposure to noise

Chronic hearing
problem

Admin. Control & PPE Safety awareness


-Ear plug/muff &
initial noise monitoring

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E
3.
To provide competent super visor to supervise the activity full time.
4. To
organize Tool Box talk/meeting every time want to start work.

Electrocution

Fatality /body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

12

II

1. Permit Ro Work Required for Hot Job.


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
4. Kompetent/Training.

Heat stress

Fatigue/ skin rash

Engineering, admin control


& PPE Shelter,
Briefing & Protective clothing

Heat stress

Fatigue/ skin rash

Engineering, admin control


& PPE Shelter,
Briefing & Protective clothing

Body injuries / fatality

Enggineering & Admin.


Control - Safety awareness
-Barrier, Traffic
Control, Training, Briefing &
Monitoring

NR/W
Struck /crushed by
machine/Collision

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide Barricade to Excavate Area.
4.
Appoint a Traffic Controller.

PT. MITRA BINTANG INDONESIA


Department

Area
Activity

PROJECT

Personnel
participated &
consulted:
Name

Building Works

Doc No.

OSH TASK RISK ASSESSMENT


Assessors name

Ref Code / Rev

Prepared by:

1)
2)
3)

Reviewed by:

Name:
Signature:
Date:

Name:
Signature:
Date:

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

C, PC, NC

Scaffolding

Approved by:

Name:
Signature:
Date:

Significant
Hazard?
(Y/N)

Risk
Rating

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)
1. Erected by competent/training person only.
2. PE Design required for any scaffold erected more than 15
meters.
3. Inspection and supervising of competent person every
time before its to be used.
4. Record keeping.
5. Ensure the material is in good
condition/serviceable
1. Erected by competent/training person only.
2. Safety Harness/belt, lifelines & necessary precaution.
3.
Briefing/toolbox talk before commencing work.
4.
Supervise by competent person.
5.
Safe Work Practice.

Collapse of Structure

Body injuries / fatality

Enggin. & Admin. Control Safety awareness,


Competent, PE Design,
Training, Briefing & Monitoring

12

II

Falling from Height

Body injuries / fatality

Engin. & Admin Control Walking Platform, Safety


Harness /belt, Training &
Briefing

12

II

Falling of construction
material from height

Fatality /body injuries

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

12

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide Toe Board to Open Edge.
4.
Barrier working area to prevent any invasion.
5. Monitoring of work and working area.

Slippery & poor


access/egress

Slip, trip & fall - body


injuries

Engineering, Admin Control Provided proper


access/egress,
training/information

1. Ensure all workers aware about a safe work practice &


procedure. 2. Briefing before start work. 3. immediately replace
unserviceable or damage equipment. 4. safety belt or lifelines
required for working at height

Lightning

Body injuries / fatality

Admin Control Safe


work practice & Briefing.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. Stop
work immediatly.

Electrocution

Fatality /body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

1. Electrical Hand Tool must be in good condition.


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
4. Competent/Training.
1. Scaffold must be check and assessed every week and after
heavy rain or wind, (Refer Checklist)
2.
Record keeping.
3. Immediate action fo any consequences to the
structure or scaffold condition.
4. PE Design Required for scaffold erected 15 meter
and above

NR/W

Wind/Rain

Structure Collapse/
disturbed/budge

Heat Stress

Fatigue

Engineering, admin control &


PPE Shelter, Briefing &
Protective clothing

Body injuries / fatality

Enggin. & Admin. Control Safety awareness,


Competent, PE Design,
Training, Briefing & Monitoring

Body injuries / fatality

Engin. & Admin Control Walking Platform, Safety


Harness /belt, Training &
Briefing

Collapse

Falling from Height

Admin. Control work practice

Safe

12

II

12

12

II

1. Erected by competent/training person only.


2. PE Design required for any scaffold erected more than 15
meters.
3. Inspection and supervising of competent person every
time before its to be used.
4. Record keeping.
5. Ensure the material is in good
condition/serviceable

II

1. Erected by competent/training person only.


2. Safety Harness/belt, lifelines & necessary precaution.
3.
Briefing/toolbox talk before commencing work.
4.
Supervise by competent person.
Safe Work Practice.

5.

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

C, PC, NC

Working Platform

NR/W

Ladder

Concrette Mixer

NR/W

Risk
Rating

Fatality /body injuries

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

12

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide Toe Board to Open Edge.
4.
Barrier working area to prevent any invasion.
5. Monitoring of work and working area.

Slippery & poor


access/egress

Slip, trip & fall - body


injuries

Engineering, Admin Control Provided proper


access/egress,
training/information

1. Ensure all workers aware about a safe work practice &


procedure. 2. Briefing before start work. 3. immediately replace
unserviceable or damage equipment. 4. safety belt or lifelines
required for working at height

Lightning

Body injuries / fatality

Admin Control Safe


work practice & Briefing.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. Stop
work immediatly.

Electrocution

Fatality /body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

1. Electrical Hand Tool must be in good condition.


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
4. Competent/Training.

Wind/Rain

Structure Collapse/
disturbed/budge

Admin. Control work practice

12

II

1. Scaffold must be check and assessed condition every week and


after heavy rain or wind, (Refer Checklist)
2. Record keeping.
3. Immediate action for any consequences to the
structure or scaffold condition.

Heat Stress

Fatigue

Engineering, admin control &


PPE Shelter, Briefing &
Protective clothing

Body injuries / fatality

Enggin. & Admin. Control Safety awareness,


Competent, PE Design,
Training, Briefing & Monitoring

Falling from Height

Body injuries / fatality

Engin. & Admin Control Walking Platform, Safety


Harness /belt, Training &
Briefing

Slippery & poor


access/egress

Slip, trip & fall - body


injuries

Engineering, Admin Control Provided proper


access/egress,
training/information

Caught in moving parts of


machines

Body injuries

Engin, Admin Control & PPE Guard rail, Safe work practice,
Training & Briefing.

Ergonomic- awkward position


& repetitive motion

Body strain

Admin. Control Training, Briefing, Job Rotation


& Safe work practice

Falling of construction
material from height

Collapse of Structure

Significant
Hazard?
(Y/N)

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

R/W
Inhalation of heavy smoke /
exhaust fume

Safe

Enggineering & Admin.


Control - Safety awareness
Chronic health problem
-Face mask,
Servicing, Toolbox Talk,
Monitoring

1. Only a good condition of ladder allowed to be used.


2. Mantain of good keeping of ladder condition.
3. Immediate
change any damages with serviceable one.
4. Ensure the material is in
good condition/serviceable

12

II

1. Erected by competent/training person only.


2. Hard Barrier/Guard rail.
3. Briefing/toolbox talk before
commencing work.
4. Supervise by competent person.
5. Safe Work Practice.
6. Ensure the
material is in good condition/serviceable

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Guarding machine/moving part.

1. All workers must used proper PPE at work site.


2.
Un-good condition of machinery need to be check and repair as
posible.
3.
Briefing before start work.

Hazard Identification
4

Concrette Mixer

No.

Sub-Activity

R/W
Condition of
assessment

Hazards

Control
Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E
3.
To provide competent super visor to supervise the activity full time.
4.
Briefing before start work.

1. Electrical Hand Tool must be in good condition.


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
4. Competent/Training.

Enggineering & Admin.


Control - Safety awareness
Chronic health problem
-Face mask,
Servicing, Toolbox Talk,
Monitoring

1. All workers must used proper PPE at work site.


2.
Un-good condition of machinery need to be check and repair as
posible.
3.
Briefing before start work.

Enggineering & Admin.


Control - Safety awareness
-Barrier, Traffic
Control, Training, Briefing &
Monitoring

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.

