1
GENERAL............................................................................................3
1.2
QUALITY ASSURANCE.......................................................................3
1.3
DESIGN PARAMETERS......................................................................3
1.4
1.5
SUBMITTALS......................................................................................4
1.6
PRODUCTS.........................................................................................5
1.6.1 GENERAL...........................................................................................................5
1.6.2 EARTH ELECTRODES.......................................................................................5
1.6.3 ELECTRICAL EARTHING CONDUCTORS:......................................................7
1.6.4 EARTHING CONNECTORS AND DEVICES.....................................................7
1.6.5 MAIN EARTH TERMINAL.................................................................................7
2
EXECUTION.......................................................................................7
2.1
INSTALLATION...................................................................................7
Page 2 of 9
HGEC
EARTHING SYSTEM
SECTION 12.0
1.1
GENERAL
A.
1.2
1.3
QUALITY ASSURANCE
A.
The Contractor is responsible for the quality of all its purchased
items and as such, must develop and submit a supplier quality
inspection plan to review. The inspection plan is to cover those
items intended for shop inspection and the procedures for carrying
out same.
B.
C.
2.
BS 7671
3.
IEC Commission
International
4.
IEC 364-5-54
protective conductors.
Earthing
Electrotechnical
arrangements
and
DESIGN PARAMETERS
The system shall be designed and installed as per BS-7671, BS7430, BS-6651, IEC
479, BS 6701 and applicable local regulations
such as those issued by DEWA, ETISALAT
and
other
relevant
organizations.
The building shall be provided with a totally integrated system
protecting the whole
of the power system(s) from the main incoming
power supply to the end-user
equipment. The integrated system(s)
shall comprise of the DEWA incoming mains earthing
system,
Communications and IT equipment earthing, Generator earthing,
Static earthing, Lightning Protection systems and any other special
earthing systems. Where there are separate buildings on the same site,
Page 3 of 9
HGEC
EARTHING SYSTEM
SECTION 12.0
Page 4 of 9
HGEC
EARTHING SYSTEM
1.4
1.5
SECTION 12.0
B.
SUBMITTALS
A.
Manufacturer's Data:
Submit manufacturer's data including
specifications, and dimensions for equipment and materials.
B.
2.
3.
4.
Page 5 of 9
HGEC
EARTHING SYSTEM
1.6
SECTION 12.0
PRODUCTS
1.6.1 GENERAL
A.
B.
C.
D.
E.
F.
G.
H.
Page 6 of 9
HGEC
EARTHING SYSTEM
A.
SECTION 12.0
C.
D.
E.
Page 7 of 9
HGEC
EARTHING SYSTEM
F.
G.
H.
I.
SECTION 12.0
J.
K.
L.
2.
3.
Page 8 of 9
HGEC
EARTHING SYSTEM
SECTION 12.0
A.
B.
main earth
incoming
Bond all main equipment and plant to the nearest earth terminal
bar.
Connect main equipotential bonding conductors to main earth
terminals.
Connect each earth terminal to all other earth terminals by a ring
conductor sized in accordance with BS 7430 and BS 7671.
EXECUTION
2.1
INSTALLATION
A.
Page 9 of 9