CRS(1:6)
C.C.Bed
(1:2:4)
8mm dia 6"c/c
Brickwork(1:6)
8" wall
Plastering
12mm thick
CM (1:4)
Cement
0.1125
0.034
3.31
195
645
Cu.m
Cu.m/ bag
bags
Rs.per bag
Total Rs.
Sand
0.45
1840
0.83
560
464
Cement
Sand
1.8 bags/m3
0.36
195 Rs.per bag
1840
0.66
560
351 Total Rs.
371
Cement
0.21
0.034
6.18
195
1204.41
Sand
Cu.m
0.42
Cu.m/ bag
1840
bags
0.77
Rs.per bag
560
Total Rs.
433
Cement
Sand
1.35 bags/cu.m
0.27
195 Rs.per bag
1840
0.50
560
263.25 Total Rs.
278.208
Cement
Sand
0.12 bags/m2
0.016
195 Rs.per bag
1840
0.02944
560
23.4 Total Rs.
16.4864
Cu.m
Kg/Cu.m
tons
Rs/ ton
Total Rs.
Aggregate
0.9 Cu.m
282.24 Rs/cu.m
254 Total Rs.
Stones
Cu.m
1.25
Kg/Cu.m
99
tons
124
Rs/ ton
6
Total Rs.
742.5
Cu.m
Kg/Cu.m
tons
Rs/ ton
Total Rs.
labour
40
132.35
0.05
6.62
6 Total Rs.
Water
1475
42
Rate/cu.m Rate/Cft
1594
Steel
35
216.17647
0.05
10.81
litre/bag
litres
Rs./litre
Total Rs.
Labour
500 nos/m3
2 Rs. Each
40 kg
28,600 Rs/ton
195
Rate/cu.m Rate/Cft
4.28 Rs./cu.m
Water
Rate/cu.m Rate/Cft
1.5 %
26.04687
Water
45
Labour
195 Rs./m3
105.84 Rs/cu m
105.84 Total Rs.
3.5 Rs/cft
123.48 Rs/cu m
stones
Rs./stone
Total Rs.
282.24 Rs/cu.m
237 Total Rs.
Rate/cu.m Rate/Cft
3 Rs/cft
labour
Cu.m
Aggregate
0.84 Cu.m
per m2
Kg/Cu.m
tons
Rs/ ton
Total Rs.
litre/bag
litres
Rs./litre
Total Rs.
Water
Bricks
per cu.m
Kg/Cu.m
tons
Rs/ ton
Total Rs.
Water
1763
50
Rate/sq.m Rate/Sft
35 Rs/m2
1.5 %
35 Total Rs.
1.12
76
Marble flooring
With Slabs
Marble
52 Rs/Sft
Amount
With tiles
52
Marble
43 Rs/Sft
Amount
43
Tiles
Cement
Sand
0.0072 per m2
0.107 per m2
0.20571 bags/m2
1840 Kg/Cu.m
0.00583 bags/sft
0.19688 tons
560 Rs/ ton
110.2528
1.13703
3.1250794
Cement
Sand
0.0072 per m2
0.107 per m2
0.20571 bags/m2
1840 Kg/Cu.m
0.00583 bags/sft
0.19688 tons
560 Rs/ ton
110.2528
1.13703
3.1250794
Cement
Cement for slurry
0.0072 per m2
0.0057 bags/sft
0.20571 bags/m2
0.00583 bags/sft
Ceramic flooring
19.64 Rs/sft
Tiles
195 rs./bag
1.1115
1.13703
Cement
Ceramic cladding
0.00699 bags/sft
28 Rs/sft
Water proofing
Cement
0.039 bags/sft
195
7.605
1.36364
Sand
0.00546
1840
0.01
560
6
Sand
0.002634
1840
0.0048466
560
2.7140736
0.0769295
Labour
12
Water
72
Rate/Sft
6 Rs/SFT
5 Rs/SFT
11
0.9175366
Labour
0.107
1840
0.19688
560
110.2528
3.1250794
Rate/Sft
1.0675366
Labour
510 rs./bag
2.907
Sand
Water
7 Rs/SFT
5 Rs/SFT
510 rs./bag
2.907
White
Cement
0.0057 bags/sft
per m2
Kg/Cu.m
tons
Rs/ ton
Grouting
