Вы находитесь на странице: 1из 3
TAddressoatey) Nhe Ohi) 9, 4 4 Hf Project Manager DOCUMENT TRANSMITTAL ENGINEERING DESIGN DEPARTMENT (address): ZHANG, Jt XIAN ELECTRIC ENG'G CO., LTD. ‘Manila Office Address: Unit 2101-2102 Raffles Corporate Center, Ortigas center, Pasig City, 1605 Tele: (632) 916-6518 Fax: 632) 916-6504 LAS PINAS SUBSTATION EXPANSION PROJECT | CSD No. (SP13.LPSEP.LT-0153) (Project Name & Schedule No., if applicable) (Our Reference: RPCCDD15-03-41 Date: March 25, 2015 Your Ref. Date: ENCLOSED FIND FOR YOUR PLEASE RETURN Tetier List Prints X_| DrawingsManuals Documents Brochures # of Copies 2_| # of Set(s)-Drawing/Calculation X__| Information Comments. Set (s) Evaluation Construction “Approval Copies K_| Revision OW (or BEFORE) Implementation X_| Reference DWG. /DOC. No. REV. DESCRIPTION REMARKS LAS PINAS SIS 1. Substation Automation System (SAS/MBSC) Panel Schematics X00 NOTHING FOLLOWS XXX Notes: Approval of these documents shall not be held to relieve XIAN or any part of XIAN’s obligation to meet the requirements of the Specifications nor of the responsibility for the correctness of these documents. ‘A | Approves INDICATED “act | Argpoven WinoRResTioNs: RFC | RETURNED FOR CORRECTION AWCI EDD. CEDD RPCCDD CHK. REV. ‘SUB. Fs REC. FM-EDD-O1A Rev. B ay DACTO-PRE HEADED NATIONAL GRID CORPORATION OF THE PHILIPPINES ENGINEERING DESIGN DEPARTMENT ENGINEERING SHEET DTFNO. RPCCDD15-03-41 _ Date: March 25, 2015 PROJECT: LAS PINAS SUBSTATION EXPANSION PROJECT (SP13.LPSEP.LT-0153) Sus.ecr: Documents for Approval Tem Ne Drawi Drawing No. Approval of these documents shall not be held to relieve XIAN's or any party of XIAN's obligations to meet all the requirements of the specifications nor of the responsibilty for the correctness of these documents LAS PINAS S/S 1. Substation Automation System (SAS/MBSC) Panel Awcl ‘Schematics - Provide system architecture showing networks, Ethernet switches, gateways, servers, HMls etc. then provide boll of materials for all the inclusive devices. = Show connecting of all IEDs. = Provide specs for LED monitor. = Provide specs for SAS server panel. - Provide control circuit of connection of DS and discrepancy switch. Refer to the attached drawing, - Provide /O list for primary and secondary devices to be interfaced on the BCUs of the SAS. - Specify clearly BCUs for AC and DC system main breakers. = AIlI/O from the BCU from shall be brought down to terminal block = All spare }O module /terminals of BCU should be included in the database build-up of the SAS and can be easily customized, = Provide bill of materials with brochures for all equipment and Peripherals (ie. printer, console, server, EWS, OWS, mobile ‘workstation etc.) to be supplied under this project. - Provide panel door front and rear view. Specify dimensions of the panels. 2200x800x600(HxWxD). - All panel rear doors shall be dual swinging type for “dual” type panels. - Refer to the attached 1/0 list for the alarms to be wired from primary and secondary devices included in this project. - Provide and specify auxiliary relay to be used by the BCU binary outputs for controlling of the DS. - There shall be another VT input for the BUS2 VT in the synchronizer of each BCU when the bay is connected to bus 2 and the coupler is open. The synchronizer shall be capable of selecting the BUS VT input depending on what BUS the bay is connecter (sr rroveo (GAWET] APpRovED wi CORRECTIONS INDICATED RETURNED FOR CORRECTIONS orp — APPROVED BY: ik -f REV suB ms REC | FM-EDD-01A NATIONAL GRID CORPORATION OF THE PHILIPPINES ENGINEERING DESIGN DEPARTMENT ENGINEERING SHEET OTFNO. _RPCCDD15-03-41 DATE: March 25, 2015 _— PROJECT: LAS PINAS SUBSTATION EXPANSION PROJECT (SP13.LPSEP.LT-0153) Susiect. Documents for Approval fen Drawing No. Drawing Title crepancy switch for control of the iagram of transformer BCUs. - Inthe BCU panel of the coupler the VT inputs for the synchronizer shall be from BUS1 VT and BUS2 VT. There shall be no input from a LINE VT because it will synchronize both bus. For the tie-line BCU going to the new GIS, naming shall be DS23 and CB24. Rename the title page to LAS PINAS BAY 87 BCU instead of TORIL BAY 73 ~ Rename LINE VT input in BAY 87 BCU to TIE-LINE VT 2 input for lat. - Combine A8 (BCU panel 6) and A9 (BCU panel 7) BCUs into ‘one panel only. This is for the control of all the tie-line breakers. - Remove bay 13 BCU panel. There shall be only 11 BCU panels because A8 and A9 will be combined in one panel (tie-line bay BCU). - Label MCSG meters panel to “MCSG meters”. = Relocate the IED meters in each panel into eye-tevel position. The positioning of the IED meter is too low. - Please providelsubmit specs forthe IED meters to be used. The parameter display values shall be customizable/configurable i.e. In terms of decimal values - Please submit TDS for the Substation Automation ‘System (SAS) beforehand. XXX NOTHING FOLLOWS XXX (CA) arrroveo AWET] APPROVED WI CORRECTIONS INDICATED [RFC] RETURNED FOR CORRECTIONS: ee00~«~~=C«EDD RPCCOD | pepnoven ey HK eZ rev | sua | Page 2 of 2

Вам также может понравиться