Академический Документы
Профессиональный Документы
Культура Документы
Edition 2014-04_1
SikaCor VEMY
SikaCor VEMY
Construction
Product
Description
SikaCor VEMY is 2 part, vinly-ester based coating and lining system with
extended pot-life.
Uses
Fast curing
Characteristics /
Advantages
Product Data
Form
Appearance / Colours
Packaging
Storage
Storage Conditions/
Shelf-Life
Technical Data
Chemical Base
Vinly Ester
Specify Gravity
~ 1.05
SikaCor VE MY
1/5
Mechanical / Physical
Properties
Barcol Hardness
> 34
Tensile Mudulus
~ 3.2 Gpa
Bond Strength
Flexural Strength
~ 150MPa
(ISO 4624)
Resistance
Thermal Resistance
Exposure*
Dry heat
Permanent
+80C
+80C
+100C
Chemical
Resistance
System
Information
System Structure
Still wet:
1 x SikaCor VEMY + Sika Reemat SM30
Top coat: Not required
Still wet:
1 x SikaCor VEMY + Sika Reemat CSM300
Still wet:
1 x SikaCor VEMY + Sika Reemat SM30
Top coat: Not required
Still wet:
1 x SikaCor VEMY + Sika Reemat CSM450
Still wet:
1 x SikaCor VEMY + Sika Reemat SM30
Top coat: Not required
SikaCor VEMY
2/5
Application Details
Consumption / Dosage
Product
Surface matt
Consumption
~0.55 kg/m
~0.01 kg/m
~0.55 kg/m
~0.01 kg/m
~0.55-1.10 kg/m
0.9 kg/m (mixed)
Product
Surface matt
Consumption
~0.55 kg/m
~0.01 kg/m
~0.55 kg/m
~0.01 kg/m
~0.55-1.10 kg/m
1.8 kg/m (mixed)
Product
Surface matt
Consumption
~0.55 kg/m
~0.01 kg/m
~0.55 kg/m
~0.01 kg/m
~0.55-1.10 kg/m
2.5 kg/m (mixed)
Note: These figures are theoretical and do not allow for any additional material
required due to surface porosity, surface profile, variations in level or wastage, etc.
SikaCor VEMY
3/5
Substrate Preparation
carried out using appropriate products from the Sikafloor , Sikadur and Sikagard
range of materials.
The concrete or screed substrate has to be primed or levelled in order to achieve
an even surface.
High spots must be removed by e.g. grinding.
All dust, loose and friable material must be completely removed from all surfaces
before application of the product, preferably by brush and/or vacuum.
Application Conditions /
Limitations
Substrate Temperature
Ambient Temperature
Substrate Moisture
Content
Dew Point
Beware of condensation!
The substrate and uncured floor must be at least +3C above the dew point to
reduce the risk of condensation or blooming on the floor finish.
Application
Instructions
Mixing
Mixing Time
Prior to mixing, stir part A mechanically. When all of part B has been added to part
A, mix continuously for 1 2 minutes until a uniform mix has been achieved.
To ensure thorough mixing pour materials into another container and mix again to
achieve a consistent mix.
Over mixing must be avoided to minimise air entrainment.
Mixing Tools
SikaCor VEMY must be thoroughly mixed using a low speed electric stirrer (300 400 rpm) or other suitable equipment.
Application Method /
Tools
Prior to application, confirm substrate moisture content, r.h. and dew point.
Cleaning of Tools
Clean all tools and application equipment with acetone immediately after use.
Hardened and/or cured material can only be removed mechanically.
Attention: Acetone is a flammable liquid, please handle with care, use all
equipment for your personal protection required.
SikaCor VEMY
4/5
Notes on Application /
Limitations
Curing Details
Curing and operation
o
time (+20 C):
Construction
Note: Times are approximate and will be effected by changing ambient conditions.
Value Base
All technical data stated in this Product Data Sheet are based on laboratory tests.
Actual measured data may vary due to circumstances beyond our control.
For information and advice on the safe handling, storage and disposal of chemical
products, users shall refer to the most recent Material Safety Data Sheet
containing physical, ecological, toxicological and other safety-related data.
Legal Notes
Phone: +606-7991762
Fax:
+606-7991980
e-mail: info@my.sika.com
www.sika.com.my
SikaCor VEMY
5/5