Material
Water
62
Rate/Sft
3.75
2.75
6.5
0.4727041
Labour
Water
32
Rate/Sft
per m2
Kg/Cu.m
tons
Rs/ ton
Cinder
Cu.m
Kg/Cu.m
tons
Rs/ ton
White
Cement
0.0057 bags/sft
0.75
Labour
6
Water
0.54
37
Rate/Sft
16.8 kg/sft
950 Rs/ton
15.96
13
PAINTING
ACE
Primer
Ace 2-coats
Coverage
75 sft/ltr
50 sft/ltr
rate/L
rate/sft
Labour
Rate/Sft
Round Up
74.43
0.9924
98.38
1.9676
2.96
1.25
4.21
4
OBD
Primer
OBD 2-COATS
Coverage
75 sft/ltr
50 sft/ltr
rate/L
rate/sft
Labour
Rate/Sft
74.43
0.9924
36.71
0.7342
1.7266
0.82
2.55
OBD
Primer
OBD 2-COATS
Altek
Coverage
75 sft/ltr
60 sft/ltr
6.4 sft/kg
rate/L
rate/sft
Labour
Rate/Sft
74.43
0.9924
45.64 0.760667
8.4
1.3125
3.065567
3.45
6.52
0.63
43
3.5
10
Granite flooring
Slabs
Tan brown
Amount
With tiles
cibaca pink
tan brown
black pearl
Amount
Slabs
ruby red
Amount
tiles
ruby red
Amount
Balcony Railings
per floor
fixing in masonry
transport
Marble
87.5 Rs/Sft
87.5
Marble
54 Rs/Sft
54
Marble
138 Rs/Sft
138
Marble
65 Rs/Sft
65
416.62 sft
416.62 sft
Cement
Sand
0.0072 per m2
0.107 per m2
0.20571 bags/m2
1840 Kg/Cu.m
0.00583 bags/sft
0.19688 tons
560 Rs/ ton
110.2528
1.13703
3.1250794
Cement
Sand
0.0072 per m2
0.107 per m2
0.20571 bags/m2
1840 Kg/Cu.m
0.00583 bags/sft
0.19688 tons
560 Rs/ ton
110.2528
1.13703
3.1250794
Cement
Sand
0.0072 per m2
0.107 per m2
0.20571 bags/m2
1840 Kg/Cu.m
0.00583 bags/sft
0.19688 tons
560 Rs/ ton
110.2528
1.13703
3.1250794
Cement
Sand
0.0072 per m2
0.107 per m2
0.20571 bags/m2
1840 Kg/Cu.m
0.00583 bags/sft
0.19688 tons
560 Rs/ ton
110.2528
1.13703
3.1250794
70 rs/sft
5.5 rs/sft
500 rs/floor
29163.4 Rate/Floor
2291.41
500
31954.81
31,955
38.5 per kg
200 per flat
600 per flat
35035 Rate/Floor
200
600
35835
35,835
Main Door
Wooden Window
Wooden Window
3'3" x 7'
6' x 4'
5' x 4'
Each toilet
pvc
gi
c.p
rs.
ceramic
16,256 per toilet
(excluding labour)
pvc
gi
taps
rs.
wb
10,600 per flat
(excluding labour)
750 per balcony
(excluding labour)
Kitchen,utility,hall
balcony lines
9,683 rs/door
7,608 rs/window
6,944 rs/window
Cement
slurry
0.0057 bags/sft
Labour
195 rs./bag
1.1115
Cement
slurry
0.0057 bags/sft
11
Labour
195 rs./bag
1.1115
1.5581041
Water
Labour
105
Rate/Sft
0.9956041
Water
67
Rate/Sft
11
195 rs./bag
1.1115
Cement
slurry
0.0057 bags/sft
Rate/Sft
7 Rs/SFT
195 rs./bag
1.1115
Cement
slurry
0.0057 bags/sft
Water
11 Rs/SFT
11
Labour
2.3156041
Water
157
Rate/Sft
7 Rs/SFT
1.1606041
79
3033
86