Вы находитесь на странице: 1из 6
ES Jazan Integrated Gasification Combined Cycle Ger (‘sIGCC") Project Package No. 06, Sea Water System TRANSMITTAL From: HEC DATE: Jan 9.2016 Me Yang Zhiyuan TRNO, : CHEC-JIGCC6OOK:T2477 CConnator Representative CONTRACT NO, 26500033569(00K) ‘6600033568(1K) REFERENCE: N/A | "To: Company Representative: Mr Stakir Magharbel LIDRAVINGS ~~ IISFECIFICATION LT FLOT PLAN ROR} ueroLLowne [patasHeers [CALCULATION (OMATERIAL REQUISITION Ome [venpor pocuwmnt [Mos ClrRocepuRE C] CORRESPONDENCE —_CJOTHERS Darerova, — Oreviw msromsario amemeansumrte? | peconD [ACTION “THs 8 BORCWAL —_[JRevision Denar SEAWATER SYSTEN CRS AMLILDOCVEIGEE ALM m ‘AN OF PeLINES wm fos ‘Yang Zhiyuon/Conracor Representative (Dlascetrr nor require beceurrnzoumen (ease acknov.nce TE RECHPT OFTHE DUPLICATE AND RETURNBY P29 {THE ABOVE DOCUMENT RECEIVED BY 1 - wes eo0o or-¥o--e00IrOAHO seve sveoen ee pasa sen wom ' Tae RIO PIO ROTA poy ooy | ames an 2saoésog 9) opEs3 seme cunavermeny | wenn | Se arrose Fig FeHUBUEH Sug | SiLSB-ENOG-GSNSasDOOI | SOUNEIY Winery jwoMED =f Slee [Satan Ee wa Swereo | Oy | «sav RIzraNOOgHTOY SHO Ag pamanney Ag payooua, ‘Ag posedeig meq suo | “ON “‘AoU SUD FON SUD = aoe Sranioeiaa — SOOT | WN HOWE TAND WOES BIEN HS BON aIPUE Tled OTT] MUR HTT eeaaammreame (Sa9)14HS NOLLA TOS LNAIWOD & Jazan Integrated Gasification Combined Cycle (“JIGCC") Project “za nogated DOCUMENT | Ae%-H-D00-vE-721008 canton, | Pact lens sun (Gioec} Project | - REVISION % TSSUEDBY | CHEC | WSSUEDDATE | *Janunry2016 | PAGE [1/1 Paints of pipelines | DocumantNo: ABI-#-D0C-VE-T21608 Revision oo Date oftssue : 9" January 2016 Name “ile Date | Signature Disciptine r Prepared By | Tu Hoag 941.2016 for Enginoering Discipline s checked ay | LiHonaiun orzo | Kae Leader Engineering 5 jrmed By | Cai Wei a corr tere | 8 | DAR pH aS ASRSEA NOTE: This document anal fx contri th propery of CHEG, tis confidential ands given to you for 3 tito purpose and must be returned on raquast. Nether this dacument nor any Information conceming tna be copied, eid efumished to ators without he consent of CHEC, ‘SAUDI ARABIAN OIL COMPANY PROJECT SPECIFICATION PAINTS OF PIPELINES = SEA WATER SYSTEM JAZAN INTEGRATED GASIFICATION COMBINED CYCLE (JIGCG") PROJECT PACKAGE NO. 06, SEA WATER SYSTEM ov | a rst [ Pw [ex | aoe |r| Sar oo a ee ae i 09 JAN 2016 epzetey oan Ou HaCHO gor soars 0000) sta oREND NGAUS Cason eee s2arous 200%) 049 OaNaNEENOLNOLIWS CLASSI WWE

Вам также может понравиться