Admin Control - Only machine


with fitness certified must be
used.

12

II

1. All Air compressor must have c ertificate of fitness from DOSH


and display at the compressor.
2. Maintenance and servicing as schedule.
3. Record Keeping.

Admin. Control & PPE Safety awareness


-Ear plug/muff &
initial noise monitoring

Consequences

Existing Control Measures


(ECM)

C, PC, NC

Exposure to noise

Chronic hearing problem

Electrocution

Fatality /body injuries

Inhalation of heavy smoke /


exhaust fume

Air Compressor

Generator

NR/W

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

Struck by pressure hoses

Body injuries

Unfit/ unsafe machine

Body injuries / fatality

Exposure to noise

Chronic hearing problem

Admin. Control & PPE Safety awareness


-Ear plug/muff &
initial noise monitoring

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

3.

4. Briefing before start work.

Electrocution

Fatality /body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

Exposed hot surface

Skin burn

Admin Control & PPE Briefing,Protective clothing,


hand glove & face shield

Inhalation of heavy smoke /


exhaust fume

Chronic health problem

Enggineering & Admin.


Control - Safety awareness
-Face mask,
Servicing, Toolbox Talk,
Monitoring

Exposure to noise

Chronic hearing problem

Admin. Control & PPE Safety awareness


-Ear plug/muff &
initial noise monitoring

Caught in moving parts of


machines

Body injuries / fatality

Engin, Admin Control & PPE Guard rail, Safe work practice,
Training & Briefing.

12

II

NR/W

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E
To provide competent super visor to supervise the activity.

12

II

1. General check before used and the machine must be in good


condition.
2. Monitoring and analyze the potential of hazard.
3. Monthly check/maintenance must in schedule.
4. Record Keeping.

1. Placement generator in open area and suitable.


2.
Un-good condition of machinery need to be check and repair as
posible.
3.
Maintenance must be done as schedule.
4. Record Keeping.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Guarding machine/moving part.

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Guarding machine/moving part.

Enggineering & Admin.


Control - Safety awareness
-Face mask,
Servicing, Toolbox Talk,
Monitoring

1. Placement machine in open area and suitable.


2. Un-good condition of machinery need to be check and repair as
posible.
3.
Maintenance must be done as schedule.

Admin. Control Training, Briefing, Job Rotation


& Safe work practice

Admin. Control & PPE Safety awareness


-Ear plug/muff &
initial noise monitoring

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Guarding machine/moving part.

1. All workers must used proper PPE at work site.


2.
Un-good condition of machinery need to be check and repair as
posible.
3.
Toolbox Talk before start work.
4. Place the machine in a good ventilation area.

Existing Control Measures


(ECM)

C, PC, NC

Operation of Power Tools

Bending Machine

Cutting Machine

R/W

Engin. & Admin control Hand injuries/Body Injury Mechanical guard, Safe Work
Practice training & Briefing

Inhalation of heavy smoke /


exhaust fume

Chronic health problem

Ergonomic- awkward position


& repetitive motion

Body strain

Exposure to noise

Chronic hearing problem

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

Operation of Power Tools

Engin. & Admin control Hand injuries/Body Injury Mechanical guard, Safe Work
Practice training & Briefing

Inhalation of heavy smoke /


exhaust fume

Enggineering & Admin.


Control - Safety awareness
Chronic health problem
-Face mask,
Servicing, Toolbox Talk,
Monitoring

Flying of particles and cutting


disc

Eye or body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

Inhalation of dust

Irritation of respiratory
tract

Engineering, admin control &


PPE Water
sprinkling/Browser, Dust mask
and training

Ergonomic- awkward position


& repetitive motion

Body strain

Admin. Control Training, Briefing, Job Rotation


& Safe work practice

R/W

Exposure to noise

Toppling

Admin. Control & PPE Safety awareness


Chronic hearing problem
-Ear plug/muff &
initial noise monitoring

Fatality /body injuries

Admin. Control - Safe working


load/procedure

1. Provide water sprinkler/ browser to prevent flying dust.


supply face mask to worker which involved

2.

1. All workers must used proper PPE at work site.


2.
Un-good condition of machinery need to be check and repair as
posible.
3.
Toolbox Talk before start work.
4. stationed machine in open area to prevent sound wave that
repeat

12

II

1. Operator must be inducted before commencing of work.


2.
Competent/license operator only can operate machine
3. Appoint a signalman with a good communication to
operator.
4. Supervise by the experience person.

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

12

C, PC, NC

Falling of materials

Mobile Crane

R/W

Excavator / Back Hoe

R/W

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. Avoid
to be under loading material.
4. Appoint a signalman with a good communication to operator.

1. Operator must be inducted before commencing of work.


2.
Competent/license operator only can operate machine
3. Appoint a signalman with a good communication to
operator.
4. Supervise by the experience person.

Body injuries / fatality

Enggineering & Admin.


Control - Safety awareness
-Barrier, Traffic
Control, Training, Briefing &
Monitoring

Electrocution (Working near


power sources)

Fatality /body injuries

Admin Control & PPE


-Briefing, monitoring, Safe
Work Practice, hand glove &
Safety Boot

12

II

Lightning

Body injuries / fatality

Admin Control Safe


work practice & Briefing.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. Stop
work immediatly.

Body injuries / fatality

Enggineering & Admin.


Control - Safety awareness
-Barrier, Traffic
Control, Training, Briefing &
Monitoring

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide Barricade to Excavate Area.
4.
Appoint a Traffic Controller.

Struck /crushed by
machine/Collision

Struck /crushed by
machine/Collision

10

Fatality /body injuries

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

12

1. Safe work practice/procedure must be follow


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide Barricade to Excavate Area.
4.
Appoint a signalman with a good communication to operator.

1. Stop work.
2.Terminate if necessary

Falling of materials

Fatality /body injuries

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

Operation in unsafe mode

Body injuries / fatality

Admin. Control work practice

Fall into excavated trench

Body injuries

Engineering,Admin controlGuardrail/Barrier, monitoring

Potential contact with


underground power line

Body injuries / fatality

Enggineering, Admin. Control


& PPE - Safety awareness
-Isolation, Briefing,
Monitoring and appropriate
PPE

12

II

Electrocution (Working near


power sources)

Fatality /body injuries

Admin Control & PPE


-Briefing, monitoring, Safe
Work Practice, hand glove &
Safety Boot

12

II

Lightning

Body injuries / fatality

Admin Control Safe


work practice & Briefing.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. Stop
work immediatly.

Body injuries / fatality

Enggineering & Admin.


Control - Safety awareness
-Barrier, Traffic
Control, Training, Briefing &
Monitoring

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Arrange flow of traffic
4. Appoint a Traffic Controller.

Struck /crushed by
machine/Collision

Safe

1. All workers must be inducted before commencing work.


2. All
workers must use proper P.P.E
3. To provide
competent super visor to supervise the activity full time.
4. To organize Tool Box
talk/meeting every time want to start work.
5. To provide Clearance Marking
as per TNB requirement. 6. Permit To Work.
1. Safe work practice/procedure must be follow
2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

C, PC, NC

11

12

Lorry / Dump Truck

Roller / Roller Compactor

NR/W

NR/W

Fall into excavated trench

Body injuries

Struck /crushed by
machine/Collision

Body injuries / fatality

Enggineering & Admin.


Control - Safety awareness
-Barrier, Traffic
Control, Training, Briefing &
Monitoring

12

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide Barricade to Excavate Area.
4.
Appoint a Traffic Controller.

Inhalation of heavy smoke /


exhaust fume

Chronic health problem

Enggineering & Admin.


