Cesar Chavez Bus Stop Improvements Project

Metro Service Councils| January 2017

IMPROVEMENT SITES

1
2
6
METROLINK
& AMTRAK
PLATFORMS

3
4

METRO BUS LINES 33, 68,


70, 71, 78, 79, 378, 733

METRO BUS LINES 33, 40,


68, 70, 71, 78, 79, 378, 442,
733

METRO BUS LINES 40, 68,


70, 71, 78, 79, 378, 770

DISCHARGE ONLY
METRO BUS LINES 40, 442

5
PATSAOURAS
BUS PLAZA

TRANSIT
PAVILION
SITE

50

200

TRANSIT PAVILION SITE


METRO BUS LINES 68, 70,
71, 78, 79, 378, 770
UNDERPASS LIGHTING
AND WAYFINDING
TREATMENT (OPTIONAL)

METRO GOLD LINE


METRO RED/PURPLE LINE
METRO SILVER LINE
1

Cesar Chavez Bus Stop Improvements Project


VICINITY SITE PLAN
IMPROVEMENT SITES
METRO BUS LINES:
33, 68, 70, 71, 78, 79, 378, 733
METRO BUS LINES:
33, 40, 68, 70, 71, 78, 79, 378,
442, 733
METRO BUS LINES:
40, 68, 70, 71, 78, 79, 378, 770
DISCHARGE ONLY
METRO BUS LINES: 40, 442
TRANSIT PAVILION SITE
METRO BUS LINES:
68, 70, 71, 78, 79, 378, 770
UNDERPASS LIGHTING
AND WAYFINDING
TREATMENT
METROLINK + AMTRAK
PLATFORMS
CONTINENTAL CROSSWALKS
PATSAOURAS BUS PLAZA

Cesar Chavez Bus Stop Improvements Project


PROJECT SCOPE: SITES 1 & 2

Cesar Chavez Bus Stop Improvements Project


PROJECT SCOPE: SITES 3 & 4

Cesar Chavez Bus Stop Improvements Project


PROJECT SCOPE: SITE 5 Transit Pavilion Site

Cesar Chavez Bus Stop Improvements Project


PROJECT SCOPE: Transit Pavilion Elements to be included

2
1
AMENITIES
1. Shade structure
2. Seating for transit riders
3. System maps & real time signage
4. Bicycle lockers
5. Bicycle racks
6. Bike share kiosk
7. Enhanced landscaping
N

3
5

7
4

6
6

Cesar Chavez Bus Stop Improvements Project


PROJECT STATUS

Designer chosen Gensler


Task 1: Site analysis completed
Task 2: Precedent studies, Metro design criteria,
and design vision in progress

Cesar Chavez Bus Stop Improvements Project


SITE ANALYSIS: SORROUNDING CURRENT USE

8 8

Cesar Chavez Bus Stop Improvements Project


SITE ANALYSIS

Cesar Chavez Bus Stop Improvements Project


SITE ANALYSIS
Landscape
30

25

25

20

20

15

15

10

10
5

0
Existing trees

30

Seating

Hardscape

Traditional

Green space

Bike Facilities

20
15
10
5
0
Bike storage

Flexible

Shelters

25

Bike racks

Integrated

Bike share

40
35
30
25
20
15
10
5
0

Traditional

Non-Traditional

Innovative
10

Cesar Chavez Bus Stop Improvements Project


SITE ANALYSIS

Safety

Visual Guides

20
15
10
5
0
Emergency
communication

Security
Cameras

On-site security

30
25
20
15
10
5
0
Area WayfindingReal-time digital
signage

Interactive
transit
information

Vendors

Amenities/Special Features
15

20
15

10

10
5

0
Enhanced
lighting

Charging
stations

Web Access

0
Coffee cart Food cart Fruit cart Food truck
11

Cesar Chavez Bus Stop Improvements Project


PROJECT GOALS
The space should be:
SAFE
COMFORTABLE
INTUITIVE
INFORMATIVE
MAINTAINABLE
BEAUTIFUL

12

Cesar Chavez Bus Stop Improvements Project


NEXT STEPS
DESIGN VISION:
Build a strong conceptual design that satisfies operational
and maintenance needs.
OUTREACH
Host onsite Community Meeting #2 to be held in late
January for one peak period.
Increase online presence, including a survey.
35% DESIGN
Gensler to prepare 35% Design from selected vision.
Metro to circulate 35% Design to review team.
13

Cesar Chavez Bus Stop Improvements Project


DESIGN SCHEDULE & PROCESS
2017

2016
Dec
Task 1:
Site Analysis

Jan

Feb

Mar

Apr

May

June

July

Aug

Sep

Complete

Task 2:
Precedent Studies,
Design Vision
Task 3:
35% Design
Task 4:
85% Design
Task 5:
100% Design
Task 6:
Final AFC Design
Construction Procurement
Process
Metro Review of Draft Deliverable

14

Cesar Chavez Bus Stop Improvements Project


STAY IN TOUCH

Marie Sullivan