Вы находитесь на странице: 1из 17

REPORT

FOR
GSM/CDMA/
WIMAX
(CM SECTION)

BONGAIGAON
SSA

PLANNING
FOR NEW
PROPOSED
BTS (2G)
OF
BONGAIGAON
SSA

AT A GLANCE
-------- BTS proposed by considering NH coverage,
Railway Coverage, SH coverage with populated
Village having commercially strength.
(Detail in sheet)
---------- Proposed 2G BTS = 165 Nos.
(Details & summary in sheet)
---------- Media details with requirement of Battery &
Power plant available in sheet.
---------- District wise Map available with marking of
Proposed & existing 2G BTS.

AT A GLANCE
-------- 3G BTS proposed by considering NH coverage,
Railway Coverage, SH coverage & Urban, SemiUrban area.

(Detail in sheet)
--------

Proposed Expansion in 3G BTS = 74 Nos.


(a) Proposed 3G BTS in existing
2 G sites = 39 Nos.
(b) Exclusively Proposed 3G sites
= 35 Nos
(Details & Summary in sheet)

---------- Media details with requirement of Battery &


Power plant available in sheet.

Majaor Difficulties for improving QoS/Availibility of


mobile networks
Posting of staffs in field units.
Provisioning of OFC ring in major rout.
Repairing of DG sets and providing of DG start
Battery.
Allotment of Power Plant (which are not supplied
since last 4years).
Allotment of Battery.
Provisioning of DG in only ASEB sites( 14 sites)

Repairing of ACs (Mostly required in Node-B sites)


Payment of House rent to Land Lord.
Regular Payment of ASEB bills.
Provisioning of caretaker in unmanned BTS sites.

BRIEF DATA REGARDING


2G BTS/NODE-B
OF BONGAIGAON SSA
FOR
DEVELOPMENT MEETING
ON
DATED 03-06-2016

VISITING DOCUMENTS
(CM SECTION- BONGAIGAON SSA)
INCLUDUNG GSM/CDMA/WIMAX)

VISITED BY Honble
CGMT, Assam Circle & GM
(CM), CIRCLE OFFICE
GUWAHATI

SUMMARY OF CM SECTION
EQUIPMENTS OF CM SECTION
Sl. No

Total nos of
BSC

Total Nos
of RNCs

4 Nos

2 Nos.

Total
Nos of
2G BTS
224
Nos.

Total
Nos. of
Media
gateway
1

MPBN
Router
1+1

Total
nos. of
3G
BTS
129
Nos.

Total
Nos. of
CDMA
BSC
1 No.

Total
nos of
CDMA
BTS
41
Nos.

Total
Nos. of
WiMax
BTS
58 Nos.

BSC wise loaded of 2G BTS/Node-Bs


Sl. No

Name of BSC

Total nos. of
Loaded BTS

Name RNCs

Total
nos.

Name of
CDMA

Total nos
Loaded

Total
Nos of

Loaded
BTSs
1
2
3
4

Bongaigaon
Barpeta
Road
Nalbari
Dhubri

86

Bongaigaon
Barpeta |
Road

89

64

BSC
Barpeta
Road

CDMA
BTS
41

Towers
224+15=
239

65

42
7

Proposed MSC/BSC Location


MSC= At Bongaigaon (Approved by CO)
BSC = At Goalpara (Approved by CO)
Present Staffs Available under CM Section
(1)
(2)
(3)
(4)

DET
SDE
JTO
TTA

=
=
=
=

One
Two
One
Two

DETAIL STATUS OF INFRA WITH BTS & MEDIA


AS ON DTD.10-08-2016
1. Madhupur (i) BTS Installed & Media tested with battery.
(ii) Transformer faulty since last 4days ( i.e One phase is not coming)
(iii) DG tested & presently DG bty. is not available at site.
2. Boribag Bonbag (i) BTS installed
(ii) Media is not tested
(iii) Battery & P/P is avl. at site. But, it is not installed.
(iv) Electricity is not available.
(v) DG is not tested & DG Bty. is not available site.
3. Bajali Choukati (i) Installation of BTS is in progress.
( ii) Media is not tested
(iii) Battery & P/P is not avl. at site.
(iv) Electricity is not available.
(v) DG is not tested.

4.

Gobardana

(i) BTS is avl. at site. Not installed due to water logging at site.
( ii) Media is not tested
(iii) Battery & P/P is not avl. at site.
(iv) Electricity is available.
(v) DG is not tested.

5.

Jaleswar

(i) BTS shifting & installation will be done before 20th August.
(ii) Media is not tested
(iii) Battery & P/P is not avl. at site.
(iv) Electricity is not available.
(v) DG is not tested.

DISCUSSION OF FOLLOWING AGENDA FOR CM METTING ON DATED


19th & 20th August-2016
1.Measures taken to improve the uptime of BTSs and Node-Bs.
(i)
2. Relocation of low traffic BTSs and low data Node-Bs :Details Action Sitewise:Node-Bs
(i)
Rakhaldubi to Bhakarvita -- Already shifted. Other Work is progress.

(ii)

Chithilla to Sapatgram Work will completed during this month.