Control - Safety awareness
-Face mask,
Servicing, Toolbox Talk,
Monitoring

1. All workers must used proper PPE at work site.


2.
Un-good condition of machinery need to be check and repair as
posible.
3.
Toolbox Talk before start work.
4. Place the machine in a good ventilation area.

Falling of materials

Body injuries

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Appoint a Traffic Controller.

Struck /crushed by
machine/Collision

Exposure to noise

Body Vibration

Exposure to noise

Caught in moving parts of


machines

13

Power Tool

NR/W

Engineering,Admin controlGuardrail/Barrier, monitoring

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

Body Vibration

Hand-arm vibration

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

Body injuries / fatality

Enggineering & Admin.


Control - Safety awareness
-Barrier, Traffic
Control, Training, Briefing &
Monitoring

12

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide Barricade to working Area.
4.
Appoint a Traffic Controller.

Chronic hearing problem

Admin. Control & PPE Safety awareness


-Ear plug/muff &
initial noise monitoring

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E
Noise monitoring
4. Briefing before start work.

Body Injuries/
Health Impact

Admin. Control Training, Briefing, Job Rotation


& Safe work practice

1. Operator must be inducted before start work.


2. Work monitoring in a potential area.

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E
3.
To provide competent super visor to supervise the activity full time.
4.
To organize Tool Box talk/meeting every time want to start work.

Admin. Control & PPE Safety awareness


Chronic hearing problem
-Ear plug/muff &
initial noise monitoring

3.

Engin, Admin Control & PPE Guard rail, Safe work practice,
Training & Briefing.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide guard to moving part if necessary.
4. Supervise the work

Admin. Control Training, Briefing, Job Rotation


& Safe work practice

1. Workers must be inducted before start work.


2. Work monitoring and supervising.
3. Workers must have a good health and fit to work.

Admin. Control Carpal tunnel syndrome Training, Briefing, Job Rotation


& Safe work practice

Body injuries / fatality

Body Injuries/
Health Impact

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

12

C, PC, NC

Electrocution

Exposure to noise

15

Drill / Grinder

Jack Hammer / Hacker

Admin control & PPE


Training, Briefing, Protective
clothing &
hand glove.

Admin. Control & PPE Safety awareness


Chronic hearing problem
-Ear plug/muff &
initial noise monitoring

Eye or body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

Exposure to sharp object

Hand Injuries

Engineering, admin control &


PPE Guarded, briefing
and Protective clothing

Operation in unsafe mode

Body injuries / fatality

Flying of particles

14

Fatality /body injuries

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

II

Safe

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E
To provide competent super visor to supervise the activity.

3.

4. Briefing before start work.

1. All moving part of the machine must be fully guarded.


2.
All workers must be inducted before commencing of work. 3. All
workers must be briefing before start work.
4.
Proper PPE must be worn while working.
5.
Provide training to workers which involved.

1. Stop work.
2.Terminate if necessary

NR/W
Admin. Control work practice

1. Electrical Hand Tool must be in good condition.


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
4. Competent/Training.

Body injuries

Engin, Admin Control & PPE Machine Guard, Safe work


practice, Training & Briefing.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide guard to moving part if necessary.
4. Supervise the work

Electrocution

Fatality /body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

12

II

1. Electrical Hand Tool must be in good condition.


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
4. Competent/Training.

Exposure to noise

Chronic hearing problem

Caught in moving parts of


machines

Admin. Control & PPE Safety awareness


-Ear plug/muff &
initial noise monitoring

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E
To provide competent super visor to supervise the activity.

3.

4. Briefing before start work.

Body injuries

Engin, Admin Control & PPE Machine Guard, Safe work


practice, Training & Briefing.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide guard to moving part if necessary.
4. Supervise the work

Electrocution

Fatality /body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

1. Electrical Hand Tool must be in good condition.


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
4. Competent/Training.

Body vibration

Body injuries

Admin. Control Training, Briefing, Job Rotation


& Safe work practice

1. Electrical Hand Tool must be in good condition.


2. Workers must be inducted before start work.
3. Work monitoring and supervising.
4. Workers must have a good health and fit to
work.
5. Competent/Training.

Caught in moving parts of


machines
NR/W

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

C, PC, NC

16

Risk
Rating

Leakage of oxy-acetylene
hose- fire or explosion

Fatality /body injuries

Engineering & Admin.


Control - Flash Back Arrestor,
Training, Briefing & Hot work
permit

12

II

1. Cartridge must be stored in proper place and secure.


2.
The cartridge must have a bucket c/w standby fire extinguisher.
3.
Only the hose with flash back arreator allowed to be used. 4.
Only the competent workers can operate the welding.
5. Working permit needed before start work.
6. Safety briefing and workplace monitoring by
supervisor in charge

Electrocution

Fatality /body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

12

II

1. Electrical Hand Tool must be in good condition.


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
4. Competent/Training.

Admin control & PPE


permanent eye damage Training, Briefing &
Face
Shield

Exposed to UV & IR ray


Welding - (Electric/Gases)

Significant
Hazard?
(Y/N)

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

R/W

R/W

17 Construction of Main Drains

NR/W

Heat Stress

Fatigue/ skin rash

Engineering, admin control &


PPE Shelter, Briefing &
Protective clothing

Exposure to welding fume

Irritation of respiratory
tract

Admin control & PPE


Training, Briefing &
Face
mask

Exposure to welding spark

Skin burn

Admin control & PPE


Training, Briefing, Protective
clothing,
hand glove
& face shield

Falling of materials

Fatality /body injuries

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

12

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide Barricade to Excavate Area.
4.
Appoint a signalman with a good communication to operator.

Soil collapse into


trench/Cave in

Body injuries / fatality

Engineering control- Shoring/


safe work practice, Supervising

12

II

1. Permit To Work Required before excavation.


Supervise at all potential area in full time.
Briefing/Toolbox Talk before start work.
Trenching system required.
5. Training.

Inhalation of dust/Concrette
Dust

Irritation of respiratory
tract

Engineering, admin control &


PPE Water
sprinkling/Browser, Dust mask
and training

1. Provide water sprinkler/ browser to prevent flying dust.


supply face mask to worker which involved

Slippery & poor


access/egress

Slip, trip & fall - body


injuries

Engineering, Admin Control Provided proper


access/egress,
training/information

Ergonomic- awkward position


& repetitive motion

Body strain

Admin. Control Training, Briefing, Job Rotation


& Safe work practice

Lightning

Body injuries / fatality

Admin Control Safe


work practice & Briefing.

1. All workers must used proper PPE at work site.


2.
Un-good condition of equipment need to be check and repair as
posible.
3.
Toolbox Talk before start work.

2.
3.
4.

2.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. Stop
work immediatly.

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

C, PC, NC

R/W

18

19

Wall

Formwork

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

Heat Stress

Fatigue/ skin rash

Engineering, admin control &


PPE Shelter, Briefing &
Protective clothing

Falling from Height

Body injuries / fatality

Engin. & Admin Control Walking Platform, Safety


Harness /belt, Training &
Briefing

12

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works..

Falling of construction
material from height

Fatality /body injuries

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works..

Wall Collapse

Body injuries / fatality

Admin control & PPE


Training, Briefing,safe Work
Practice & Safety Helmet

1. Supervise & monitoring at all potential area.


2. Briefing/Toolbox Talk before start work.
3. Training & Safe work Practice.
4. Analyze works expose to hazards.

Ergonomic- awkward position


& repetitive motion

Body strain

Admin. Control Training, Briefing, Job Rotation


& Safe work practice

Falling from Height

Body injuries / fatality

Engin. & Admin Control Walking Platform, Safety


Harness /belt, Training &
Briefing

12

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works..

Entanglement by rotating saw

Body injuries / fatality

Engin, Admin Control & PPE Safe guard, Safe work practice,
Training & Briefing.

