TAddressoatey)
Nhe Ohi) 9,
4 4 Hf Project Manager
DOCUMENT TRANSMITTAL
ENGINEERING DESIGN DEPARTMENT
(address):
ZHANG, Jt XIAN ELECTRIC ENG'G CO., LTD.
‘Manila Office Address: Unit 2101-2102 Raffles Corporate Center,
Ortigas center, Pasig City, 1605
Tele: (632) 916-6518 Fax: 632) 916-6504
LAS PINAS SUBSTATION EXPANSION PROJECT | CSD No.
(SP13.LPSEP.LT-0153)
(Project Name & Schedule No., if applicable) (Our Reference: RPCCDD15-03-41
Date: March 25, 2015
Your Ref.
Date:
ENCLOSED FIND FOR YOUR PLEASE RETURN
Tetier
List
Prints
X_| DrawingsManuals
Documents
Brochures
# of Copies
2_| # of Set(s)-Drawing/Calculation X__| Information
Comments. Set (s)
Evaluation
Construction
“Approval Copies
K_| Revision OW (or BEFORE)
Implementation
X_| Reference
DWG. /DOC. No.
REV. DESCRIPTION
REMARKS
LAS PINAS SIS
1. Substation Automation System (SAS/MBSC)
Panel Schematics
X00 NOTHING FOLLOWS XXX
Notes:
Approval of these documents shall not be held to relieve XIAN
or any part of XIAN’s obligation to meet the requirements of the
Specifications nor of the responsibility for the correctness of
these documents.
‘A | Approves
INDICATED
“act | Argpoven WinoRResTioNs: RFC | RETURNED FOR CORRECTION
AWCI
EDD.
CEDD RPCCDD
CHK.
REV.
‘SUB.
Fs
REC.
FM-EDD-O1A Rev. B
ay DACTO-PRE HEADEDNATIONAL GRID CORPORATION OF THE PHILIPPINES
ENGINEERING DESIGN DEPARTMENT
ENGINEERING SHEET
DTFNO. RPCCDD15-03-41 _ Date: March 25, 2015
PROJECT: LAS PINAS SUBSTATION EXPANSION PROJECT (SP13.LPSEP.LT-0153)
Sus.ecr: Documents for Approval
Tem
Ne
Drawi
Drawing No.
Approval of these documents shall not be held to relieve XIAN's or any
party of XIAN's obligations to meet all the requirements of the
specifications nor of the responsibilty for the correctness of these
documents
LAS PINAS S/S
1. Substation Automation System (SAS/MBSC) Panel Awcl
‘Schematics
- Provide system architecture showing networks, Ethernet
switches, gateways, servers, HMls etc. then provide boll of
materials for all the inclusive devices.
= Show connecting of all IEDs.
= Provide specs for LED monitor.
= Provide specs for SAS server panel.
- Provide control circuit of connection of DS and discrepancy
switch. Refer to the attached drawing,
- Provide /O list for primary and secondary devices to be
interfaced on the BCUs of the SAS.
- Specify clearly BCUs for AC and DC system main breakers.
= AIlI/O from the BCU from shall be brought down to terminal
block
= All spare }O module /terminals of BCU should be included in the
database build-up of the SAS and can be easily customized,
= Provide bill of materials with brochures for all equipment and
Peripherals (ie. printer, console, server, EWS, OWS, mobile
‘workstation etc.) to be supplied under this project.
- Provide panel door front and rear view. Specify dimensions
of the panels. 2200x800x600(HxWxD).
- All panel rear doors shall be dual swinging type for “dual”
type panels.
- Refer to the attached 1/0 list for the alarms to be wired from
primary and secondary devices included in this project.
- Provide and specify auxiliary relay to be used by the BCU
binary outputs for controlling of the DS. -
There shall be another VT input for the BUS2 VT in the
synchronizer of each BCU when the bay is connected to bus
2 and the coupler is open. The synchronizer shall be capable
of selecting the BUS VT input depending on what BUS the
bay is connecter
(sr rroveo (GAWET] APpRovED wi CORRECTIONS INDICATED RETURNED FOR CORRECTIONS
orp — APPROVED BY:
ik -f
REV
suB ms
REC |
FM-EDD-01ANATIONAL GRID CORPORATION OF THE PHILIPPINES
ENGINEERING DESIGN DEPARTMENT
ENGINEERING SHEET
OTFNO. _RPCCDD15-03-41 DATE: March 25, 2015 _—
PROJECT: LAS PINAS SUBSTATION EXPANSION PROJECT (SP13.LPSEP.LT-0153)
Susiect. Documents for Approval
fen Drawing No. Drawing Title
crepancy switch for control of the
iagram of transformer BCUs.
- Inthe BCU panel of the coupler the VT inputs for the
synchronizer shall be from BUS1 VT and BUS2 VT. There shall
be no input from a LINE VT because it will synchronize both bus.
For the tie-line BCU going to the new GIS, naming shall be DS23
and CB24. Rename the title page to LAS PINAS BAY 87 BCU
instead of TORIL BAY 73
~ Rename LINE VT input in BAY 87 BCU to TIE-LINE VT 2 input
for lat.
- Combine A8 (BCU panel 6) and A9 (BCU panel 7) BCUs into
‘one panel only. This is for the control of all the tie-line
breakers.
- Remove bay 13 BCU panel. There shall be only 11 BCU
panels because A8 and A9 will be combined in one panel
(tie-line bay BCU).
- Label MCSG meters panel to “MCSG meters”.
= Relocate the IED meters in each panel into eye-tevel
position. The positioning of the IED meter is too low.
- Please providelsubmit specs forthe IED meters to be used. The
parameter display values shall be customizable/configurable i.e.
In terms of decimal values
- Please submit TDS for the Substation Automation
‘System (SAS) beforehand.
XXX NOTHING FOLLOWS XXX
(CA) arrroveo AWET] APPROVED WI CORRECTIONS INDICATED [RFC] RETURNED FOR CORRECTIONS:
ee00~«~~=C«EDD RPCCOD | pepnoven ey
HK eZ
rev |
sua |