Вы находитесь на странице: 1из 3

RESUM

EUSEBIO P. PARREAS
POSITION APPLIED FOR

MECHANICAL TECHNICIAN/PIPEFITTER

:
:
:
:
:
:

July 04, 1970


Filipino
Male
56
155 lbs.
Pilipino/English

Vocational Course

ARC Welding
R.T.P.I. Morong, Rizal

Secondary

E.B. Magalona National High School

Primary

E.B. Magalona Elementary School

Company
Address

:
:

Project
Position
Inclusive Date

:
:
:

KEANGNAN ENTERPRISES, LTD.


Ambatovy Power Plant, Toamasina
Tamatave, Madagascar, Africa
Ambatovy Power Plant, Madagascar, Africa
Mechanical Technician/Pipefitter
November 21, 2008 December 11, 2011

PERSONAL INFORMATION
Date of Birth
Citizenship
Gender
Height
Weight
Language

EDUCATIONAL BACKGROUND

PROFESSIONAL EXPERIENCE

Job Description
Participate in commissioning work of all static/ rotating and associate pipe
work of Power Plant Facilities.
Perform solo run, load run /water circulation.
Performed water flushing, air blowing and any testing as required.
Perform line walk and punch out/ clean out punch list work in daily basis.
Assist operation in maintenance activities for prior start up/operation.
Operate and maintenance of fly ash system, bed material system and
electro statistical precipitator system.
Company
Address

:
:

IREM S.pA. Ltd.


Yanbu, Saudi Arabia

Project
Position
Inclusive Date

:
:
:

Yanbu National Petrochemical Company of Olefins


Pipefitter
December 27, 2006 January 04, 2008

Job Description
Assigned to fabricate and fit-up of pipe spools and fittings based on
isometric drawing, materials specification based on standard.
Company
Address
Project
Position
Inclusive Date

:
:
:
:
:

MECHATRENDS CONTRACTORS CORP.


Pandacan, Metro Manila, Philippines
Pandacan Terminal Integration Project
Piping Leadman
2004 - 2005

Job Description
Assigned in all kinds of fittings such as elbows, tees flanges, and reducer.
Assigned also in punch list checking of all the line number of pipe, if it is complete or not
complete.

Company
Address
Project

:
:
:

Position
Inclusive Date

:
:

LEAD CONTRACTING & TRADING


Abu Dhabi, U.A.E.
Shuweihat Water Transmission Scheme, Lot-C
MIRFA Pumping Station-C.S. Piping Spool Erection
Pipefitter
February 2003 May 2004

Job Description
Assigned Decilination Mirfa, pumping station then installation of pipe 36 dia., 48 dia., 56
dia., 64 dia. And 72 dia. And fit-up going to tank.
Company
Address

:
:

Project
Position
Inclusive Date

:
:
:

OPE/O.P.S. INTERNATIONAL CO. LTD.


P.O. Box 2237, Amal V-12
Tripoli, Libya, G.S.P.L.A.J.
Veba Oil/Wintershall/Halliburton
Pipefitter
2000 - 2002

Job Description
Assigned in fabrication, fabrication of drain tank platform ladders.
Preparation for lay-out cutting, grinding to fit-up the pipe, size 2 dia., to 12 dia.
Also assigned in Turbine, dismantling, erection and install of silencer, floor panel, filter house
and revision of all wrong installation of pipe 10 dia. To 20 dia.

Company
Address

:
:

Project
Position
Inclusive Date

:
:
:

DAELIM INDUSTRIAL COMPANY LTD.


Korean Company
Formosa Complex, Mai-Liao, Taiwan
Formosa/Daelim, Refinery Project
Pipefitter
March 1999 March 17, 2000

Job Description
Assigned in V.G.O. Pipe Rack, installation of pipe 14 dia. Up to 18 dia. From pipe rack going
to the vessel.
Company
Address
Project
Position
Inclusive Date

:
:
:
:
:

D.S.D. COMPANY
Misurata, Libya
DSD Misurata
Pipefitter
September 01, 1996 April 26, 1997

Job Description
Assigned of all kinds of fittings such as Elvos Tees Flanges Reducer.
Assigned also in punch list checking all the line number of pipe, if it is complete or not.
Company

Address
Project
Position
Inclusive Date

:
:
:
:

EEI CORPORATION
Under Management Fluor Daniel Pacific, Inc.
Malaya, Pililla, Rizal
Bitumen Blowing Facilities of Shell Philippines
Pipefitter
November 08, 1993 December 14, 1994

Job Description
Assigned of all kinds of fittings such as Elvos Tees Flanges Reducer. Assigned also in punch
list checking all the line number of pipe, if it is complete or not.

EUSEBIO P. PARREAS
Applicant

Вам также может понравиться