12

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Guarding machine/moving part.

Inhalation of wood dust

Irritation of respiratory
tract

Admin Control & PPE Dust mask and training

Flying of nails/ objects

Eye or body injuries

Admin control & PPE


Training, Briefing, Protective
clothing

Failure of formwork/
temporary platform

Body injuries / fatality

Enggin. & Admin. Control Safety awareness,


Competent, PE Design,
Training, Briefing & Monitoring

12

II

Protruding nails, starter bar &


sharp objects

Body injuries

Engineering control -house


keeping

Struck or pinch by hammer

Hand Injuries

R/W

R/W

Admin control & PPE Briefing, Hand Glove and


Protective clothing

1. Erected by competent/training person only.


2. PE Design required for any scaffold erected more than 15
meters.
3. Inspection and supervising of competent person every
time before its to be used.
4. Record keeping.
5. Ensure the material is in good
condition/serviceable

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

12

C, PC, NC

Falling of construction
material from height

Collapse/Failure of formwork/
temporary platform

Falling from Height

Falling of construction
material from height

R/W

20

Fatality /body injuries

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

Body injuries / fatality

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

Body injuries / fatality

Engin. & Admin Control Walking Platform, Safety


Harness /belt, Training &
Briefing

Fatality /body injuries

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

12

12

12

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works..

II

1. All formwork support such as scaffold must be check frequently


to avoid any miss use or damage by the competent/train person.
2.
All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works..

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works..

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works..

Failure of formwork/
temporary platform

Body injuries / fatality

Enggin. & Admin. Control Safety awareness,


Competent, PE Design,
Training, Briefing & Monitoring

12

II

1. Erected by competent/training person only.


2. PE Design required for any scaffold erected more than 15
meters.
3. Inspection and supervising of competent person every
time before its to be used.
4. Record keeping.
5. Ensure the material is in good
condition/serviceable

Struck or hit by concrete


bucket/ mixer

Body injuries / fatality

Admin. Control - Safety


awareness
Signalman, Training, Briefing &
Monitoring

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Appoint a Signalman.

Splashes of conrete in eyes


and contact with skin

Eye or body injuries

Admin control & PPE


Training, Briefing, Protective
clothing &
hand glove.

Concretting
(Vibrator machine, mortar
pump & etc)

NR/W

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

Fatality /body injuries

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

12

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works..

Body/Hand-arm vibration

Body injuries

Admin. Control Training, Briefing, Job Rotation


& Safe work practice

1. Electrical Hand Tool must be in good condition.


2. Workers must be inducted before start work.
3. Work monitoring and supervising.
4. Workers must have a good health and fit to
work.
5. Competent/Training.

Lightning

Body injuries / fatality

Admin Control Safe


work practice & Briefing.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. Stop
work immediatly.

Falling of concrete bucket


from height

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

C, PC, NC

R/W

Ergonomic- awkward position


& repetitive motion

Falling from Height

Falling of construction
material from height

Body strain

Admin. Control Training, Briefing, Job Rotation


& Safe work practice

Body injuries / fatality

Engin. & Admin Control Walking Platform, Safety


Harness /belt, lifelines, Training
& Briefing

Fatality /body injuries

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

12

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works.
5. Follow working at height procedure.
6. Training
workers.
1. All workers must be inducted before commencing of work.
2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
practically to provide Catch Platform or catch netting at a potential
area.
4.
Appoint a signalman with a good communication to operator.
5. Safe work practice.

Body injuries / fatality

Admin Control Safe


work practice & Briefing.

Electrocution

Fatality /body injuries

Admin control & PPE


Training, Briefing, Protective
clothing &
hand
glove.

12

II

Heat Stress

Fatigue/ skin rash

Engineering, admin control &


PPE Shelter, Briefing &
Protective clothing

12

II

Lightning

21

Installation of Roof

R/W

12

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. Stop
work immediatly.
1. Electrical Hand Tool must be in good condition.
2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
4. Competent/Training.
5. Proper PPE must be
worn.
1. Proper PPE must be worn.
2. Briefing before start work.
3. Supervise and
monitoring potential impact to workers.
4. Provide
shelter/cool place for rest if necessary.
5. Wear a appropriate clothing.
1. All equipment must be place correctly and check daily to prevent
from any falling material when raining or heavy wind occurs.

Wind/Rain

Slippery & poor


access/egress

22

Structure Collapse/
disturbed/budge

Slip, trip & fall - body


injuries

Admin. Control work practice

Safe

Engineering, Admin Control Provided proper


access/egress,
training/information

12

II

2. Immediate action must be taken when comes the unwanted


condition that may prevent damage/injury to property or people.
4. Safe work
practice and prosedure working at height must be follow.

1. Proper PPE must be worn.


2. Briefing before start work.
3. Supervise and
monitoring potential impact to workers.
4. Issued an
appropriate grip shoe.
5.
Wear a appropriate clothing.

Falling from Height

Body injuries / fatality

Engin. & Admin Control Walking Platform, Safety


Harness /belt, Training &
Briefing

12

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works.
5. Follow working at height procedure.
6. Training
workers.

Inhalation of dust/Concrette
Dust

Irritation of respiratory
tract

Engineering, admin control &


PPE Water
sprinkling/Browser, Dust mask
and training

1. Provide water sprinkler/ browser to prevent flying dust.


supply face mask to worker which involved

Spillage into eyes and


contact with skin

Eye injuries, Skin


irritation/dermatitis

Admin Control & PPE hand


glove, protective clothing &
safety glass

2.

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

C, PC, NC

Skin contact with cement


mortar
Brick Laying

Skin irritation/dermatitis

PPE- hand glove & protective


clothing

Fatality /body injuries

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

R/W

Falling of construction
material from height

12

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
practically to provide Catch Platform or catch netting at a potential
area.
4.
Appoint a signalman with a good communication to operator.
5. Safe work practice.

Ergonomic- awkward position


& repetitive motion

Collapse of construction
material

Body strain

Body injuries / fatality

Admin. Control Training, Briefing, Job Rotation


& Safe work practice

Engineering control- Safe


work practice, Supervising

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Supervise workers due to the potential area.
4. Used proper working platform.
5. Safe work practice.

23

24

Tiling, Marble and Parquet

1. Proper PPE must be worn.


2. Briefing before start work.
3. Supervise and
monitoring potential impact to workers.
4. Provide
shelter/cool place for rest if necessary.
5. Wear a appropriate clothing.

1. Proper PPE must be worn.


2. Briefing before start work.
3. Supervise and
monitoring potential impact to workers.
4. Wear an
appropriate clothing.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. To
provide working platform.
5. Safe work practice.

1. Proper PPE must be worn.


2. Briefing before start work.
3. Supervise and
monitoring potential impact to workers.
4. Issued an
appropriate grip shoe.
5.
Wear a appropriate clothing.

Body injuries / fatality

Heat Stress

Fatigue/ skin rash

Engineering, admin control &


PPE Shelter, Briefing &
Protective clothing

Splashes of conrete in eyes


and contact with skin

Eye injuries & skin


irritation, dermatitis

PPE- Protective clothing, safety


glass & glove

Falling of construction
material from height

Fatality /body injuries

Admin control & PPE


Training, Briefing, Safe Work
Practice &
Safety Helmet

Trip, Slip and Fall

Body injuries

Engineering, Admin Control Provided proper


access/egress,
training/information

Inhalation of dust/Concrette
Dust

Irritation of respiratory
tract

Admin control & PPE Dust mask and training

Falling from Height

Plastering

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works.
5. Follow working at height procedure.
6. Training
workers.