2G BTS--- Now it is proposed to shift USO BTS to IP sites. Due to water logging in
USO sites, the said work are delayed. During this month two sites will be relocated.
This is purely indoor BTS, because existing outdoor cabinet of USO sites have
already been damaged

3.NEP Data:- Tender part completed. Agreement with is in progress. Then work order will be
issued. This will be done within this week.
4.IP fication of Node-Bs:- All Node-Bs have already been ip-fied. But, three Node-Bs are
integrated & tested in IPs. Due to non-availibilty of ETMFX cards, 3nos. Node-Bs areworking
in ATM. So, 3 nos. of ETMFX card are reuired for the same.
6. Addition of more E1s in data potential 2G BTS:- Five nos have already been done. Work is
progress for further. It is delayed due to allotment of PCMs from ETR section.
7. Conduction of inter SSA wise Drive test;8. AT of phase-VII BTS:- Installer i.e M/s ZTE is not coming to site for carrying out AT of 2G &
Node-Bs.
9. Tender work for redeployment work of BTS:- E-tender preparation is completed which will be
floated during this week.

IP SITE POSSESSION
BGN/CMTS/IP-Sites/15-16

REDEPLOYMENT OF BTS 2G/3G


BGN/CMTS/REDEPLOYMENT/15-16

WELCOME

VISIT of Honble
GM(CM), GM (CFA/Mktg.) &
DGM (CSC) Assam Circle.

SUMMARY OF CM SECTION
EQUIPMENTS OF CM SECTION

Sl. No

Total nos of
BSC

Total Nos
of RNCs

4 Nos

2 Nos.

Total
Nos of
2G BTS
229Nos.

Total
Nos. of
Media
gateway
1

MPBN
Router
1+1

Total
nos. of
3G
BTS
131
Nos.

Total
Nos. of
CDMA
BSC
1 No.

Total
nos of
CDMA
BTS
41
Nos.

Total
Nos. of
WiMax
BTS
58 Nos.

BSC wise loaded of 2G BTS/Node-Bs


Sl. No

1
2
3
4

Name of BSC

Total nos. of
Loaded BTS

Bongaigaon

87

Barpeta
Road
Nalbari
Dhubri

Name RNCs

Bongaigaon
Barpeta |
Road

90

Total
nos.
Loaded
BTSs
65

Name of
CDMA
BSC
Barpeta
Road

Total nos
Total
Loaded
Nos of
CDMA
Towers
BTS
41
224+15=
239

66

44
8

Proposed MSC/BSC Location


MSC= At Bongaigaon (Approved by CO)
BSC = At Goalpara (Approved by CO)
Present Staffs Available under CM Section
(1)
(2)
(3)
(4)

DET
SDE
JTO
TTA

=
=
=
=

One
Two
One
Two

Majaor Difficulties for improving QoS/Availibility of


mobile networks
Posting of staffs in field units.
Provisioning of OFC ring in major rout.

Repairing of DG sets and providing of DG start


Battery.
Allotment of Power Plant (which are not supplied
since last 4years).
Allotment of Battery.
Provisioning of DG in only ASEB sites( 14 sites)
Repairing of ACs (Mostly required in Node-B sites)
Payment of House rent to Land Lord.
Regular Payment of ASEB bills.
Provisioning of caretaker in unmanned BTS sites.

CMTS OPERATIONAL PART


DAILY MAINTENACE WORK
Attending VSWR Alaram
(But not receiving alaram list in every month)
RF optimization/Drive test
Addition of 2nd E1 in each CAT-A BTS
(Already six sites completed)
Addition of BTS in Dhubri BSC
( 9 Sites Connected)
Connectivity of BRD RNC to Bongaigaon MPBN
(To be complete in next week by rearranging of
MADM)

Cleanness of BTS.
Inspection of BTS
Target given to field SDEs for conversion of CAT-B
to CAT-A & CAT-C to CAT-B
Attending the hardware fault of BTS
Re-location of Node-Bs ( From low traffic site)
(Already two completed)
Completion/uploaded of all data in NEP Portal
Shifiting of BTS from closing USO sites
( 23 Completed out of 38 sites)

MAINTENACE ISSUES
Allotment of ETMFX Cards for IP (3 Nos.)
Addition of AMC of 40 sites
(For Both M/s ZTE & SSA)
Allotment of Power Plant (which are not supplied
since last 5years).
Requirement of at least 2 nos. of Trolly mounted
DG
Requirement of at least 2 nos. of Transformer (Low
Capacity) for keeping reserve.
Allotment of Drive test tools (mainly 3G) for RF
optimization.
Allotment of Transmission equipment( STM1CPE(DC Types)
Provisioning of DG in only ASEB sites( 14 sites)
Deletion of WEB docket before March-2014

(Having RU-14 Nos., DXU23=3 Nos,


DXU31=2Nos, CDU = 2Nos. TRU etc.)
Restoration of Node-Bs are not being
automatically after restoration of IP media in
Bongaigaon RNC.

CMTS PLANNING PART


PLANNING ISSUES
Allotment of Battery & Power Plant for new sites
( For Phase-VII add on Projects)
Arrangement of outdoor cabinets for indoor BTS
installing in IP sites
Allotment of feeder cable & Connector, Rokstack
etc. for new sites