Академический Документы
Профессиональный Документы
Культура Документы
Vessel: sara
Port:
Nos of VEC line(s) conn.:
A:
1:
2:
3:
4:
5:
6:
7:
B:
C:
1:
2:
D:
1:
2:
3:
4:
5:
6:
7:
E:
1:
2:
3:
4:
5:
GENERAL:
Twenty-four (24 hrs.) prior to Cargo Transfer Operations:
SHIP
SHORE
Have the IGS been shut down and the Isolation Valves on Deck closed ?
Have it been ensured that the Vapour Line blind flange(s) are securely positioned before berthing or before line connection takes place ? and
Have all vapour manifold valves and all drain valves on vapour collection headers been
opened and have it been confirmed that all condensate is drained from the system ?
Have all vapour manifold valves and all drains been fully closed again after completion
of the above required draining ?
Prepared by:
Revision no.:
Revision date:
JVP
0
2002-03-15
Approved by:
Page:
ID:
PWC
1/2
040-020
TORM
F:
1:
2:
3:
G:
1:
2:
GENERAL:
During the Cargo Transfer Operations:
2:
3:
4:
5:
6:
7:
8:
2:
SHIP
SHORE
SHIP
SHORE
- that high pressure alarm is set at no more than: ___________% of the lowest pressure
relief valve setting in the venting system ?
- that the low pressure alarm is set at not less than: _________ psi ( _________ bar) ?
- that in the event of the pressure increasing to high the action to be taken (cross out):
1): slow down the loading rate or;
2): increase the opening of the regulator valve on the shore vapour line.
- that in the event of the pressure decreasing too low the vessel shall notify the shore
facility in order to minimize the opening of the shore vapour regulating valve ?
- that in the event that item 3 and 4 cannot be accomplished the loading and vapour
collection shall be terminated and all cargo- and vapour valves shut immediately ?
- that cargo- / vapour collection operations can be resumed as soon as shore facility
have stabilized their systems ?
- that upon completion of the vapour emission operations, the vapour manifold valves
shall be closed immediately, the vapour hose(s) removed and blank(s) refitted ?
- that segregation valves can be closed and IG deck isolation valves opened ?
SHORE
Have the vessels vapour emission control valve been opened before commencing the
transfer ?
Have the monitoring of the rate of transfer, the tank gauging system, the overfill alarmand pressure systems been agreed upon between vessel and terminal ?
Have the Officer in Charge of the vessels cargo operations determined with the Person
in Charge of the Shore Facility when to stop the loading of a particular product and
when to commence loading of another product ?
SHIP
Have all tank gauge housings and electrical connections on deck been checked for deterioration and / or any other damage at every 3 months intervals ?
Have tests of AC/DC power source switches, power failure alarms, high level alarm for
each tank etc. been carried out prior to commencement of this cargo- and vapour emission operation and as described in the vessels planned maintenance program ?
FOR TERMINAL:
FOR VESSEL:
Rank / Position
Rank / Position
Name in Capitals
Name in Capitals
Signature
Signature
Prepared by:
Revision no.:
Revision date:
JVP
0
2002-03-15
Approved by:
Page:
ID:
PWC
2/2
040-020