Engin. & Admin Control Walking Platform, Safety


Harness /belt, Training &
Briefing

12

R/W

R/W

Hazard Identification

No.
24

Sub-Activity
Tiling, Marble and Parquet

Condition of
assessment
R/W

Hazards

Painting

Significant
Hazard?
(Y/N)

Risk
Rating

Hand Injuries

Admin control & PPE Briefing, Hand Glove and


Protective clothing

Body injuries / fatality

Falling of construction
material from height

Fatality /body injuries

Admin control & PPE


Training, Briefing, Safe Work
Practice &
Safety Helmet

Slippery & poor


access/egress

Slip, trip & fall - body


injuries

Engineering, Admin Control Provided proper


access/egress,
training/information

Ergonomic- awkward position


& repetitive motion

Body strain

Admin. Control Training, Briefing, Job Rotation


& Safe work practice

Body injuries / fatality

Engin. & Admin Control Working Platform, Safety


Harness /belt, Training &
Briefing

Falling of construction
material from height

Fatality /body injuries

Admin control & PPE


Training, Briefing, Safe Work
Practice &
Safety Helmet

Slippery & poor


access/egress

Slip, trip & fall - body


injuries

Engineering, Admin Control Provided proper


access/egress,
training/information

Inhalation of dust/Painting
fume

Irritation of respiratory
tract

Admin control & PPE Face mask and training

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. To
provide working platform.
4. Safe work practice.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. To
provide working platform.
4. Safe work practice.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. To
provide proper access/egress.
4. Safe work practice.

12

R/W

Falling from Height

26

Existing Control Measures


(ECM)

Engin. & Admin Control Working Platform, Safety


Harness /belt, Training &
Briefing

Falling from Height

Ceiling

Consequences

C, PC, NC

Exposure to sharp object

25

Control
Legal
Compliance

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. To
provide working platform.
4. Safe work practice.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. To
provide working platform.
4. Safe work practice.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. To
provide proper access/egress.
4. Safe work practice.

12

R/W

PT. MITRA BINTANG INDONESIA


Department

Area
Activity

project

Personnel
participated &
consulted:
Name

External Works

Doc No.

OSH TASK RISK ASSESSMENT


Assessors name

Ref Code / Rev

Prepared by:

1)
2)
3)

Reviewed by:

Name:
Signature:
Date:

Name:
Signature:
Date:

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

12

C, PC, NC

Retaining Wall

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works..

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works..

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works..

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. Stop
work immediatly.

1. All workers must be brief before commencing of work.


Stop work immediatly.

12

II

1. Briefing before start work. 2. Plan and schedule work


programme. 3. Place traffic controller to monitor and control .

II

1. All workers must be inducted before commencing work.


2. All
workers must use proper P.P.E
3. To provide
competent super visor to supervise the activity full time.
4. To organize Tool Box
talk/meeting every time want to start work.
5. To provide Clearance Marking
as per TNB requirement. 6. Permit To Work. (Liase with TNB)

Engin. & Admin Control Working Platform, Safety


Harness /belt, Training &
Briefing

Fatality /body injuries

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

Collapse

Fatality /body injuries

Admin. Control - Safe


working load/procedure

Lightning

Body injuries / fatality

Admin Control Safe


work practice & Briefing.

Heavy Wind / Rain

Structure Collapse/
disturbed/budge

Admin Control Safe


work practice & Briefing.

Heat Stress

Fatigue

Engineering, admin control


& PPE Shelter,
Briefing & Protective clothing

Ergonomics

Sprains, strains &


backache

Falling of Person from a


moving machine

Body injuries

Admin Control - Safe work


practice, Training & Briefing

Struck by Machineries

Fatality /body injuries

PPE & Admin Control Signage, Safety Vest,


Training & Briefing

Body injuries / fatality

Enggineering, Admin.
Control & PPE - Safety
awareness
-Isolation, Briefing, Monitoring
and appropriate PPE

Falling Objects

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

II

Body injuries / fatality

Falling of Person

12

R/W

Potential contact with


underground power line

Approved by:

Name:
Signature:
Date:

Admin. Control work practice

Safe

12

2.

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

C, PC, NC

External Road - (Pneumatic


Machine, Compactor Roller,
Back Pusher, Back Hoe,
Cutting Road Machine, Lorry)

R/W

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

Exposure to noise

Chronic hearing
problem

Admin. Control & PPE Safety awareness


-Ear plug/muff &
initial noise monitoring

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E
3.
To provide competent super visor to supervise the activity full time.
4.
To organize Tool Box talk/meeting every time want to start work.

Inhalation of heavy smoke /


exhaust fume

Chronic health problem

Enggineering & Admin.


Control - Safety awareness
-Face mask,
Servicing, Toolbox Talk,
Monitoring

1. All workers must used proper PPE at work site.


2.
Un-good condition of machinery need to be check and repair as
posible.
3.
Toolbox Talk before start work.

Inhalation of dust

Irritation of respiratory
tract

Engineering, admin control


& PPE Water
sprinkling/Browser, Dust
mask and training

1. Provide water sprinkler/ browser to prevent flying dust.


supply face mask to worker which involved

Flying of particles and cutting


disc

Eye or body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

Caught into rotating parts

Body injuries / fatality

Engin, Admin Control &


PPE - Safe guard, Safe work
practice, Training & Briefing.

12

II

Body vibration syndrome

Body injuries

Admin. Control Training, Briefing, Job


Rotation & Safe work practice

Operation in unsafe mode

Body injuries / fatality

Admin. Control work practice

1. Stop work.
2.Terminate if necessary

Splashes of hot bitumen in


eyes and contact with skin

Eye injuries & skin


irritation, dermatitis

PPE- Protective clothing,


safety glass & glove

1. Proper PPE must be worn.


2. Briefing before start work.
3. Supervise and
monitoring potential impact to workers.
4. Wear an
appropriate clothing.

Manual handling

Body strain

Admin. Control Training, Briefing, Job


Rotation & Safe work practice

Exposed hot surface

Skin burn

Admin Control & PPE Briefing,Protective clothing,


hand glove & face shield

Inhalation of bitumen vapor/


mist

Irritation of respiratory
tract / chronic health
problem in long term

Admin control & PPE Dust


mask and training

Heat Stress

Fatigue

Engineering, admin control


& PPE Shelter,
Briefing & Protective clothing

Struck /crushed by
machine/Collision

Body injuries / fatality

Enggineering & Admin.


Control - Safety awareness
-Barrier, Traffic
Control, Training, Briefing &
Monitoring

Safe

2.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Guarding machine/moving part.

1. Briefing before start work.


2. supply face mask to worker which involved

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide Barricade to Excavate Area.
4.
Appoint a Traffic Controller.

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

C, PC, NC

Drainage / Sewerage

External Water Reticulation

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

Soil collapse into


trench/Cave in

Body injuries / fatality

Engineering controlShoring/ safe work practice,


Supervising

12

II

Fall into excavated trench

Body injuries

Engineering,Admin controlGuardrail/Barrier, monitoring

1. Permit To Work Required before excavation.


Supervise at all potential area in full time.
Briefing/Toolbox Talk before start work.
Training.

2.
3.
4.

Engineering, admin control


Harzadous Atmosphere & PPE Guidelines in
Toxic Gas (Confined Space)
Industrial Code Of Practice
2010 (ICOP)

12

II

Detail Requirement:
1. Permit
System. 2. Permit to Work. 3. Isolation Requirement.
4.Requirement to Ensure Safety of Atmosphere. 5. Entry Into
Hazardous Atmosphere.
6. Rescue and Emergency
Services. 7.Health Requirements of Person Working in Confined
Space. 8. Training.
9. Additional Precautions During
Occupancy of Confined Space. 10. Record Keeping.

