Академический Документы
Профессиональный Документы
Культура Документы
Page 1 of 5
1.
2.
3.
Shall not
Should
May
Shall
4.
Cracks
Incomplete penetration
Laminations
Slag
Vessel engineer;
Owner-user or the inspector
Corrosion Engineer
NDE engineer
/var/www/apps/conversion/tmp/scratch_1/342194245.doc
1/10/2017 / 2:59:21 PM / NCD
Page 2 of 5
6.
7.
9.
8.
4
3
3.5
2.5
U1
U2
U
None of these
/var/www/apps/conversion/tmp/scratch_1/342194245.doc
1/10/2017 / 2:59:21 PM / NCD
Page 3 of 5
13.
Renewal of vessel
Repair of vessel
Alteration to vessel
Re-rating of vessel
/var/www/apps/conversion/tmp/scratch_1/342194245.doc
1/10/2017 / 2:59:21 PM / NCD
Page 4 of 5
15.
Liquid Penetrant
Magnetic particle
Radiography
All of above.
16.
2
3
4
None of these
True
False
Depends on company policy
Depends on Third party inspectors discretion.
/var/www/apps/conversion/tmp/scratch_1/342194245.doc
1/10/2017 / 2:59:21 PM / NCD
Page 5 of 5
19.
Longitudinal Joint
Circumferential Joints
Both are equally critical as per ASME Sec. VIII, Div.1
Depends on QA plan
20.
P Nos
F Nos
S Nos
A - Nos
/var/www/apps/conversion/tmp/scratch_1/342194245.doc
1/10/2017 / 2:59:21 PM / NCD