Mosquito/ insect bites

Dengue/ skin
rash/dermatitis

1. Appoint pest control to clear all insect/ mosquito as shown in


Prevention And Control Of Infectious Diseases Act and Regulation

Drowning

Fatality

Engineering, admin control


& PPE Safe Work
Practice

1. Provide a safe access/egress. 2. Hand rail and walking


platform. 3. A proper PPE such as safety harness and lifelines. 4.
Briefing before start work. 5. Supervise and monitoring. 6.
Analyze potential hazard may harm workers. Safe work procedure.

Lightning

Body injuries / fatality

Admin Control Safe


work practice & Briefing.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. Stop
work immediatly.

Struck /crushed by
machine/Collision

Body injuries / fatality

Admin. Control - Safety


awareness, Briefing and
Traffic Control

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide Barricade to Excavate Area.
4.
Appoint a Traffic Controller.

Slippery & poor


access/egress

Body injuries

Engin, Admin Control &


PPE - Guard rail, Safe work
practice, Training & Briefing.

Electrocution

Fatality /body injuries

Admin Control & PPE


-Briefing,Protective clothing,
hand glove & Safety Boot

1. Electrical Hand Tool must be in good condition.


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
4. Competent/Training.

Lightning

Body injuries / fatality

Admin Control Safe


work practice & Briefing.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3. Stop
work immediatly.

Electrocution

Fatality /body injuries

Admin Control & PPE


-Briefing,Protective clothing,
hand glove & Safety Boot

1. Electrical Hand Tool must be in good condition.


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
4. Competent/Training.

Manual handling

Body strain

Admin. Control Training, Briefing, Job


Rotation & Safe work practice

R/W

Eliminationcontrol

Pest

R/W

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

C, PC, NC

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

Ergonomic- awkward position


& repetitive motion

Body strain

Admin. Control Training, Briefing, Job


Rotation & Safe work practice

Slippery & poor


access/egress

Body injuries

Engin, Admin Control &


PPE - Guard rail, Safe work
practice, Training & Briefing.

Heat Stress

Fatigue

Engineering, admin control


& PPE Shelter,
Briefing & Protective clothing

Fatality /body injuries

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

Skin burn

Admin Control & PPE Briefing,Protective clothing,


hand glove & face shield

Exposure to sharp object

Hand Injuries

Engineering, admin control


& PPE Guarded,
briefing and Protective
clothing

1. All moving part of the machine must be fully guarded.


2.
All workers must be inducted before commencing of work. 3. All
workers must be briefing before start work.
4.
Proper PPE must be worn while working.
5.
Provide training to workers which involved.

Minor fire accident/


Contact with Hot Part

Skin burn

Admin Control & PPE Briefing,Protective clothing,


hand glove & face shield

1. Permit To Work Required before excavation.


Supervise at all potential area in full time.
Briefing/Toolbox Talk before start work.
Training.

II

Detail Requirement:
1. Permit
System. 2. Permit to Work. 3. Isolation Requirement.
4.Requirement to Ensure Safety of Atmosphere. 5. Entry Into
Hazardous Atmosphere.
6. Rescue and Emergency
Services. 7.Health Requirements of Person Working in Confined
Space. 8. Training.
9. Additional Precautions During
Occupancy of Confined Space. 10. Record Keeping.

Falling of construction
material from height

12

II

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
practically to provide Catch Platform or catch netting at a potential
area.
4.
Appoint a signalman with a good communication to operator.
5. Safe work practice.

Minor fire accident

External M & E - (Electrical &


TNB Sub-Station)

R/W

Confined Space

Engineering, admin control


Harzadous Atmosphere & PPE Guidelines in
Industrial Code Of Practice
2010 (ICOP)

12

2.
3.
4.

12

II

1. All workers must be inducted before commencing work.


2. All
workers must use proper P.P.E
3. To provide
competent super visor to supervise the activity full time.
4. To organize Tool Box
talk/meeting every time want to start work.
5. To provide Clearance Marking
as per TNB requirement. 6. Permit To Work.

Potential contact with


underground power line

Body injuries / fatality

Enggineering, Admin.
Control & PPE - Safety
awareness
-Isolation, Briefing, Monitoring
and appropriate PPE

Soil collapse into


trench/Cave in

Body injuries / fatality

Engineering controlShoring/ safe work practice,


Supervising

12

II

1. Permit To Work Required before excavation.


Supervise at all potential area in full time.
Briefing/Toolbox Talk before start work.
Training.

Minor fire accident/ Contact


with Hot Part

Skin burn

Admin Control & PPE Briefing,Protective clothing,


hand glove & face shield

12

II

1. Permit To Work Required for Hot Job.


2. Flashback Arrestor is compulsory.
3. Briefing/Toolbox Talk before start work.
4. Competent/Training.

2.
3.
4.

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

C, PC, NC

Exposure to sharp object

Hand Injuries

Engineering, admin control


& PPE Guarded,
briefing and Protective
clothing

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

1. All moving part of the machine must be fully guarded.


2.
All workers must be inducted before commencing of work. 3. All
workers must be briefing before start work.
4.
Proper PPE must be worn while working.
5.
Provide training to workers which involved.

PT. MITRA BINTANG INDONESIA


Department

Area
Activity

PROJECT

Personnel
participated &
consulted:
Name

General Activities

Doc No.

OSH TASK RISK ASSESSMENT


Assessors name

Ref Code / Rev

Prepared by:

1)
2)
3)

Reviewed by:

Name:
Signature:
Date:

Name:
Signature:
Date:

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

C, PC, NC

Engineering, Admin Control


Provided proper
access/egress,
training/information

R/W

Falling of construction
material from height

Fatality /body injuries

Admin control & PPE


Training, Briefing, Safe Work
Practice &
Safety Helmet

R/W

Manual handling

Sprains, strains

Admin. Control Training, Briefing, Job


Rotation & Safe work practice

R/W

Snapping of lifting gear

Fatality /Body injuries

Comply SWL and inspection


of machineries & lifting gears.

R/W

Ergonomic- awkward position


& repetitive motion

Body strain

Admin. Control Training, Briefing, Job


Rotation & Safe work practice

R/W

Struck by material

Body injuries

Admin. Control - Safety


awareness

R/W

Falling from height

Body injuries / fatality

Engin. & Admin Control Walking Platform, Safety


Harness /belt, lifelines,
Training & Briefing

12

II

R/W

Manual handling

Sprains, strains &


backache

Admin. Control Training, Briefing, Job


Rotation & Safe work practice

R/W

Falling of construction
material from height

Fatality /body injuries

Admin control & PPE


Training, Briefing, Safe Work
Practice &
Safety Helmet

R/W

Inhalation of thinner/paint
vapor/ mist

Irritation of respiratory
tract / chronic health
problem in long term

Admin control & PPE Dust


mask and training

R/W

Splashes of hinner/paint in
eyes and contact with skin

Eye injuries & skin


irritation, dermatitis

PPE- Protective clothing,


safety glass & glove

Slippery & poor


access/egress

Loading and unloading of


construction materials

Installation of temporary
access / working platform

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

Slip, trip & fall - body


injuries

R/W

Approved by:

Name:
Signature:
Date:

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works..

1. Only Machiineries with the fit certificate (PMA) can be used at


site work. 2. Daily checklist for machineries to be fill up before
start work. 3. SWL must be follow and monitoring by supervisor. 4.
Change any damages item immediately. (Stop work if
necessary/change other machine)

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works..

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works..

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

C, PC, NC

Application of painting

Refilling of fuel, hydraulic &


application of lubricant

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

R/W

Ergonomic- awkward position


& repetitive motion

Body strain

Admin. Control Training, Briefing, Job


Rotation & safe lifting
procedure

R/W

Fire hazard - Smoking while


painting

Skin burnt

Elimination & Admin


Control - No spark source

12

II

R/W

Falling from height

Body injuries / fatality

Engin. & Admin Control Walking Platform, Safety


Harness /belt, lifelines,
Training & Briefing

R/W

Splashes in eyes and contact


with skin

Eye injuries & skin


irritation, dermatitis

PPE- Protective clothing,


safety glass & glove

R/W

Slippery & poor


access/egress

Slip, trip & fall - body


injuries

Engineering, Admin Control


Provided proper
access/egress,
training/information

R/W

Manual handling

Sprains, strains &


backache

Admin. Control Training, Briefing, Job


Rotation & safe lifting
procedure

R/W

Inhalation of vapor/ fume

Irritation of respiratory
tract / chronic health
problem in long term

Admin control & PPE Dust


mask and training

12

II

R/W

Fire & explosion

Body injuries / fatality

Admin. Control Training,


Briefing &
Safety
Awareness

R/W

Manual handling

Sprains, strains &


backache

Admin. Control Training, Briefing, Job


Rotation & safe lifting
procedure

R/W

Exposure to noise

Chronic hearing
problem

Admin. Control & PPE Safety awareness


-Ear plug/muff &
initial noise monitoring

R/W

Flying of concrete particles

Eye / body injuries

PPE- Protective clothing,


safety glass & glove

R/W

Exposure to concrete dust

Irritation of respiratory
tract

Admin control & PPE


Safety Awareness
Dust mask and training

Hacking & drilling of


concrete structure

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works..

1. All workers must be inducted before commencing of work.


2. No s,okimg or naked fire below 30 meters from the potential
area.
3. Provide training & safe work practice.
4. Monitoring and supervise the
works..

Hazard Identification
5

Hacking & drilling of


concrete structure

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

C, PC, NC

R/W

Application of pesticide

Workplace Inspection & site


visit

Slippery & poor


access/egress

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

Slip, trip & fall - body


injuries

Engineering, Admin Control


Provided proper
access/egress,
training/information

Engin. & Admin Control Walking Platform, Safety


Harness /belt, lifelines,
Training & Briefing

12

II

Admin control & PPE


Safety Awareness
Dust mask and training

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide training & safe work practice.
4. Monitoring and supervise the works..

R/W

Falling from height

Body injuries / fatality

NR/V

Inhalation of vapor /mist

Chronic health problem

NR/V

Splashes in eyes and contact


with skin

Eye injuries, Skin


irritation/dermatitis

PPE- Protective clothing,


safety glass & glove

NR/V

Manual handling

Sprains, strains &


backache

Admin. Control Training, Briefing, Job


Rotation & safe lifting
procedure

NR/V

Slippery & poor


access/egress

Slip, trip & fall - body


injuries

Engineering, Admin Control


Provided proper
access/egress,
training/information

NR/V

Ergonomic- awkward position


& repetitive motion

Body strain

Admin. Control Training, Briefing, Job


Rotation & Safe work practice

R/W

Insufficient lighting

Slip, trip & fall- body


injuries

Elimination- Provide sufficient


lighting

R/W

Slippery & poor


access/egress

Slip, trip & fall - body


injuries

Engineering, Admin Control


Provided proper
access/egress,
training/information

R/W

Unprotected floor opening/


edge

Slip, trip & fall- body


injuries / fatality

Elimination- Provide edge


protection

R/W

Mosquito/ insect bites

Dengue/ skin
rash/dermatitis

1. Appoint pest control to clear all insect/ mosquito as shown in


Prevention And Control Of Infectious Diseases Act and Regulation.
2.
Proper Housekeeping and safe environment.
1. Provide safe & secure walk way. (Barrier & Signages)
2. Briefing about safety matters and site
condition before entring workplace.
3. Avoid to be under loading material.
4. Monitoring activities near the
visiting people.
5. Stop work at a risky
area if necessary.

Eliminationcontrol

Pest

R/W

Falling of construction
material from height

Fatality /body injuries

Admin control & PPE


Training, Briefing, Signalman,
Safe Work Practice & Safety
Helmet

R/W

Protruding nails, starter bar &


sharp objects

Body injuries

Engineering control -house


keeping

R/W

Heat stress

Fatigue/ skin rash

Engineering, admin control


& PPE Shelter,
Briefing & Protective clothing

12

II

Workplace Inspection & site


visit

No.

Sub-Activity

Hazard Identification

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

C, PC, NC

R/W

Struck against object/


structure

Significant
Hazard?
(Y/N)

Risk
Rating

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

Body injuries

Enggineering & Admin.


Control - Safety awareness
-Barrier, Traffic
Control, Training, Briefing &
Monitoring

1. Provide safe & secure walk way.


2. Briefing about safety matters and site condition before
entring workplace.
3. Avoid to be under loading material.
4. Monitoring activities near the visiting people.
5. Stop work at a risky area if necessary.

1. Provide safe & secure walk way.


2. Briefing about safety matters and site condition before
entring workplace.
3. Stop activities immediattely when storm/thunder seen.

R/W

Thunder and lightning.

Body injuries/ fatality

Admin Control Safe


work practice & Briefing.

R/W

Slippery & poor


access/egress

Slip, trip & fall - body


injuries

Engineering, Admin Control


Provided proper
access/egress,
training/information

R/W

Struck against object

Body injuries

Enggineering & Admin.


Control - Safety awareness
-Barricade, Traffic
Control, Training, Briefing &
Monitoring

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.Monitoring the activities.
4. Barricade at te potential area and place signages.

R/W

Inhalation of heavy smoke /


exhaust fume

Irritation of respiratory
tract

Enggineering & Admin.


Control - Safety awareness
-Face mask,
Servicing, Toolbox Talk,
Monitoring

1. All workers must used proper PPE at work site.


2.
Un-good condition of machinery need to be check and repair as
posible.
3.
Toolbox Talk before start work.

R/W

Contact with hot parts

Skin burnt

Admin Control & PPE Briefing,Protective clothing,


hand glove & face shield

12

II

R/W

Exposure to noise

Chronic hearing
problem

Admin. Control & PPE Safety awareness


-Ear plug/muff &
initial noise monitoring

12

II

1. All workers must be inducted before commencing of work.


2. No smokimg or naked fire below 30 meters from the potential
area. (Briefing & signages)
3. Provide training & safe work practice.
4.
Monitoring and supervise the works..

Operation of genset & air


compressor

R/W

Fire & explosion

Body injuries / fatality

Admin. Control Training,


Briefing &
Safety
Awareness

R/W

Electric shock/ electrocution

Body injuries / fatality

Admin Control & PPE


-Briefing,Protective clothing,
hand glove & Safety Boot

1. Analyze any potential of hazards. 2. Daily checklist need to be


updated and display by the supervisor and any hazards must
immediattely take necessary action. 3. Safe work practice and
display signage. 4. only trained person can operate the machine.
5. Work monitoring and supervising

R/W

Struck by pressure hoses

Body injuries

Enggineering & Admin.


Control - Safety awareness
-Barrier, Traffic
Control, Training, Briefing &
Monitoring

1. Analyze any potential of hazards. 2. Daily checklist need to be


updated and display by the supervisor and any hazards must
immediattely take necessary action. 3. Safe work practice and
display signage. 4. only trained person can operate the machine.
5. Work monitoring and supervising

R/W

Unfit/ unsafe machine

Body injuries / fatality

Admin Control Safety awareness

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

Significant
Hazard?
(Y/N)

Risk
Rating

C, PC, NC

10

R/W

Falling from height

Fatality /Body injuries

Engin. & Admin Control Walking Platform, Safety


Harness /belt, Training &
Briefing

12

II

R/W

Slippery & poor


access/egress

Slip, trip & fall - body


injuries

Engineering, Admin Control


Provided proper
access/egress,
training/information

R/W

Manual handling

Sprains, strains

Admin. Control Training, Briefing, Job


Rotation & Safe work practice

R/W

Inhalation of dust

Irritate respiratory tract

Engineering, admin control


& PPE Water
sprinkling/Browser, Dust
mask and training

R/W

Exposed to UV & IR ray

permanent eye damage

R/W

Exposure to welding spark

Skin burnt

Admin control & PPE


Training, Briefing, Protective
clothing,
hand glove &
face shield

R/W

Electrocution

Fatality /body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

12

II

R/W

Exposure to welding fume

Irritation of respiratory
tract

R/W

Minor fire accident

Skin burnt

House Keeping

Welding, grinding & oxycutting

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)

Admin control & PPE


Training, Briefing &
Face Shield

Admin control & PPE


Training, Briefing &
Face mask

Admin Control & PPE Briefing,Protective clothing,


hand glove & face shield

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.Monitoring the activities.
4. Barricade at te potential area and place signages.

1. Electrical Hand Tool must be in good condition.


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
4. Competent/Training. 5. Proper PPE must be
provided.
6. Random check before start work.

1. Cartridge must be stored in proper place and secure.


The cartridge must have a bucket c/w standby fire extinguisher.

2.
3.

R/W

Leakage of oxy-acetylene
hose- fire or explosion

Fatality /body injuries

Engineering & Admin.


Control - Flash Back
Arrestor, Training, Briefing &
Hot work permit

12

II

R/W

Inhalation of dust

Irritation of respiratory
tract

Engineering, admin control


& PPE - Welding Sheild,
Face mask and training

R/W

Flying of particles

Eye or body injuries

Admin control & PPE


Training, Briefing, Welding
sheild, Protective clothing &
hand glove.

Only the hose with flash back arrestor allowed to be used. 4.


Only the competent/train workers can operate the welding
equipment.
5. Working permit needed before start hot work.
6. Safety briefing and workplace monitoring
by supervisor in charge

Hazard Identification

No.

Sub-Activity

Condition of
assessment

Hazards

Control

Consequences

Existing Control Measures


(ECM)

Legal
Compliance
F

C, PC, NC

11

Operation of
pneumatic/electrical
powered hand tools.

Significant
Hazard?
(Y/N)

Risk
Rating

Determination of control hierarchy:


1. Elimination of hazards
Risk 2. Substitution
Categ. 3. Engineering
4. Administrative
5. Personal Protective Equipment (PPE)
1. Electrical Hand Tool must be in good condition.
2. Workers must be inducted before start work.
3. Work monitoring and supervising.
4. Workers must have a good health and fit to
work.
5. Competent/Training.

R/W

Body vibration

Body injuries

Admin. Control Training, Briefing, Job


Rotation & Safe work practice

R/W

Ergonomic- awkward position


& repetitive motion

Body strain

Admin. Control Training, Briefing, Job


Rotation & Safe work practice

R/W

Exposure to noise in long


term

Chronic hearing
problem

Admin. Control & PPE Safety awareness


-Ear plug/muff &
initial noise monitoring

R/W

Flying of sharp object

Eye or body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

R/W

Exposure to rotating parts

Hand injuries

Engin, Admin Control &


PPE - Machine Guard, Safe
work practice, Training &
Briefing.

1. All workers must be inducted before commencing of work.


2. All workers must be briefing before commencement and weekly
toolbox talks to explain the hazards.
3.
Provide guard to moving part if necessary.
4. Supervise the work

II

1. Electrical Hand Tool must be in good condition.


2. Monitoring and analyze the potential of hazard.
3. Briefing/Toolbox Talk before start work.
4. Competent/Training.
5. Proper PPE must be provided.
6. Random check before
start work.

R/W

Electrocution

Fatality /body injuries

Admin control & PPE


Training, Briefing, Protective
clothing & hand glove.

12

1. All workers must be inducted before commencing work.


2. All workers must use proper P.P.E
3.
To provide supervisor to monitoring the activity.
4. Briefing
before start work.

Type
Biological

Chemical

Physical

Ergonomic

Psychosocial

Others

Hazard description
exposed to pathogen - bacteria, fungi, virus, toxic plant, leech
exposed to allergen
chemical splash onto skin, eye
chemical (high concentration) splash onto skin, eye
chemical (high concentration) splash eye
explosion
acute inhalation of vapor (short period of exposure to high concentration
of chemical vapour) - e.g. n-hexane

Consequences

skin or eye iritation


skin burnt
blindness
Fatality
narcosis (unconsciousness), due to a repressive
effect on the central nervous system.

chronic inhalation of vapor (repeated or prolonged exposure to relatively


low concentration of chemical vapour) - e.g. n-hexane

Chronic effect - e.g. cause peripheral neuropathy


(disease of the peripheral nerves), an irreversible
effect

chronic inhalation of fume (repeated or prolonged exposure to relatively


low levels of substance) - e.g. lead

anaemia, a reduced ability of the blood to distribute


oxygen throughout the body

inhalation of toxic substance


swallow (ingestion) of chemical
fire
exposed to carcinogens - e.g. benzene
inhalation of smoke
exposed to X-ray
exposed to excessive noise
exposed to high/low temperature
subjected to vibration impact
exposed to laser
exposed to microwave frequency
exposed to low freqeuncy
exposed to infrared
exposed to ultra violet
repetitive motion
awkward posture
wrong sitting posture
physical stress
vibration impact
computer screen radiation
forceful hand exertion
sexual harrasment
work harrassment
mental stress
exposed to conductive material
exposed to high static voltage
exposed to high voltage
hit/poked by object/mass
cut/poked by sharp object/edges
unguarded machine
draw in
caught in between
Snake bite
lack of oxygen
fall from height
fall on same level
hit by falling object
hit by vehicle
stab/puncture by flying object
stab/puncture by moving parts of machinery
sheared between two machines
sheared between a machinery part and workpiece
Drawn in between counter-rotating parts
Caught in between rotating and fixed-parts
caught in between materials in motion
contact against hot surface
contact against abrasive material
crushed by moving parts
crushed by stamping machine

Fatality
leukaemia - cancer of blood-forming tissues

asphyxiation (acute lack of oxygen that can cause


death)

Engineering control

Administrative control

PPE control
(Provision, control and
maintenance)

Adapt work to individual studies


prior to work start and applied

Planned machinery maintenance

Safety helmet

Water spray
Detection system
Enclosure/closed system
Machine guarding
Interlock system
General ventilation
Isolation
Local exhaust ventilation
Process control
Safety switch
Safety valve

Medical surveillance
Emergency preparedness and response plan
Audiometric test
Lock-out Tag-out (LOTO) system
Permit to work system
Workplace inspection
Signages
Safe work instruction availability
Scheduled breaks
Job rotation
Human factors:
Competency requirement (e.g. forklift driver, boilderman,
wireman, chargeman, AGT)

Safety shoes
Wire harness
Protective clothing
Goggles
Face shield
Dust mask
Vapor mask
Fume mask
Half-faced respirator
Full-faced respirator
Ear plug
Ear muff

Awareness program
Cotton glove
Training on PPE usage
Nitril (chemical) glove
Training on safe handling
On-the-Job Training (OJT)
Work matches workers physical capabilities
Medical checkup prior to work allocation (e.g. fitness check)
Behavior: Workers
a. following safe work practices / procedures (SWP)
b. wearing PPE (e.g. ear plug, chemical glove, vapor mask)
c. highligting on safety issues when observed